Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹5.6 LAWARDED | AWARDED |
Tender Value
₹9 L
EMD Value
₹22,500
Closing Date
19 Nov 2025, 10:00 pmClosed
Directorate of Municipal Administration
Contruction Of Rcc Drain And Drain Over The Slab From Shabeer House To Auto Mounesh House At Ward No.01 And Arjun pattar House To Basavaraj Gundagarti House At Wrad No.02 And Khota Road To Durugamma House At Ward No.03 And Govindappa Bajantri House To Basava Bajantri House At Ward No.10 In Hutti TP Limits
DMA/2025-26/OW/WORK_INDENT51084
DMA/2025-26/OW/WORK_INDENT51084
Open
Other Works
Electronic Documents, First(One Cover)
DMA Town Panchayat Hutti
₹500
₹22,500
4 Nov 2025
4 Nov 2025
19 Nov 2025
Contruction Of Rcc Drain And Drain Over The Slab From Shabeer House To Auto Mounesh House At Ward No.01 And Arjun pattar House To Basavaraj Gundagarti House At Wrad No.02 And Khota Road To Durugamma House At Ward No.03 And Govindappa Bajantri House To Basava Bajantri House At Ward No.10 In Hutti TP Limits
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate for drain formworks considered 5%.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .