Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC GENERAL ENGINEERING WORKS THURAVOOR P O ALAPPUZHA 688 532 | ALAPPUZHA | ALAPPUZHA | KERALA | 688532 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹12.7 L+₹1.3 L (11.7%)Rejected-Finance SADALAYAM THODIYOOR NORTH P O VEGARA KARUNAGAPPALLY KOLLAM | KARUNAGAPPALLY | KOLLAM | KERALA | L2 | Rejected-Finance L2 Bidder |
Tender Value
₹11.4 L
EMD Value
₹50,000
Closing Date
14 Nov 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Asst. General Manager (Projects.)
Travancore Titanium Products Ltd, P.B.No.1, Kochuveli P.O, Trivandrum- 21
Construction of Co generation Plant Building at Travancore Titanium Products Limited, Thiruvananthapuram
2022_TTPL_518324_1
PROJ/ Construction/CGP Bldg./22-23
Open Tender
Civil Works - Buildings
Item Rate
60 days
Travancore Titanium Products Ltd, Trivandrum- 21
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,950
Yes
₹50,000
Yes
Travancore Titanium Products Ltd, Trivandrum- 21
6 Mar 2024
21 Oct 2022
15 Nov 2022
21 Oct 2022
14 Nov 2022
21 Oct 2022
21 Oct 2022 - 14 Nov 2022
28 Oct 2022
Amount
Laying and Jointing PVC Pipe. Heading
CONSTRUCTION OF TURBINE BUILDING
EARTHWORK EXCAVATION IN ORDINARY SOIL INCLUDING SECTIONING & SOIL BANK WITH INITIAL LEAD AND LIFT UPTO 50 M AND 1.5 M FOR FOUNDATION ( USING MACHINE)
RED EARTH FILLING INSIDE THE PLINTH TO PROPER GRADE AND LEVEL IN LAYERS WITH AVAILABLE EARTH AND COMPACTED AS SPECIFIED INCLUDING WATERING, RAMMING/COMPACTION BY MANUAL/MECHANICAL MEANS, DRESSING ETC ALL COMPLETE FOR THE FOLLOWING
PROVIDING AND LAYING PLAIN CEMENT CONCRETE 1:4:8(1 PARTS OF CEMENT, 4 PARTS OF COARSE SAND, 8 PARTS OF GRADED STONE AGGREGATE 40MM /20MM NOMINAL SIZE) AS LEVELING COURSE IN FLOORINGS AND BELOW COLUMN FOOTINGS AND FOUNDATIONS INCLUDING ALL LABOURS AND COST OF TAMPING, CURING, SHUTTERING, MECHANICAL MIXING AND VIBRATING,COMPACTION FINISHING,CARTAGE ETC., COMPLETE AS DIRECTED BY ENGINEERIN CHARGE
PROVIDING AND LAYING RCC IN M25 AS PER THE DESIGN MIX SUBMITTED AND APPROVED USING ORDINARY PORTLAND CEMENT AND GRADED AGGREGATES(BPG) OF 20MM MAXIMUM SIZE,INCLUDING ALL FORMWORK, MACHINE MIXING, LAYING AND VIBRATING, HAND PACKING, LEVELLING, SATISFACTORY CURING, MAKING AND TESTING CONTROL CONCRETE CUBES, ETC, COMPLETE AT ALL LEVELS AND LOCATIONS AS DIRECTED BY THE ENGINEER IN CHARGE
REINFORCEMENT FOR RCC WORK INCLUDING, STRAIGHTENING, CUTTING, BENDING, CRANKING, WELDING, PLACING IN POSITION AND BINDING WITH MS BINDING WIRE OF 18 SWG IN DOUBLE STARND ALL COMPLETE USING STEEL BARS CONFIRMING TO IS:1786 IN GRADE Fe-415, COMPLETE ALL INCLUDING COST AND CONVEYANCE OF REINFORCEMENT AS DIRECTED BY ENGINEER IN CHARGE
PROVINDING AND LAYING BLOCKWORK IN 200MM THICK CM 1:6(1 PART CEMENT:6 PARTS COARSESAND) USING SOLID BLOCK SIZE 40X20X15CM (STRENGTH OF BRICK SHALL NOT BE LESS THAN 50KG/CM2)INCLUDING RACKING OUT JOINTS 6MM DEEP EVERYWHERE,REQUIRED CURING ETC, INCLUDING RECESSES, OPENINGS, SCAFFOLDINGS, STAGING, CURING, FINISHING THE JOINTS FLUSH BELOW GROUND LEVEL AND ABOVE PLINTH LEVEL, COST OF ALL MATERIALS, LABOURS ETC ALL COMPLETE AS PER SPECIFICATIONS
PLASTERING WITH CEMENT MORTAR 1:4, 12MM THICK ONE COAT TOWalls FINISHED EVEN AND SMOOTH WITHOUT USING EXTRA CEMENT INCLUDING HACKING OF CONCRETE SURFACES CURING ETC AND FIXING CHICKEN MESH AT JOINTSOF CONCRETE AND MASONRY SURFACES COMPLETE ALL AS DIRECTED AT SITE
ROOFING
FABRICATION, ERRECTION AND PAINTING OF STRUCTURAL STEEL WORK FOR ROOF STRUCTURE INCLUDING ERECTING IN POSITION, ALIGNING THE ERECTED STRUCTURES, BOLTING OR WELDING WHEREVER REQUIRED AS PER APPROVED DRAWING, COST AND CONVEYANCE OF ALL MATERIALS, ALL CONSUMABLES, ACCESSORIES INCLUDING WELDING RODS, LABOUR, PAINTING WITH TWO COATS OF CHLORINATED RUBBER PAINTS OVER ONE COAT OF ZINC PHOSPHATE PRIMER ETC.COMPLETE.AFTER CLEANING THE SURFACE BY WIRE BRUSHING/POWER BRUSHING ETC. COMPLETE. (PROVISION OF BOLT HOLES TO BE MADE AS REQUIRED AT NO EXTRA COST).
ROOFING WITH 0.47MM GALVALUME FULLY CORRUGATED SHEETS AND FIXING WITH 6 MM DIA. NON-CORROSIVE SELF THREADED SCREWS WITH PLAIN AND BITUMEN WASHERS WITH 150MM OVERLAP AT ENDS AND TWO FULL CORRUGATIONS ON SIDES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR, ALL LEADS AND LIFTS, OTHER INCIDENTALS ETC. COMPLETE.(RIDGE,CORNER FLASHING ETC INCLUSIVE)
SUPPLY AND FIXING OF M20 HILTI BOLT (100MM MIN INSERTION) FOR FIXING THE STRUCTURAL STEEL TO EXISTING BUILDING
G S CONSTRUCTIONS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .