Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹7.1 L+₹81,348.91 (12.9%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹7.3 L+₹97,372.07 (15.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹7.4 L+₹1.1 L (17.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | A Vinoth L1 | TENNY T J L2 | Baiju v.p L3 | SATHYAJITH K L4 |
|---|---|---|---|---|---|---|---|
| 1.00civil works | |||||||
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 870 | sqm | 217 ₹1,88,790 | 182.4 ₹1,58,688 Lowest | 210 ₹1,82,700 | 189.5 ₹1,64,865 |
| 1.00 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 0.21 | cum | 4,607 ₹953.65 | 3,870.6 ₹801.21 Lowest | 4,200 ₹869.4 | 4,021.74 ₹832.5 |
| 1.00 | 50.9.13.2:Supplying and fixing Pingoda wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | 0.37 | cum | 50,000 ₹18,600 Lowest | 85,427.2 ₹31,778.92 | 80,000 ₹29,760 | 88,752.69 ₹33,016 |
| 1.00 | 50.9.13.4:Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | 0.08 | cum | 9,940 ₹815.08 | 8,350 ₹684.7 | 8,000 ₹656 Lowest | 8,675.12 ₹711.36 |
| 1.00 | 50.9.14.4:Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc . complete. | 0.19 | cum | 20,000 ₹3,760 | 20,555.2 ₹3,864.38 | 2,000 ₹376 Lowest | 21,355.43 ₹4,014.82 |
| 1.01 | OD300022/2025-2026:oiling with waste oil two coat to the roof members including all cost and materials,conveyance, labour charges etc complete | 900 | sqm | 65 ₹58,500 | 85.1 ₹76,590 | 50 ₹45,000 Lowest | 88.38 ₹79,542 |
| 1.01 | OD300024/2025-2026:Supplying and stacking MP Tiles including all cost and conveyance charges etc. complete. | 30 | no | 38 ₹1,140 | 32.1 ₹963 Lowest | 37 ₹1,110 | 33.31 ₹999.3 |
| 1.01 | OD300018/2025-2026:Providing and Fixing 15cm Long body Tap | 5 | each | 707 ₹3,535 | 594.5 ₹2,972.5 Lowest | 700 ₹3,500 | 617.63 ₹3,088.15 |
| 1.01 | OD300017/2025-2026:Supplying and stacking MP Hip and Ridge Tiles including all cost and conveyance charges etc. complete. | 40 | no | 52 ₹2,080 | 44.1 ₹1,764 Lowest | 50 ₹2,000 | 45.81 ₹1,832.4 |
Tender Value
₹8.5 L
EMD Value
₹21,177
Closing Date
15 Jul 2026, 1:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER PWD BUILDINGS SUBDIVISION THRISSUR
Urgent special repair
2026_PWD_859938_1
PWD/BLDG/TR/996/2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
Ayyanthole
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,870
Yes
₹21,177
Yes
17 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
15 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1civil works | |||||
| 1.001 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | - | sqm | - | - |
| 1.002 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 1 | cum | - | - |
| 1.003 | 50.9.13.2:Supplying and fixing Pingoda wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | - | cum | - | - |
| 1.004 | 50.9.13.4:Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | 1 | cum | - | - |
| 1.005 | 50.9.14.4:Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc . complete. | 1 | cum | - | - |
| 1.006 | OD300022/2025-2026:oiling with waste oil two coat to the roof members including all cost and materials,conveyance, labour charges etc complete | - | sqm | - | - |
| 1.007 | OD300024/2025-2026:Supplying and stacking MP Tiles including all cost and conveyance charges etc. complete. | - | no | - | - |
| 1.008 | OD300018/2025-2026:Providing and Fixing 15cm Long body Tap | - | each | - | - |
| 1.009 | OD300017/2025-2026:Supplying and stacking MP Hip and Ridge Tiles including all cost and conveyance charges etc. complete. | - | no | - | - |
stage.html
html • 0.02 MB
finance_1454114.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
BOQ_1454114.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .