Tender Value
₹11.6 L
EMD Value
₹23,260
Closing Date
5 Oct 2026, 4:00 pm
Executive Engineer RandB Division Baramulla
Executive Engineer RandB Division Baramulla
construction and upgradation of shirpora junction to sultanpora Beighpati
2026_PWDJK_325416_1
114/7482-91/2026-27/RnB/Bla Dated 21.09.2026
Open Tender
Civil Works
Percentage
90 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer RandB Division Baramulla
₹23,260
21 Sept 2026
21 Sept 2026
6 Oct 2026
21 Sept 2026
5 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge.
All kinds of soil : | 337.5 | Cum | 187.3 | ₹63,213.75 |
| 2 | Earth work in excavation in all kinds of soil by Manual/mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by site Engineer incld.cutting of trees, removal of tree stumps and dewatering of trenches during execution of work.. | 101.7 | Cum | 256.85 | ₹26,121.65 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 43.74 | Cum | 7,677.35 | ₹3,35,807.29 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth:
With bond stone | 29.16 | Cum | 5,536.55 | ₹1,61,445.8 |
| 5 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 27 | Sqm | 416.5 | ₹11,245.5 |
| 6 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand)
Flush/Ruled Pointing | 36 | Sqm | 297 | ₹10,692 |
| 7 | Supply & Filling of RBM/ GSB for back filling behind Crates/ R Walls including ramming, dressing, consolidation etc | 74.25 | Cum | 850 | ₹63,112.5 |
| 8 | Supply and filling of Khak bajri including spreading, watering, ramming, compacting with PRR of 8 to 10 Tonne capacity including carriage of the same from approved source upto site of work complete ( for Berm | 59.13 | Cum | 850 | ₹50,260.5 |
| 9 | Providing & laying of RCC spun pipes in position including earth work in excavation laying of pipes in position, testing jointing & re-filling of excavated materials, providing sufficient cushions over pipes including loading, unloading, & all carriages upto site of work complete. 18'' dia | 14.63 | RM | 2,500 | ₹36,575 |
| 10 | Supply & filling of 2nd class stones into wire crates with wire of 4mm dia anealed wire including hand packing tightly with tipping and tightening of crates with cost of crates. All inclusive with cost, labour & carriage of all involved materials complete job (Including cost of crates). | 79.75 | Cum | 3,750 | ₹2,99,062.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_1099647.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .