Tender ID
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
1 Apr 2026, 6:00 pmClosed
Executive Engineer, N.P. Main Canal Division No. 19, Harij
Strengthening work of Rajpura Branch Canal (Ch.0.0 to 8.700 km), Katara Distry & its minors, Ravindra DO & Khakhdi DO of Rajpura Branch Canal for the Year 2025-26
285577
11 of 2025-26
Open
Civil Works - Canal
Works
Patan
9 documents required · 8 mandatory · 1 optional
₹4,248
Yes
Executive Engineer, N.P.Main Canal Division No. 19, Harij
₹1.4 L
Yes
12 Mar 2026
12 Mar 2026
12 Mar 2026
1 Apr 2026
12 Mar 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given
to provide a common basis for bidding. The basis of payment will be theactual quantities
of work ordered and carried out, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities,
where applicable, and otherwise at such rates and prices as the Engineer may fix within
the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in sofar as
it is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered
in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the cost
shall be deemed to be distributed among the rates and prices entered for the related
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification
for Road and Bridge works. For building works specifications for building are to be
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling
for its removal, and which cannot be extracted by ripping with a tractor of at least
kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of work:- Strengthening work of Rajpura Branch Canal (Ch.0.0 to
8.700 km), Katara Distry & its minors, Ravindra DO & Khakhdi DO of
Rajpura Branch Canal for the Year 2025-26
Item Total Amount in
Description of Item Unit Rate in Rs.
Excavation in all sorts of soil 7 cum. 79.00
(including wet and slushy condition
of soil) with yellow, sandy, gravelly
soil including soft murrum & H.M.
including sorting & stacking and
Item depositing the excavated stuff in
No.1 uniform layers as and where directed
upto lead of 30 m and lift as shown
below including clearing the site etc.
compute (including dewatering)(B)
For foundation trenches of C.D. work
(a) 0 to 3 Mt. depth
Clearing silt from canal/drain bed by 1175.00 cum 236.70
digging the same to the requred bed
level and gradiant incl.depositing the
excavated earth regulary in spoil
Item bank for utilising the same for
No :2 preparing the bund after breaking
clods as and where directed for lead
up to 200 m & lift up to 3 m as under
)excluding weed cutting (c) for canal
above 500 cusecs.
Dismantling the C.C. lining including 10237.800 Sqmt. 82.00
Item disposing off the dismentalled
No :3 materials as directed etc. complete.
For 7.0 cm Thickness
Providing and laying 7.5 cms thick 3360.00 Sqmt. 379.00
cast in situ cement concrete 1:2:4
grade with the use of crushed
aggregates for canal lining works
including use of all equipments,
Item scaffolding, centering form work etc,
No :4 with finishing as required to the
exposed surface,making asphalt
joints as directed and watering and
curing ( without sleepers ) with all
lead and lifts etc. comp.(Including
Preparing Sub grade for lining)
Providing and laying 7.0 cms thick 21729.00 Sqmt. 365.00
Item cast in situ cement concrete 1:2:4
No.5 grade with the use of crushed
aggregates for canal lining works
including use of all equipments,
scaffolding, centering form work etc,
with finishing as required to the
exposed surface,making asphalt
joints as directed and watering and
curing ( without sleepers ) with all
lead and lifts etc. comp.(Including
Preparing Sub grade for lining)
Proving & fixing MS welded mesh jali 11492.00 Sqmt. 142.00
of 2.8 mm dia 65mm x 65mm
including cutting in required sizes,
fixing in canal prism etc. complited
by Engineer in charge.
Providing and Laying HDPE Liner of 11492.00 Sqmt. 185
750 micron in bed and slopes of
canal at required level below lining
as per drawing and as directed etc.
Providing and laying CC 1:2:4 grade 62.00 Cum. 4873.40
using cement, sand and crushed
metal incuding providing and
Item erecting necessary form work,
No.8 centering,vibrating, smooth
finishing,watering and curing as
directed with all leads and lifts etc
complete. (a) Sub structures
Total cost of work only Rs.
I/We am/are willing to carry out the work at… ........................ % above/belows percent
be written in figures and words) of the estimated rate mentioned above. Amount of
my /ourtender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item (with Quantity Unit Rate Amount
No brief specificationand
reference to book of
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as perGovt.
G.R.: CE(QC)/PB/Mix Design/04/2024 Date:20/01/2024 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original itemat
the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Approved Bank list.pdf
Approved Cement.pdf
Approved Steel.pdf
BOQ RBC CH.0.0 TO 8.700 KM KATARA DISTRY.pdf
Final SBD RBC CH.0.0 TO 8.700 KM KATRA DISTRY.pdf
ITEM SPECIFICATION RBC CH.0.00 TO 8.700 KM and KATRA DISTRY.pdf
NIT RBC_Katra.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .