Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹19.0 L (17.6%)Rejected-Finance | ₹1.3 Cr+₹19.0 L (17.6%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.6 Cr+₹54.9 L (50.9%)Rejected-Finance | ₹1.6 Cr+₹54.9 L (50.9%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical NEWADA PATHARA PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | - | - | Rejected-Technical As per technical bid evaluation |
| 5 | Rejected-Technical LIG 154 BUDH VIHAR PART C BYPASS ROAD TARAMANDAL GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | - | - | Rejected-Technical As per technical bid evaluation |
| Sl No | Description | Qty | Unit | M/S K.K. TRADERS L1 | M/S ALLIANCE CONSTRUCTIONS L2 | M/S SANTOSH KUMAR SRIVASTAVA CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation by Hydraulic excavator capacity 60cum/hour including 1.5m lift and 30m lead, cost of driver/Assitant driver, POL, maintanence of Machine and contaractor profit all labour, T & P and all taxes but excluding of GST leveling, dressing and compaction etc. as per direction of Engineer in Charge. | 50,304 | M3 | 24.99 ₹12,57,096.96 Lowest | 36.25 ₹18,23,520 | 76 ₹38,23,104 |
| 2.00 | Supplying and Laying R.C.C. Porrcupine including of all cost of materials, labour, taxes T & P etc. complete. | 1,284 | Nos. | 7,419.99 ₹95,27,267.16 Lowest | 8,460.75 ₹1,08,63,603 | 9,700 ₹1,24,54,800 |
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
7 May 2026, 11:00 amClosed
SUPERINTENDING ENGINEER, DRAINAGE CIRCLE, BALLIA
SUPERINTENDING ENGINEER, DRAINAGE CIRCLE, BALLIA
Protection of village Baramadpur, Parsia and Sabhadia Sultanpur at Right bank of River Saryu in District Azamgarh.
2026_UPIDC_1144364_4
03/S.E./2026-27
Open Tender
Civil Works
Item Wise
20 days
Azamgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,154
₹3.5 L
SUPERINTENDING ENGINEER, DRAINAGE CIRCLE, BALLIA
17 Jun 2026
2 May 2026
7 May 2026
2 May 2026
7 May 2026
2 May 2026
2 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation by Hydraulic excavator capacity 60cum/hour including 1.5m lift and 30m lead, cost of driver/Assitant driver, POL, maintanence of Machine and contaractor profit all labour, T & P and all taxes but excluding of GST leveling, dressing and compaction etc. as per direction of Engineer in Charge. | 50,304 | M3 | - | - |
| 2 | Supplying and Laying R.C.C. Porrcupine including of all cost of materials, labour, taxes T & P etc. complete. | 1,284 | Nos. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.77 MB
New_BID_4.pdf
Tender Documents • 0.95 MB
BOQ_2138121.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .