| 1 | H1₹17.2 LAdmitted-Finance | ₹17.2 L | H1 | Admitted-Finance |
| 2 | H2₹4.4 LAdmitted-Finance | ₹4.4 L | H2 | Admitted-Finance |
| 3 | H3₹4.1 LAdmitted-Finance | ₹4.1 L | H3 | Admitted-Finance |
| 4 | H4₹3.5 LAdmitted-Finance | ₹3.5 L | H4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAGHAV SARIN H2 | Patiaya Enterprises H3 | M/S SINGH ELECTRICALS H4 | RATHER ELECTRICALS AND CONTRACTOR H1 |
|---|---|---|---|---|---|---|---|
| 1.00Poles: Unloading of Steel Tubular/ Cement Poles by Manual/ Mechanical means, verification and stacking of same. | |||||||
| 1.01 | ST Poles 8 Mtr | 1 | Nos | 64 ₹64 | 65 ₹65 | 64.5 ₹64.50 | 250 ₹250 |
| 1.02 | ST Poles 9 Mtr | 1 | Nos | 67 ₹67 | 69 ₹69 | 68.5 ₹68.50 | 250 ₹250 |
| 1.03 | ST Poles 11 Mtr | 1 | Nos | 77 ₹77 | 79 ₹79 | 79 ₹79 | 370 ₹370 |
| 1.04 | ST Poles 13 Mtr | 1 | Nos | 87 ₹87 | 89 ₹89 | 89 ₹89 | 500 ₹500 |
| 1.05 | PCC Poles 8 Mtr | 1 | Nos | 73 ₹73 | 75 ₹75 | 75.5 ₹75.50 | 300 ₹300 |
| 1.06 | PCC Poles 9 Mtr | 1 | Nos | 85 ₹85 | 89 ₹89 | 88.5 ₹88.50 | 500 ₹500 |
| 1.07 | PCC Poles 11Mtr | 1 | Nos | 95 ₹95 | 99 ₹99 | 98.5 ₹98.50 | 500 ₹500 |
| 2.00Poles: Carriage of Steel Tubular/ Cement Poles by Manual/ Mechanical means, from sacking site and loading of same on trucks | |||||||
| 2.01 | ST Poles 8 Mtr | 1 | Nos | 62 ₹62 | 63 ₹63 | 62.5 ₹62.50 | 290 ₹290 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
28 Mar 2026, 2:00 pmClosed
Executive Engineer ECSD JPDCL Jammu
Office of Executive Engineer ECSD JPDCL Jammu
Labour Rate Contract for the financial year 2026-27 for material handling job and allied works
2026_PDD_304924_1
ECSD/JPDCL/JMU/02 OF 2025-26 DATED 02.03.2026
Open Tender
Miscellaneous Services
320 days
ECSD JPDCL Jammu
Please refer tender documents
6 documents required · 6 mandatory
₹1,000
Yes
Accounts Officer ECSD JPDCL Jammu
₹25,000
Yes
11 May 2026
2 Mar 2026
30 Mar 2026
2 Mar 2026
28 Mar 2026
2 Mar 2026
Poles: Unloading of Steel Tubular/ Cement Poles by Manual/ Mechanical means, verification and stacking of same.
ST Poles 8 Mtr
ST Poles 9 Mtr
ST Poles 11 Mtr
ST Poles 13 Mtr
PCC Poles 8 Mtr
PCC Poles 9 Mtr
PCC Poles 11Mtr
Poles: Carriage of Steel Tubular/ Cement Poles by Manual/ Mechanical means, from sacking site and loading of same on trucks
ST Poles 8 Mtr
ST Poles 9 Mtr
ST Poles 11 Mtr
ST Poles 13 Mtr
PCC Poles 8 Mtr
PCC Poles 9 Mtr
PCC Poles 11Mtr
Poles: Physical Verification, Carriage and Stacking Back Steel Tubular/Cement Poles
ST Poles 8 Mtr
ST Poles 9 Mtr
ST Poles 11 Mtr
ST Poles 13 Mtr
PCC Poles 8 Mtr
PCC Poles 9 Mtr
PCC Poles 11Mtr
Condcutor: Unloading of ACSR Conductor Drums by Mannual/Mechanical means, verification and storage of same
ACSR 0.02 Cond (Panther) Avg 1.3 Km/Drum
ACSR 0.02 Cond (Squirrel) Avg 11 Km/Drum
ACSR 0.03 Cond (Weasel) Avg 8.0Km/Drum
ACSR 0.01 Cond (Dog) Avg 2.5 Km/Drum
ACSR 0.5 Cond (Rabbit) Avg 5.0 Km/Drum
ACSR 0.15 Cond (Wolf) Avg 1.5 Km/Drum
ACSR Zebra Conductor Avg 1.0 Km/Drum
Condcutor: Carriage of ACSR Conductor Drums from storage site to loading site and loading of same into truck
ACSR 0.02 Cond (Panther) Avg 1.3 Km/Drum
ACSR 0.02 Cond (Squirrel) Avg 11 Km/Drum
ACSR 0.03 Cond (Weasel) Avg 8.0Km/Drum
ACSR 0.01 Cond (Dog) Avg 2.5 Km/Drum
ACSR 0.5 Cond (Rabbit) Avg 5.0 Km/Drum
ACSR 0.15 Cond (Wolf) Avg 1.5 Km/Drum
ACSR Zebra Conductor Avg 1.0 Km/Drum
Condcutor: Physical verification, carriage & stacking back ACSR Conductor
ACSR 0.02 Cond (Panther) Avg 1.3 Km/Drum
ACSR 0.02 Cond (Squirrel) Avg 11 Km/Drum
ACSR 0.03 Cond (Weasel) Avg 8.0Km/Drum
ACSR 0.01 Cond (Dog) Avg 2.5 Km/Drum
ACSR 0.5 Cond (Rabbit) Avg 5.0 Km/Drum
ACSR 0.15 Cond (Wolf) Avg 1.5 Km/Drum
ACSR Zebra Conductor Avg 1.0 Km/Drum
Transformers: Unloading of Transformers by Mannual/ Mechanical means, verification and carriage to storage site including storage of same
10 MVA/33/11KV Power Transformers
6.3 MVA/33/11KV Power Transformers
10 MVA/66/11 KV Power Transformers
3.15 MVA/33 KV Power Transformers
630 KVA Distribution Transformers
400 KVA Distribution Transformers
250 KVA Distribution Transformers
200 KVA Distribution Transformers
100 KVA Distribution Transformers
63 KVA Distribution Transformers
25 KVA Distribution Transformers
Transformers: Carriage of Transformers from storage sie to loading site and laoding of same into truck.
10 MVA/33/11KV Power Transformers
6.3 MVA/33/11KV Power Transformers
10 MVA/66/11 KV Power Transformers
3.15 MVA/33 KV Power Transformers
630 KVA Distribution Transformers
400 KVA Distribution Transformers
250 KVA Distribution Transformers
200 KVA Distribution Transformers
100 KVA Distribution Transformers
63 KVA Distribution Transformers
25 KVA Distribution Transformers
Transformers: Physical verification, carriage and stacking back transformers.
10 MVA/33/11KV Power Transformers
6.3 MVA/33/11KV Power Transformers
10 MVA/66/11 KV Power Transformers
3.15 MVA/33 KV Power Transformers
630 KVA Distribution Transformers
400 KVA Distribution Transformers
250 KVA Distribution Transformers
200 KVA Distribution Transformers
100 KVA Distribution Transformers
63 KVA Distribution Transformers
25 KVA Distribution Transformers
Unloading of PVC / XLPE/LT/HT Aluminium Cable Drums by mannual/mechanical means, verification and carriage to storage site including storage of the same.
95 sqmm 1 core PVC Cable
120 sqmm 1 core PVC Cable
185 sqmm 1 core PVC Cable
240 sqmm 1 core PVC Cable
300 sqmm 1 core PVC Cable
400 sqmm 1 core PVC Cable
630 sqmm 1 core PVC Cable
400 sqmm XLPE Cable 11 KV Grade 3 Core
300 sqmm XLPE Cable 11 KV Grade 3 Core
240 sqmm XLPE Cable 11 KV Grade 3 Core
185 sqmm XLPE Cable 11 KV Grade 3 Core
120 sqmm XLPE Cable 11 KV Grade 3 Core
11 KV Single Core XLPE 630 mmsq
33 KV Single Core XLPE 630 mmsq
185 mmsq 3.5 core PVC Cable
300 mmsq 3.5 core PVC Cable
ABC 120 mmsq 5 Core PVC Cable
LT ABC 3Cx120 mmsq
LT ABC 3Cx50 mmsq
LT ABC 3Cx35 mmsq
LT ABC 3Cx25 mmsq
HT Cable 3Cx185 mmsq
HT Cable 3Cx120 mmsq
HT Cable 3Cx50 mmsq
Carraige of PVC / XLPE/LT/HT Aluminium Cable Drums from storage site to loading site and loading of same into truck
95 sqmm 1 core PVC Cable
120 sqmm 1 core PVC Cable
185 sqmm 1 core PVC Cable
240 sqmm 1 core PVC Cable
300 sqmm 1 core PVC Cable
400 sqmm 1 core PVC Cable
630 sqmm 1 core PVC Cable
400 sqmm XLPE Cable 11 KV Grade 3 Core
300 sqmm XLPE Cable 11 KV Grade 3 Core
240 sqmm XLPE Cable 11 KV Grade 3 Core
185 sqmm XLPE Cable 11 KV Grade 3 Core
120 sqmm XLPE Cable 11 KV Grade 3 Core
11 KV Single Core XLPE 630 mmsq
33 KV Single Core XLPE 630 mmsq
185 mmsq 3.5 core PVC Cable
300 mmsq 3.5 core PVC Cable
ABC 120 mmsq 5 Core PVC Cable
LT ABC 3Cx120 mmsq
LT ABC 3Cx50 mmsq
LT ABC 3Cx35 mmsq
LT ABC 3Cx25 mmsq
HT Cable 3Cx185 mmsq
HT Cable 3Cx120 mmsq
HT Cable 3Cx50 mmsq
Physical Verification, carriage and stacking backPVC / XLPE/LT/HT Aluminium Cable Drums
95 sqmm 1 core PVC Cable
120 sqmm 1 core PVC Cable
185 sqmm 1 core PVC Cable
240 sqmm 1 core PVC Cable
300 sqmm 1 core PVC Cable
400 sqmm 1 core PVC Cable
630 sqmm 1 core PVC Cable
400 sqmm XLPE Cable 11 KV Grade 3 Core
300 sqmm XLPE Cable 11 KV Grade 3 Core
240 sqmm XLPE Cable 11 KV Grade 3 Core
185 sqmm XLPE Cable 11 KV Grade 3 Core
120 sqmm XLPE Cable 11 KV Grade 3 Core
11 KV Single Core XLPE 630 mmsq
33 KV Single Core XLPE 630 mmsq
185 mmsq 3.5 core PVC Cable
300 mmsq 3.5 core PVC Cable
ABC 120 mmsq 5 Core PVC Cable
LT ABC 3Cx120 mmsq
LT ABC 3Cx50 mmsq
LT ABC 3Cx35 mmsq
LT ABC 3Cx25 mmsq
HT Cable 3Cx185 mmsq
HT Cable 3Cx120 mmsq
HT Cable 3Cx50 mmsq
C&R Panels: Unloading of 11 KV VCB Panels by mannual/ mechanical means, verification and carriage to storage site including storage of same
11 KV VCB Panels Sets (1+3)
11 KV VCB Panels Sets (1+4)
11 KV VCB Panels Sets (1+5)
11 KV VCB Panels Sets (2+5)
11 KV VCB Panels (Incomer)
11 KV VCB Panels (Outgoing)
33 KV C&R Panels
Line Panels
Transformer Panels
C&R Panels: Carriage of 11 KV VCB Panels from storage site to loading site and loading of same into truck.
11 KV VCB Panels Sets (1+3)
11 KV VCB Panels Sets (1+4)
11 KV VCB Panels Sets (1+5)
11 KV VCB Panels Sets (2+5)
11 KV VCB Panels (Incomer)
11 KV VCB Panels (Outgoing)
33 KV C&R Panels
Line Panels
Transformer Panels
C&R Panels: Physical verification, carriage and stacking back 11 KV VCB Panels
11 KV VCB Panels Sets (1+3)
11 KV VCB Panels Sets (1+4)
11 KV VCB Panels Sets (1+5)
11 KV VCB Panels Sets (2+5)
11 KV VCB Panels (Incomer)
11 KV VCB Panels (Outgoing)
33 KV C&R Panels
Line Panels
Transformer Panels
Other Key Materials: Unloading of below key materials by mannual/ mechanical means, verification and carriage to storage site including storage of same.
Transformer Oil Fresh (in barrels of 210 ltrs)
Transformer Oil Old & Used (in barrels of 210 ltrs)
11 KV Hor Gap Fuse Sets
Portable Oil Filtration Plant
33 KV Isolators with E/B
33 KV Isolators without E/B
11 'KV Disc Insulators
33 KV Disc Insulators
11 KV Pin Insulators with Pins
33 KV Pin Insulators with Pins
LT Shackle Insulators
Sundary Materials/Un-Serviceable Material
33 KV VCB
33 KV LA's
33 KV CT''s/PTs
66 KV SF-6 Breaker
66 KV CT's/PTs
66 KV Isolators with E/B
66 KV Isolators without E/B
Battery Charger 36 V
IPC for phases (120.120)
IPC for bare messanger (70-70)
IPC for street lightening wire (16-16)
IPC for phase (50-50)
IPC for messenger (35-35)
IPC for phases (120-50) Pole DB
IPC for bare messenger (70-50) Pole DB
Pole DB Three Phase
DB (LT)100 KVA with MCCB with 2 Ckts
DB (LT) 250 KVA with MCCB with 2 Ckts
DB (LT) 400 KVA with MCCB with 2 Ckts
11 KV 3-Phase Isolaors (800 Amps)
11 KV 3 Phase Gang Operated Switch (600 Amps)
11 KV 3 Phase DO Fuse Set
11 KV LA's Sets
Dead end clamp with mounting arrangement for HT AB Cable
Suspension clamp with mounting arrangement for HT AB Cable
Dead end clamp with mounting arrangement for LT AB Cable 3C x 50 sqmm
Dead end clamp with mounting arrangement for LT AB Cable 3C x 120 sqmm
Suspension clamp with mounting arrangement for LT AB Cable
End Termination (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV ) AB Cable
End Termination (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV ) AB Cable
End Termination (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV ) AB Cable
Straight through joint (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV) AB Cable
Straight through joint (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV) AB Cable
Straight through joint (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV) AB Cable
Mid Span joints for LT AB Cable 3C x 50 Sqmm
Mid Span joints for LT AB Cable 50 Sqmm
Mid Span joints for LT AB Cable 35 Sq mm
Mid Span joints for LT AB Cable 16 Sq mm
Mid Span joints for LT AB Cable 3C x 120 Sqmm
Mid Span joints for LT AB Cable 120 Sqmm
Mid Span joints for LT AB Cable 70 Sq mm
Mid Span joints for LT AB Cable 16 Sq mm
Galvanised stay set with 50 x 8 mm stay clamp, guy insulators (02 Nos) anchor plate (200x200x6mm) nut bolts 2 Nos turn buckles 1.8m long 16mm diameter solid GS stay rod complete
7/3.15 mm dia GI stranded wire
GI Earthing Rods
Other Key Materials: Carriage of material from storage site to loading site and loading of same into truck
Transformer Oil Fresh (in barrels of 210 ltrs)
Transformer Oil Old & Used (in barrels of 210 ltrs)
11 KV Hor Gap Fuse Sets
Portable Oil Filtration Plant
33 KV Isolators with E/B
33 KV Isolators without E/B
11 'KV Disc Insulators
33 KV Disc Insulators
11 KV Pin Insulators with Pins
33 KV Pin Insulators with Pins
LT Shackle Insulators
Sundary Materials/Un-Serviceable Material
33 KV VCB
33 KV LA's
33 KV CT''s/PTs
66 KV SF-6 Breaker
66 KV CT's/PTs
66 KV Isolators with E/B
66 KV Isolators without E/B
Battery Charger 36 V
IPC for phases (120.120)
IPC for bare messanger (70-70)
IPC for street lightening wire (16-16)
IPC for phase (50-50)
IPC for messenger (35-35)
IPC for phases (120-50) Pole DB
IPC for bare messenger (70-50) Pole DB
Three Phase
100 KVA with MCCB with 2 Ckts
250 KVA with MCCB with 2 Ckts
400 KVA with MCCB with 2 Ckts
11 KV 3-Phase Isolaors (800 Amps)
11 KV 3 Phase Gang Operated Switch (600 Amps)
11 KV 3 Phase DO Fuse Set
11 KV LA's Sets
Dead end clamp with mounting arrangement for HT AB Cable
Suspension clamp with mounting arrangement for HT AB Cable
Dead end clamp with mounting arrangement for LT AB Cable 3C x 50 sqmm
Dead end clamp with mounting arrangement for LT AB Cable 3C x 120 sqmm
Suspension clamp with mounting arrangement for LT AB Cable
End Termination (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV ) AB Cable
End Termination (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV ) AB Cable
End Termination (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV ) AB Cable
Straight through joint (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV) AB Cable
Straight through joint (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV) AB Cable
Straight through joint (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV) AB Cable
Mid Span joints for LT AB Cable 3C x 50 Sqmm
Mid Span joints for LT AB Cable 50 Sqmm
Mid Span joints for LT AB Cable 35 Sq mm
Mid Span joints for LT AB Cable 16 Sq mm
Mid Span joints for LT AB Cable 3C x 120 Sqmm
Mid Span joints for LT AB Cable 120 Sqmm
Mid Span joints for LT AB Cable 70 Sq mm
Mid Span joints for LT AB Cable 16 Sq mm
Galvanised stay set with 50 x 8 mm stay clamp, guy insulators (02 Nos) anchor plate (200x200x6mm) nut bolts 2 Nos turn buckles 1.8m long 16mm diameter solid GS stay rod complete
7/3.15 mm dia GI stranded wire
GI Earthing Rods
Other Key Materials: Physical verification carriage and stacking back
Transformer Oil Fresh (in barrels of 210 ltrs)
Transformer Oil Old & Used (in barrels of 210 ltrs)
11 KV Hor Gap Fuse Sets
Portable Oil Filtration Plant
33 KV Isolators with E/B
33 KV Isolators without E/B
11 'KV Disc Insulators
33 KV Disc Insulators
11 KV Pin Insulators with Pins
33 KV Pin Insulators with Pins
LT Shackle Insulators
Sundary Materials /Un-Serviceable Material
33 KV VCB
33 KV LA's
33 KV CT''s/PTs
66 KV SF-6 Breaker
66 KV CT's/PTs
66 KV Isolators with E/B
66 KV Isolators without E/B
Battery Charger 36 V
IPC for phases (120.120)
IPC for bare messanger (70-70)
IPC for street lightening wire (16-16)
IPC for phase (50-50)
IPC for messenger (35-35)
IPC for phases (120-50) Pole DB
IPC for bare messenger (70-50) Pole DB
Three Phase
100 KVA with MCCB with 2 Ckts
250 KVA with MCCB with 2 Ckts
400 KVA with MCCB with 2 Ckts
11 KV 3-Phase Isolaors (800 Amps)
11 KV 3 Phase Gang Operated Switch (600 Amps)
11 KV 3 Phase DO Fuse Set
11 KV LA's Sets
Dead end clamp with mounting arrangement for HT AB Cable
Suspension clamp with mounting arrangement for HT AB Cable
Dead end clamp with mounting arrangement for LT AB Cable 3C x 50 sqmm
Dead end clamp with mounting arrangement for LT AB Cable 3C x 120 sqmm
Suspension clamp with mounting arrangement for LT AB Cable
End Termination (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV ) AB Cable
End Termination (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV ) AB Cable
End Termination (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV ) AB Cable
Straight through joint (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV) AB Cable
Straight through joint (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV) AB Cable
Straight through joint (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV) AB Cable
Mid Span joints for LT AB Cable 3C x 50 Sqmm
Mid Span joints for LT AB Cable 50 Sqmm
Mid Span joints for LT AB Cable 35 Sq mm
Mid Span joints for LT AB Cable 16 Sq mm
Mid Span joints for LT AB Cable 3C x 120 Sqmm
Mid Span joints for LT AB Cable 120 Sqmm
Mid Span joints for LT AB Cable 70 Sq mm
Mid Span joints for LT AB Cable 16 Sq mm
Galvanised stay set with 50 x 8 mm stay clamp, guy insulators (02 Nos) anchor plate (200x200x6mm) nut bolts 2 Nos turn buckles 1.8m long 16mm diameter solid GS stay rod complete
7/3.15 mm dia GI stranded wire
GI Earthing Rods
Personnel Protective Equipments: Unloading of following Personnel Protective Equipments by Mannual/mechanical means. Verification and carriage to storage site including storage of the same.
Full body safety harness,
workman safety shoes,
safety helmets,
high voltage gloves,
high voltage detector sets 220/132 KV
high voltage detector sets 33/11 KV
Earthing discharge rods 11/33 KV KV System
Earthing discharge rods 132-220 KV System
Carriage of Personnel Protective Equipments from storage site to loading site and loading of same into truck.
Full body safety harness,
workman safety shoes,
safety helmets,
high voltage gloves,
high voltage detector sets 220/132 KV
high voltage detector sets 33/11 KV
Earthing discharge rods 11/33 KV KV System
Earthing discharge rods 132-220 KV System
Physical Verification, carriage and stacking back personnel protective equipments
Full body safety harness,
workman safety shoes,
safety helmets,
high voltage gloves,
high voltage detector sets 220/132 KV
high voltage detector sets 33/11 KV
Earthing discharge rods 11/33 KV KV System
Earthing discharge rods 132-220 KV System
Unloading of Control Cable Drums by mannual/ mechanical means. Verification and carriage to storage site including storage of the same.
