| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L1 | Accepted-AOC SINCE L1 | |
| 2 | L2₹8.4 L+₹30,319.88 (3.73%)Rejected-Finance JHARKHAND | LOHARDAGA | JHARKHAND | 835302 | L2 | Rejected-Finance SINCE L2 | |
| 3 | Rejected-Technical ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | - | Rejected-Technical NOTSUBMITTED ALL THE RELEVANT DOCUMENTS |
Tender Value
Refer Docs
EMD Value
₹11,100
Closing Date
18 Feb 2025, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Renovation of 440V OHL with changing of 07 no. damaged poles, conductor, insulators and making of 03 no. shed for protection of 03 no. Indoor type Transformers at IWSP under Sarubera Project.
2025_CCL_328202_1
GM (K)/EnM/eTender/24-25/265
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹11,100
9 Apr 2025
6 Feb 2025
19 Feb 2025
6 Feb 2025
18 Feb 2025
7 Feb 2025
6 Feb 2025 - 13 Feb 2025
Amount
Supply of Cement Pole upto 9 Meter, Wire Load capacity 400 KG.
Erection of RCC/ PCC pole of following length in brick ballast and ramming the foundation, finishing with 150mm thick cement concrete (1:3:6) layer on top with including excavation and refilling etc as required. Above 8.0 metre and upto 11.0 metre
Supplying and erection of bow stay set complete (galvanised) with 19/20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm x 45 cm x 7.5 mm, thimble, stay clamps, tum buckle (20 mm x 60 cm), 7/4.00 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size foundation including excavation and refilling and also with 0.6 m long brace of size 50 mm x 50 mm x 6 mm angle iron with 50 mm dia pulley fixed at one end of the brace as required.
Supplying of channel iron 75 mm X 40 mm x 6 mm (7.14 kg per metre) cross arm for 4 wire over head line complete with clamps, bolts, nuts and washer etc including drilling of holes for insulator pins etc (as per drawing) and painting with primer and finished paint as
Errection of angle iron/channel iron cross arm on wood/RCC/PCC/steel tubular/rail pole etc as req.
Supplying and errection of 100 mm X 110 mm shackle insulator with Gi bolt, nuts and straps etc as req
Supplying & errection of 100 mm X 80 mm pin Insulator complete with Gt spindle and nuts etc as required.
Supply & erection of LT phase separator 04 wire (PVC/Rubber type) as required
Supply & erection of GI Wire 8 Swg (SX45+1.5X45) X 0.131 X 155pan = 191.91 KG) For Credling
supplying and erecting earth pit of minimum bore dia 150mm size, approved make Safe Earthing Electrode consisting Pipe-in-Pipe technology as per 15 3043-1987 made of corrosion free G.I. Pipes with constant ohmic value surrounded by highly conductive compound with high charge dissipation suitable for effective and maintenance free earthing With 3 mtr. G.1. Pipes having outer pipe dia of 50mm having 80-200 micron galvanizing, inner pipe dia. of 25mm having 200-250 Micron galvanizing, connection terminal dia.of 12mm in nominal soil with 50 kg (Two Bag) Back filling Compound.
Supply & erection of 16 Sqmm single core Flexible Aluminium Cable
Supply and fixing of Aluminium lug 165QMM
Errection of ACSR conductor of 7/3.35 mm to 7/4.0 mm dia and abobe including binding etc as req
Dismantling of over head lines comprising of copper/aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required. (110 Span X 1 wire +08 span X 2 wire + 2 span X3+6 span X 4 wire)X 45 X 0.1492 X 1.05 Sagging=465.28)
Dismantling of existing damaged pole/street light standard/strut embeded in cement concrete etc as req.
Providing and making steel pole collar with cement concrete (1 cement: 3 coarse sand: 6 stone aggregate 20mm) of specified size and shape including form work, plastering if required, curing etc as required
Painting of pole
Making of Shed
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soll.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size) (1 M X 0.8 M X 0.4 M X 18 nos. 5.76Cum)
fabrication and erection of iron Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated) or Lhooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/m² 24 X 3 Nos 64X4M
Enamel paint in all shades
Total impact of GST for the purpose of CTC
M/s Achal Electricals (BID ID -1125700)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .