Executive Engineer
Repair and Maintenanace of Karjan vasahat Colony including repair and Restoration workof Compound Wall of Karjan Colony Ta. Nandod , Dis. Narmada
337016
17 of 202627
Open
Civil - All
Works
Narmada
8 documents required · 7 mandatory · 1 optional
₹1,500
EXECUTIVE ENGINEER IRRIGATION PROJECT DIVISION NO.4, RAJPIPLA
₹45,000
22 Aug 2026
22 Aug 2026
22 Aug 2026
5 Sept 2026
22 Aug 2026
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices as
the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied in
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered
in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant sections
of the contract documentation shall be made before entering rates or prices against
each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause-29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor
of at least 150 kw with a single rear mounted heavy duty ripper.
BILLOF QUANTITIES
(A) PercentageRateTender(UptoINR50Cr.)
Item DescriptionofItem(withbrief specification Quantity Unit RateIn Amount
No and reference to book of specifications) figures
Jungle cutting for preliminary surveys (a) Light
1 jungle cutting (bushes, hedges ) 8000.00 Sqmt 13.44
Excavation for foundation for depth from 1.5 m
to 3.0 m including sorting out and stacking of
2 useful materials and disposing off the excavated 302.00 cum 295.10
stuff upto 50 Meter lead.(B) Dense or Hard soil
Providing and laying cement concrete 1:3:6 (1-
Cement : 3- coarse sand : 6- hand broken stone
3 aggregates 40 mmnominal size) and curing 36.00 cum 3063.66
complete excluding cost of formwork in (A)
Foundation and Plinth
Providing and laying controlled cement concrete
M.250 and curing complete including the cost
of formwork and excluding cost of reinforcement
4 for reinforced concrete work in (A) Foundations,
footings, Base ofcolumns andMass concrete.
Providing and laying controlled cement concrete
M.250 and curing complete including the cost
of formwork and excluding cost of reinforcement 19.00 cum 7864.87
5 for reinforced concrete work in (D) Columns,
Pillars posts and struts For Ground Floor.
Providing and laying controlled cement concrete
M.250 and curing complete including the cost
of formwork and excluding cost of reinforcement
6 for reinforced concrete work in (C) 27.00 cum 6789.22
Slabs,landing,shelves,Balconies, Lintels, Beams,
Girders and CantileverFor Ground Floor
Backfilling the foundation trenches around the
structures etc with selected excavated stuff
7 including watering, ramming,compacting etc. 172.00 cum 36.90
complete. (By Machinery)
Providing and laying cement concrete 1:3:6 (1-
Cement : 3- Coarse sand : 6- crushed stone
aggregates 20 mm nominal size) and curing
8 complete including cost of formwork in (A) Wall 10.00 cum 3925.48
Caps / Coping (upto 10 ton) For Ground Floor Lvl
Brick work using common burnt clay building
bricks having crushing strength not less than
kg./Sq.Cm. in foundation and plinth in Cement
Mortar 1:6 (1- Cement : 6 -fine sand)(B)
9 Conventional (upto 10 ton) For Ground Floor cum 4568.40
Extra for brick work in superstructure above
plinth level upto floor two level (B) Conventional
Providing 15mm thick cement plaster in single
coat on Rough (Similar)side of single or half brick
walls for interior plastering upto floor two level
10 and finished even and smooth in (i) Cement 56.00 Sqmt 201.79
mortar 1:3 (1-cement:3-sand)
20mm thick sand faced cement plaster on walls
upto height 10 metres above ground level
consisting of 12mm thick backing coat of C.M.
11 1:3 (1-cement : 3-sand) and 8mm thick finishing 1624.00 Sqmt 353.98
coat of C.M. 1:1 (1-cement : 1-sand) etc.
Applying two coats of putty & two coats of
primer of approved brand and manufacture on
new wall surface to give an even shade including
12 thoroughly brushing the surface free from Sqmt
mortar dropping and other foreign matter and
sand papered smooth.
Providing and laying marble stone slab
flooring over 20mm (average)base of cement
mortar 1:6 (1-cement : 6 coarse sand) or
L.M. 1:1.5(1- lime putty : 1.5 - coarse sand)
laid and jointed with gray cement slurry
including rubbing and polishing complete. (A)
Marble slab 25mm thick
Providing and fixing 35 mm thick panelled
,glazed or panelled and glazed shutters, for
Doors windows and clearstory windows
14 including anodisedalluminiumBut hinges with 3.00 Sqmt 3627.68
necessary screws and indian teak wood shutters
with. (C) Hard board panels.
Providing and fixing window having extruded
aluminum Colour anodized section frame main
outer size 95mm x 24mm x 1.17mm (of Jindal
Section no:2459 @ wt.of 0.738 Kg/mt),
horizontal Three track member size 92mm x
31.75mm x 1.30mm (of Jindal Section no:8688,@
Wt.1.07 Kg/mt), vertical member of size 92mm x
31.75mm x 1.50mm (of Jindal Section no:8933,@
Wt. 1.06 Kg/mt) with sliding shutters of
horizontal member size 40 mmx18mm x1.29mm
(of Jindal Section no:8947@ wt.of 0.456 Kg/mt),
vertical member of size 40mm x 18mm x
mm (of Jindal Section no:8949 @ wt.of
0.456Kg/mt/ with 5 mm thick transparent
bronze colour tinted float glass with powder
coated aluminum fittings and fixtures and
transparent silicon sealant glass fixing to frame
as per details etc
Providing and fixing M.S. grills of required
pattern to wooden/grenite frames of windows
etc. with M.S. flats at required spacings and
16 frame alround, square or round bars with round 3.00 Sqmt 110.31
headed bolts and nuts or by screws (A) Plain
Grill. (upto 10 ton)
Painting two coats (excluding priming coat) on
new steel and other metal surface with enamel
paint, brushing, interior to give an even shade
17 including cleaning the surface an even shade 41.00 Sqmt 94.39
including cleanicn the surface of all dirt, dust and
other foreign matter.
P & L 24" x 24" vitrified 8 mm thick tile flooring
over 20 mm (average) base of cement mortar
1:6 ( 1 cement: 6 coarse sand) on new surface or
fixing on existing flooring by adhesive material
18 including dismentaling of existing flooring and 14.00 Sqmt 1521.95
jointed with color cement slurry including finised
with flush pointing & cleaning the surface etc.
complete for light shade
Providing and laying broken chine mosaic
flooring over avg 40 mm C.C 1:2:4 bedding for
maintaning slope for plain and curve surface &
12 mm to 20 mm broken pieces of glazed tiles
to be laid over cement mortar 1:3 to plain or
19 slope and to be tempered to bring mortar
creme out upto surface using white cement
including rounding off junctions and extending
them upto 15 cm along the wall,clearing with
water and oxalic acid etc. as directed.
Providing and fixing pre-cast Rubber Dye / steel
Dye inter locking concrete block 60mm thick
with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as per
approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling and
filling the joint with sand in proper line and level
as per guidlines of IRC : SP 63-2018 etc.
Providing TMT Bar FE 500D reinforcement
for R.C.C. work including bending, binding
and placing in position complete for Ground
Removing dry or oil bound distemper/enamel
by washing and scraping and sand papering
22 the wall surface smooth including necessary 8123.00 Sqmt 11.82
repairs the scratches complete
Finishing wall with weather proof exterior
emulsion paint on wall surface (two coats) to
give an required shape even shade after
23 thoroughly brushing the surface to remove 9315.00 Sqmt 122.14
all dirt, and remains of loose powdered
materials.etc complete
Providing and fixing in position (
differentdiameter )I.S.,NP-3 class reinforced
pipe with caulking the joints with cement
mortar 1:1 proportion,using jute string
24 soaked in cement slurry,finishing joints and 2.5 rmt 5955.30
laying pipes to the designed grade and
levels, curing etc.complete for all leads and
lifts. S 8 (g) NP-3 class 1200 mm dia pipe.
Electric charge 1% Lumpsum
I/We/am/are willing to carryout the work at… .................. %above/below percent (Should
Be written in figures and words)of the estimated rate mentioned above. Amount of my/our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(A) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book In In
of specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)………………………………
(C)Net Tendered Amount (A-B) (in figure)………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt. as stated in S.O.R .therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor. Deputy Executive Engineer Executive Engineer
Irrigation Pro. Sub Division No.27 Irrigation Project Division No.4
Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD compound wall.pdf
technical specification.pdf
boq.pdf
NIT compound wall 2 .pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].