2 Core 2.5 mm sq Control Cable
4 Core 2.5 mm sq Control Cable
6 Core 2.5 mm sq Control Cable
8 Core 2.5 mm sq Control Cable
10 Core 2.5 mm sq Control Cable
12 Core 2.5 mm sq Control Cable
Carriage of Control Cable Drums from storage site to loading site and loading of same into truck
2 Core 2.5 mm sq Control Cable
4 Core 2.5 mm sq Control Cable
6 Core 2.5 mm sq Control Cable
8 Core 2.5 mm sq Control Cable
10 Core 2.5 mm sq Control Cable
12 Core 2.5 mm sq Control Cable
Physical verification, carriage and stacking back Control Cable Drums
2 Core 2.5 mm sq Control Cable
4 Core 2.5 mm sq Control Cable
6 Core 2.5 mm sq Control Cable
8 Core 2.5 mm sq Control Cable
10 Core 2.5 mm sq Control Cable
12 Core 2.5 mm sq Control Cable
Unloading of XLPE Twin Core Cable Drums by mannual/ mechanical means. Verification and carriage to storage site includig storage of the same.
10 mm sq Twin Core Cable (Armoured)
10 mm sq Twin Core Cable (Un-Armoured)
16 mm sq Twin Core Cable (Armoured)
16 mm sq Twin Core Cable (Un-Armoured)
Carriage of XLPE Twin Core Cable Drums from storage site/Unrolling, Measurement, Cutting to loading site and loading of same into truck
10 mm sq Twin Core Cable (Armoured)
10 mm sq Twin Core Cable (Un-Armoured)
16 mm sq Twin Core Cable (Armoured)
16 mm sq Twin Core Cable (Un-Armoured)
Physical verification carriage and stacking back XLPE Twin Core Cable Drums
10 mm sq Twin Core Cable (Armoured)
10 mm sq Twin Core Cable (Un-Armoured)
16 mm sq Twin Core Cable (Armoured)
16 mm sq Twin Core Cable (Un-Armoured)
Unloading/ Loading/ Physical Verification by mannual/mechanical means of the following material:
10-60 Amp 1 Phase Energy Meters
3-Phase Energy Meters
Prepaid/ Smart Energy Meters
33 KV CT/PT Units
Earth Wire
11 KV 630 Amp Isolator with Earth Switch
Misc. items like fittings, nuts bolts, MCB's etc
Surface Dressing/ ground clearance within store area, including uproating of unwanted vegetation, thorny bushes, small trees etc, & then its disposal properly for smooth handling of material.
Repair and maintenance of existing illumination in store yard and divisional permises viz: Tighteneing of loose conductor including straightening of fexisting poles and providing of spacers between the conductors (Line length 1 Km 3 wire LT Line)
Providing and fixing of one No street light LED 90 watts of reputed make with hardware fitting complete job having warranty as per firms norm.
Repair and maintenance of existing non-functional street lights installed in store yard.
AMC for the existing 30 MT Electronic Weigh Bridge (through authorized service provider) installed in the store yard. Load Cells 30 MT Make Multi Weigh. a) AMC Changes will be paid annually after verification from concerned AEE. b) AMC will be comprehensive nature including all parts except load cell & PCB. c) Provide two routine maintenance per year besides breakdown. d) Specially trained mechanic be sent fortnightly for routine calibration. e) In case of breach of contract, division has the right to terminate the contract without any liability on it to get same done from other source at the cost and risk of the contractor.
Unloading by mannual / Mechanical means for items Tor Steel, Angle, Channel, Nuts and Bolts, Guy Wire/GI Wire
Loading by mannual / Mechanical means for items Tor Steel, Angle, Channel, Nuts and Bolts, Guy Wire/GI Wire
Physical Verification, Carriage by mannual / Mechanical means for items Tor Steel, Angle, Channel, Nuts and Bolts,Guy Wire/GI Wire
Providing and fixing of 0.8 KVA Invertor alongwith maintenance free 12 Volt Battery of reputed make
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
SBD2025-26.pdf
Tender Documents • 0.62 MB
BOQ_990427.xls
BOQ • 0.85 MB
Download all tender documents and submit your bid