| 1.00Road Maintanance | |||||
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65) | 89.92 | sqm | 373 ₹33,540.16 | 376.91 ₹33,891.75 |
| 1.00 | 5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,038 | sqm | 16 ₹16,608 | 13.36 ₹13,867.68 |
| 1.00 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65) | 1,038 | sqm | 278 ₹2.9 L | 270.59 ₹2.8 L |
Tender Value
₹3.4 L
EMD Value
₹8,470
Closing Date
20 Feb 2026, 6:00 pmClosed
ASSISTANT ENGINEER
Office of Assistant Engineer LSGD Section Pullur Periya GP
PROJECT NO-05/25-26-IMPROVEMENT OF POLLAKKADA PAANAMTHODU ROAD IN PULLUR PERIYA GP
2025_LSGD_814351_26
AE/LIDEW/PP/04/25-26
Open Tender
Civil Works - Roads
180 days
PULLUR PERIYA
Please refer tender documents
7 documents required · 7 mandatory
₹750
Yes
₹8,470
Yes
30 May 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Road Maintanance
5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65)
5.2.1a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1406793.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_1406793.xls
BOQ • 0.23 MB
viewsbd.pdf
Tender Documents • 1.69 MB
viewnit.pdf
Other Document • 0.03 MB
Download all tender documents and submit your bid