Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-AOC 00 VPO MALIKPUR BANGER TEH BILASPUR DISTT YAMUNANAGAR 135102 | MALIKPUR BANGER | YAMUNANAGAR | HARYANA | 135102 | 1 | Accepted-AOC Accepted due to lower rate quoted | |
| 2 | 2₹2.2 L+₹7,366.01 (3.50%)Rejected-Finance | 2 | Rejected-Finance Higher rate Quoted | |
| 3 | 3₹2.2 L+₹10,526.42 (5.00%)Rejected-Finance | 3 | Rejected-Finance Higher rate Quoted |
Tender Value
₹2.1 L
EMD Value
₹4,220
Closing Date
15 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Rajesh Sharma
Municipal Committee Sadhaura
Construction of RCC Box type Pullia in front of HAFFAD Godown Revenue Rast
2026_HRY_552915_1
2026842FDD6C C569 4105 A625 DF87AFAD33211314ULB
Open Tender
Civil Works
Works
60 days
SADHAURA
Construction of RCC Box type Pullia in front of HAFFAD Godown Revenue Rast
2 documents required · 2 mandatory
₹1,000
₹4,220
Yes
13 Nov 2026
8 Oct 2026
16 Oct 2026
8 Oct 2026
15 Oct 2026
8 Oct 2026
150 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 2.63 | cum | 1,863 | ₹4,899.69 |
| 2 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | 140 | cum | 83 | ₹11,620 |
| 3 | [3.1.3]By Mechanical Transport including loading, unloading and stacking 3. Manure or sludge [5km] | 40 | cum | 108 | ₹4,320 |
| 4 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 28 | cum | 78 | ₹2,184 |
| 5 | [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate] | 112 | cum | 138 | ₹15,456 |
| 6 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 11.98 | cum | 4,374 | ₹52,400.52 |
| 7 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] | 133.42 | Sqm | 156 | ₹20,813.52 |
| 8 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] | 1,500 | Kg. | 66 | ₹99,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_632784.xls
BOQ • 0.28 MB
AD0182201.pdf
Additional Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .