Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 LAccepted-AOC VILL BHATERH PO SAINTHAL TEHSIL JOGINDERNAGAR DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | ₹2.0 L | L-1 | Accepted-AOC L - 1 |
| 2 | L-2₹2.1 LRejected-Finance C O NIDHI MEDICAL STORE LAKKAR BAZAR SHIMLA 01 | SHIMLA | HIMACHAL PRADESH | 171001 | ₹2.1 L | L-2 | Rejected-Finance 3rd |
| 3 | L-3₹2.1 LRejected-Finance | ₹2.1 L | L-3 | Rejected-Finance 2nd |
Tender Value
₹2.0 L
EMD Value
₹2,020
Closing Date
27 Jan 2026, 11:30 amClosed
Er. Puran Chand
Sr. Executive Engineer, Electrical Division, HPSEBL, Joginder Nagar
Tender for restoration of 11 KV HT Line at Machkehar Ohi Chauntra and Ranakhad and LT Line at various locations in the month of July Aug and sept 2025 damaged due to fallen of trees on composite line in E Section Local and Ladruhin under ESD Chauntra
2026_HPSEB_126401_1
JED-120/2025-26
Open Tender
Electrical Works
60 days
Joginder Nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹2,020
Yes
4 Feb 2026
21 Jan 2026
27 Jan 2026
21 Jan 2026
27 Jan 2026
21 Jan 2026
(Erection/Labour Part) of LT Line damaged due to rain damages:- Erection of Steel Tubular Pole 8/9 Mtrs.Long New/(Tilted/uprooted) Digging of pit, Drilling of Holes in Poles, Fixing of Clamp, etc, Erection of Pole, Filling of pit ramming and painting of pole. Complete in all respect as directed by the Engineer-In-Charge including all types of risk & incedental at site
Erection of Stay Set (L.T) new/uprooted:- Digging of pit , Fixing of Stay Rod, Filling of pit and Nozzling and tighting Complete in all respect as directed by the Engineer-In-Charge including all types of risk & incedental at site
Sagging of Conductor (ACSR/AAAC 50/55 for L.T.Line) :- Laying of Conductor , Stringing and Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc.
Sagging of G.I.Wire (8 SWG):- Re-Stringing and re-Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc.
"Materials Part"- Prov.L.T.Stay Set Complete in all respects
(Erection/Labour Part) of HT Line damaged due to rain damages:- Erection of 11 KV HT Line with ACSR/AAAC 50/55 mm2 Re-Stringing and re-Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc.
Sagging of G.I.Wire (8 SWG):- Re-Stringing and re-Saggingg and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc.
"Materials Part"- Prov. CI X-arm 2800x100x50x6 mm at tapping points
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
VolI.pdf
Tender Documents • 0.95 MB
VolII.pdf
Tender Documents • 0.51 MB
BOQ_186348.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid