Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.2 L+₹64,963 (3.93%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-PreQual/Technical | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.6 L
EMD Value
₹16,500
Closing Date
17 Aug 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, EUDC,BAREILLY
35-BRapur Garden Bareilly
For the work of Construction of New LT 250 KVA T/F at Ashutosh City Near Nahar and For the work of Construction of New LT 400 KVA T/F at Barrier No. 2 under EUSD-VII Bareilly for strengthening of Electrification System Under EUDD-IV, Bareilly
2023_MVVNL_820615_2
T-57/EUDCB/2023-24
Open Tender
Electrical Works
Item Rate
30 days
EUDD-IV
AS PER TENDER FORM
3 documents required · 3 mandatory
₹3,540
SE, EUDC
₹16,500
19 Dec 2023
7 Aug 2023
18 Aug 2023
7 Aug 2023
17 Aug 2023
7 Aug 2023
Amount
For the work of Construction of New LT 250 KVA T/F at Ashutosh City Near Nahar under EUSD-VII Bareilly for strengthening of Electrification System Under EUDD-IV, Bareilly
Carriage of following materials from E.S.CS store C.B Ganj to work site including loading & unloading
New S.T. Pole 11 Meter long.
11 KV XLPE cable jointing kit O/D (3x185 sqmm.)
11 KV XLPE Cable (3x185 sqmm.)
LT XLPE Cable (1x400 sqmm)
AB Cable (3x120 sqmm.)
New 250 KVA T/F
3-Phase Distribution Box
PCC Pole (8.5 mtr long)
Stay set
other associated materials
Erection of S.T. D / Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Concreting of ST Poles.
Earthing of Poles .
Erection of PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Construction of plinth complete (2.0x2.0x1.5) meter, by providing first class Bricks work as per RESPO norms. (Material will be supplied by Contractor).
Earthing of distribution T/F for body & neutral upto water level with GI Pipe of 1.5” Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
Erection of 250 KVA T/F on plinth by laying of cable ,Jumpering & commissioning of T/F .
The work of fabrication /construction and grouting of wire mesh fencing of 16 meter running length/as per site requirement in rectangular shape height 2 meter with angle size of 45x45x05 m.m including gate at one side as per RESPO norms. (Material will be supplied by Contractor).
Erection of 11 KV XLPE cable jointing kit O/D (3x185 sqmm.)
Stringing and sagging AB Cable (3x120 sqmm.)
Laying of 11 KV XLPE Cable by HDD Method complete in all respect Along with road restoration(HDD Pipe Shall be provided by contractor )
Hoisting of 80 mtr. 11 KV XLPE Cable on D/Poles situated at both side of road including cost of G.I Pipe (8 meter).
Laying of LT XLPE Cable 1x400 sqmm.
Providing and Fixing Al. lugs (for 400 sqmm.) Cable
Providing and Fixing Copper L-Peace.
Providing and Fixing LT Tail-Less Unit.(500 Amp.).
Erection and fixing 3-phase Distribution Box and making all Connections
Erection of Stay set complete.
Fixing of associated Items i.e. Dropper Channel-01 No., Pin Insulator- 03 No., Top Channel- 01 No., 11 KV TPMO- 01 No., 11 KV Fuse Set- 01 No. Etc.
For the work of Construction of For the work of Construction of New LT 400 KVA T/F at Barrier No. 2 under EUSD-VII Bareilly for strengthening of Electrification System Under EUDD-IV, Bareilly
Carriage of following materials from E.S.CS store C.B Ganj to work site including loading & unloading
New S.T. Pole 11 Meter long.
ACSR Weasel Conductor
LT XLPE Cable (1x630 sqmm)
AB Cable (3x120 sqmm.)
New 400 KVA T/F
3-Phase Distribution Box
PCC Pole (8.5 mtr long)
Stay set
other associated materials
Erection of S.T. D / Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Concreting of ST Poles.
Earthing of Poles .
Erection of PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Construction of plinth complete (2.0x2.0x1.5) meter, by providing first class Bricks work as per RESPO norms. (Material will be supplied by Contractor).
Earthing of distribution T/F for body & neutral upto water level with GI Pipe of 1.5” Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
Erection of 400 KVA T/F on plinth by laying of cable ,Jumpering & commissioning of T/F .
The work of fabrication /construction and grouting of wire mesh fencing of 16 meter running length/as per site requirement in rectangular shape height 2 meter with angle size of 45x45x05 m.m including gate at one side as per RESPO norms. (Material will be supplied by Contractor).
Stringing and sagging AB Cable (3x120 sqmm.)
Laying of LT XLPE Cable 1x630 sqmm.
Providing and Fixing Al. lugs (for 400 sqmm.)
Providing and Fixing Copper L-Peace .
Providing and Fixing Tail Less Unit(500 Amp.) .
Sagging of Weasel Conductor
Erection and fixing 3-phase Distribution Box and making all Connections
Erection of Stay set complete.
Fixing of associated Items i.e. Dropper Channel-01 No., Pin Insulator- 03 No., Disc Insulator- 03 No., Top Channel- 01 No., 11 KV TPMO- 01 No., 11 KV Fuse Set- 01 No. Etc.
DURGESH CHANDEL
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .