Dy.Minicipal Commissioner - West Zone
Construction RCC Road and fixing paver block work at Different Roads in Naranpura ward in West zone.
283337
8/25-26 (T.N.135)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹3,600
Yes
Municipal Commissioner, Ahmedabad
₹2.5 L
Yes
6 Mar 2026
6 Mar 2026
6 Mar 2026
6 Mar 2026
6 Mar 2026
Sr. Item Rate Per Quantity Amount
1 Dismantling the following including loading,
unloading and disposal of unserviceable material
for all lead or as directed by Engineer-In-Charge
and stacking the serviceable material and
backfilling the resulting trenches and pits
a centralverge-kerbstone(LawgardenRate) 44.49 Rmt 1,000.00
b Dismantling tiled or stone floors laid in mortar
including stacking ofserviceable material and
disposal of uservicalble material with all lead and 47.25 Smt 1,000.00
lifts.(R&B SOR 2023-24 ITEM CODE
Item no.as per NBO 20.23)
c Demolition & disposal of unservisable material
with all lead and lift for unreinforeced/Lime
concrete. (R&B SOR 2023-24 ITEM CODE
20001B Item no.as per NBO 20.1)
d Demolition of brick work & stone masonry
including stacking of serviceable materials and
disposal of unserviceable materials with all lead
and lift(1) In cement mortar.(R&B SOR23-24
ITEM CODE 20003B Item no.as per NBO
e Demolition including stacking of serviceable
materials and disposal of unserviceable materials
with all lead and lift.(I) R.C.C work.(R&B 1,047.38 Cu.m 50.00
SOR2023-24 ITEM CODE 20002 Item no.as
2 Extrarateoveritemofexcavationofearthforexcavati
onofasphaltpavement/ RCC of thickness up to
0.20 meter including demolishing the asphalt
carpet, metal,s oiling/cutting Reinforcement
etc.comp. with stacking the material as directed.
(Based on Previously approved rate by C E sir )
a upto0.20meterthickness(ByManual) 71.1 Smt 4,000.00
b 0.20 to 0.30 meter (By any type ofBreaker
Machine or R.C.C.Cutter machine including cost 177.76 Smt 2,500.00
of operator, fuel, & transportation etc complete.
c 0.30 meter & above (Byanytype ofBreaker
Machine or R.C.C.Cutter machine including cost 311.08 Smt 2,000.00
of operator, fuel, & transportation etc complete.
3 Barricading the entire break down or excavated
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
reflectivepaint/Boardoutsidetoavoidaccident&for
smoothtrafficdiversion & movement including
cautionary board etc. Item also includes for 79.99 Rmt 200.00
making temporary sufficient nos of lighting
arrangement through out the work with necessary
required arrangement. ..The same shall be
removed after completion of work. (Only for
break down work from start to complete) (Based
onDrainage SOR 2009-10)
4 Box cutting the road surface to proper slope and
camber for making a base for road work
including removing the excavated stuff and
depositing on the road side slope as directed upto 205.35 Cmt. 4,200.00
50Mt.lead. (EXECUTED WITH MANUAL
LABOUR)(R&B SOR 23-24 ITEM CODE
5 Providing and supplying JCB machine on rental
basis in case of emergency situation and
breakdown type work and also during
unavoidable condition as per instruction of engg.
Incharge, rate includes all nece. Shifting, fuel and
operating charges and stacking of useful and non
useful materials separately up to store.(No
payment should beallowed for non working
condition of machinery and for pipe line
excavation and laying work)
6 To provide tractor with hydraulic trolley, driver
with fuel, to carryout different works during day /
night for Hrs. shift. Work shall be carried out as
per the instructions of engineer in-charge. No
extra charged shall be paid for nightshift. SOR
7 Conveyance charge of earth, lime, murrum,
building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any kind
executed outside the road site. Rate also includes
spreading & levelling etc complete. Internal
conveyanceabove50mtdonewithintheworksiteisn
otpayable.(R&B 2023-24 Statement No.5
(3.2.1.A.2. Earth) Page no.5
a a)Leadupto1Km. 46.83 Cmt 200.00
b b)LeadFrom1Kmto2Km. 60.69 Cmt 500.00
c c)LeadFrom2Kmto3Km. 74.49 Cmt 947
d d)LeadFrom3Kmto4Km. 87.72 Cmt 3000
e e)LeadFrom4Kmto5Km. 100.44 Cmt 50.00
f f)LeadFrom5Kmto10Km. 146.74 Cmt 50
g g)LeadFrom10Kmto15Km. 187.74 Cmt 50.00
h h)LeadFrom15Kmto25Km. 224.99 Cmt 50.00
8 Providing,laying,spreadingandcompactinggraded
stoneaggregateto wet mix macadam specification
including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed
Material by tipper to site, laying in uniform
layers in sub- base / base course on well prepared
surface and compacting with vibratory roller to
achieve the desired density as per Codal
Provision.(Approved Rate )
a Production&SupplyofWMM 1,975.00 cmt 200.00
b Layingof WMM 35 cmt 200.00
concreteProvidingandlayinginpositionReadymix
concrete/batchmix concrete of specified grade
for reinforced cement concretework,using cement
content as per approved design mix (Min
cementitious level as per latest IS 456 shall be
maintained) manufactured in fully automatic
batching plant and transported to the site of work
in transit mixer for all lead having a continuous
agitated mixer, for reinforced cement
concretework including
pumpingfromtransitmixertositeoflaying;
costofadmixturesinrecommendedproportionsaspe
rIS: 9103toaccelerate, retard the setting of
concrete, improve workability without impairing
strength and durability; finishing, compacting,
vibrating, curing, dewatering (if required),etc,
excluding the cost of Formwork and
reinforcement, etc complete for all elements, all
floors, all level, any heights/ depths, any lead and
lift as directed by Engineer Incharge.
a ConcreteofM15grade(R&BSOR23-
24IC:5054Page66)
b ConcreteofM20grade(R&BSOR23-
24IC:5055Page66)
c ConcreteofM25grade(R&BSOR23-
24IC:5056Page67)
d ConcreteofM30grade(R&BSOR23-
24IC:5057Page67)
10 Construction of RCC nosing in central verge
using M-200 grade cement concrete. The item
includes cost of centering & shuttering,
reinforcement, both side cement plaster in 4812.72 no 20
C:M 1:3 mortar & curing etc. complete. Half
round portion of the nosing shall be made by
using mild steel.
11 Providing TMT Bar FE 500D reinforcement for
R.C.C. work includingbending, binding and
placing in position complete upto floor two level
(R & B SOR 23-24 IC: 05014C Page 54)
12 Providing formwork of ordinary timber planking
as to give a rough finish including centering
shuttering strutting and propping etc. Height of
propping and centering below supporting floor to
ceiling not exceeding 4 M. and removal of the
same for in situ reinforced concrete and plain
concrete work in. (A) Foundations Footings
Columns etc. and Mass concrete.
13 Providing and fixing FRC Heavy Duty (HD35)
Man hole cover with frame 600mm x 600mm
or 600mm dia clear opening with 100 x 2mm
MS flat all- round, 16mm ø plain round bar for
lifting the cover & shall be fitted withplastic
cups. On the upper peripheryof frame 25 x 3 mm
wide MS flat with hot dip galvanizingshall be 3,223.16 No 30.00
well embed in concrete to protect the edges of
frame. Frame shall be fixed with cement mortar
or cement concrete as per site
condition,asperdrawingandasdirectedbyEngineeri
ncharge. Sample shall be approved before
execution. ( Law Garden Rate )
14 Providingand fixingcastiron manhole frame of
weight 80 to 85 kg suitable for existing EHD-35
FRC MH cover, rate also incl.loading,
unloadingand fixing the frame in line and level to
matchexisisting road levelin C.C.1:2:4and
finishing smooth, watering and protecting for
daysetc. complete as per instruction by engg. in
charge. (Approved Rate )
15 Providing F.R.C. MH ,CP seat cover incl. carting
to the work site etc. comp. Directed.(Based on
rate of central store circular 11/2023-24
a F.R.C. Strom Water Grating Set:- Grating(Jali):
740 x 740 x 90mm square jali, 20:00 MT load
design, 90x2mm MS flat allround, Frame: 600 x
600mm clear opening, outer size-900 5,372.40 Set 50.00
x900x165mm. Onthe upper peripheryofframe
x 3mm wide MS flat should be well embded in
concrete to protect the edges of frame
b F.R.C. Strom Water GratingSet :Grating(Jali):
690 x 690 x 70mm square jali, 20:00 MT load
design, 70x2mm MS flat allround, Frame: 600 x
600mm clear opening, outer size- 800 x800x120 4,923.60 Set 20.00
mm.Onthe upperperipheryofframe25x3mm wide
MSflatshould be well embed in concrete to
protect the edges of frame.
c F.R.C. Heavy Duty [HD-20] MachineholeCovers
only for existing C.I. frames Cover: 610mm Ø &
75mm thick circular cover, 20.00 MT load
design,75x2mmMS flatallround,
16mmplainround bar for lifting the cover &
should be fitted with plastic cups.
d F.R.C. Light Duty [LD-3.00] Chamber Set:-
Cover: 680 x 530 x 35mm rectangular cover,
3:00 MT load design, 35x1.2mm MS flat
allround, 6mm plainroundbar forliftingthe 1,931.60 Set 20
cover&should befitted with plasticcups.Frame:
outer Size - 790 x 640 x 85 mm. 600 x 450mm
f (Only Cover) F.R.C. Extra Heavy Duty [EHD-
35] Machinehole Covers & Frame- 560mmø
clear opening, The dimension of frame and cover 1,557.60 No 20.00
as per mentioned in Amend No.1 to IS 12592:
16 SET cover and frame) F.R.C. Heavy Duty [HD-
20] Machinehole Covers & Frames- 560mm Ø
clear opening, The dimension of frame and cover 2,864.95 Set 10
as per mentioned in Amend No.1 to IS 12592 :
17 Carting and Fixing M.H., Chamber or
CatchpiteSeat and Cover in line and level to
match exisisting road level in
C.C.1:2:4andfinishing smooth, watering and 746.59 No. 50.00
protecting for 7 daysetc. completeas directed.
M.H. seat cover will be supplied byA.M.C.(from
18 Constructing Bombay Pattern Type Catch Pit of
size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick
maso. wall in the prop.ofCM (1:6) with40
mmthickIPSflooringinthe prop M15 atbottom and
15 mm thick cement plaster inside the catch pit in
the proportion of CM (1:3) with out jali etc.
comp. as directed.
19 Catch Pit Jali Fixing P/F FRC catch pit jali with
frame 600mm x 600mm clear opening etc.
comp.. As directed by Engineer-in-Charge and/or
his authorized representative.
a 20MT Capacity 3,178.57 No. 40.00
b 35MT Capacity 3,784.82 No. 40.00
20 Repairing damaged M.H. and rasing M.H. up to
road level incl. removing
damagedbrickworkandrepairingby
brickmasonryinC.M.1:5andplasterin C.M. 1:3
and fixing C.I. steps and existing MH sheet
cover, removing thedebris from MH and carting
the same as directed. (Based on Drainage SOR
a (A)upto0.15mt.(@Two Coarse) 721.6 No. 80.00
b (B)upto0.35mt.(@Four Coarse) 1,144.00 No. 60.00
c (C)upto0.65mt.(@Seven Coarse) 1,768.00 No. 30.00
d (D)upto0.90mt.(@TenCoarse) 2,129.60 No. 20.00
21 Repairing damaged I.C./ Raisingremoving
damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing chamber sheet 396 Nos. 100.00
cover, removing the debris from chamber and
cartingthe same as directed. (Based on Drainage
22 Manufacturing,Testing,Supplying,Loading,Trans
porting To Work Site, Unloading, Lowering In
Trenches, Laying And Jointing R.C.C., Np-4
Class Pipes With socket and spigot joints as per
IS 458-2003 Including EPDMRubber ring etc.
comp.As Directed by engineering in
charge.(GWSSB SOR 22-23 ITEM no:10.1.D
a) 300mminternaldiameter 1,264.00 Rmt 100.00
b) 450mminternaldiameter 2,467.00 Rmt 20
c) 600mminternaldiameter 3,382.00 Rmt 20
d) 900mminternaldiameter 7,337.00 Rmt 10
23 Providing and supplying, lowering, laying and
jointing ISI mark only standard length stoneware
pipes of following class and diameter including
all taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading,
unloading,conveyancetodepartmentalstores,stacki
ngetc.compl.(IS651/1989 or its latest revision)
Class AA (GWSSB SOR 2022-23 , material
Item 11.2 page 17 + labour Item 12 , page
a 100mmdia 182 Rmt 250.00
b 150mmdia 267 Rmt 200.00
c 250mmdia 535 Rmt 100.00
24 Providing, laying and jointing in true line and
level UPVC pipe (SCH-40) of following dia.
Including fittings of standard make as approved
by Engineer-in- charge. (R&B SOR23-24
25 Drillingthe road withoutbreakingthe
roadsurface(Asphalt)forlayingofcable for feeding
power supply by making up to following size of
holes at both ends complete.
(B)Upto150mmboredia(IncludeslabourcessLawg
26 Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling,
Brick Bats Cement Concrete (1:5:10) of
thickness 15 C.M., CC Channel (1:2:4) of
thickness 10 C.M., finished 15 mm thick cement
plasterinside & outside (Only for shaft) In Cm
1:3, Finishing WithCement Slurry, P/F 4 Mm Dia
M.S.Steel Hdpe CoatedSteps 35 Cm C/C At
Cm Staggered Masonary In Cm1:5, Rcc Slab In
Cc1:1.5:3 of thickness 15 C.M.,Including
Cantering & Reinforcement (Single jalli at
C.M. c/cbothway 10 mm dia.)But Excluding The
Cost Of Manhole Seat Cover
Etc..CompletedOfSize0.75X1.00Meter(InsideCle
ar,M.H.lengthshouldbe
paralleltotheflow),M.H.Chamber(P.H.E.)SmallSi
ze,ItemNo.239,PageNo. 63)
a 1.00to2.00meterdepth,(SlabatGroundlevel)(forpip
b 2.00to3.00meterdepth,(Slabatbelow0.60mt.From
G.L.)(forpipedia <=300mm) 11,395.50 No. 15
27 Constructing Slab type M.H. Chamber of the
following size including excavation, refilling,
brick bats cement concrete (1:5:10) of thickness
15 C.M., CC Channel (1:2:4) of thickness
C.M., finished 15 mm thick cement plaster inside
& outside (Only for shaft) in CM 1:3, finishing
withcement slurry, P/F
mmdiaM.S.SteelHDPEcoatedsteps35cmc/cat35c
mstaggeredinmasonary CM 1:5, RCCSlab in CC
1:1.5:3 of thickness 23 C.M., including
Cantering& reinforcement (double jalli at
C.M. c/c bothway 12mm dia.) but excluding
thecostofManholeseatcoveretc..completed.ofSize
1.00 X1.40 meter(Inside Clear,M.H. length
should be parallel to the flow, for pipe dia <=800
a 1.00to2.00meterdepth,(SlabatGroundlevel) 10,177.60 No. 25
b 2.00to3.00meterdepth,(Slabatbelow0.6mt.FromG
28 Supplying and fixing of 380 mm H x 300 mm L
x 200 mm B Kerb block for Central Verge in M-
20 gradeusing20 mm nominal sizeblacktrap
aggregateof Sevaliya/Timba or equivalent quality
for pre-cast blocks, reasonably exposed finish/
formwork, mould with well equipped with
vibratory system for kerb stones of approved
design including curing, etc. complete, including
the cost of formwork etc. complete.The rate shall
also include necessary cutting of asphalt, fixing
the Kerb stones in line and level on 5 cm thick
sand beddingwith necessary equipments and
materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sidesofthe
kerb stonefixed withBituminousconcrete mixed
inproperposition as directed by Engineer in
change to form a portable mixture.In any case
Gravel or such type of materials shall not be
allowed for production.
29 Supplying and fixing of 300 mm-L x 150 mm-
Bx 380 mm-H Kerb block for Footpath in M-20
grade using 20 mm nominal size black trap
aggregate of Sevaliya/Timba or equivalentquality
for pre-cast blocks, reasonably exposed finish/
formwork , mould with well equipped with
vibratory systemfor kerb stones of approved
design including curing, etc. complete, including
the cost of formwork etc. complete.The rate shall
also include necessary cutting of asphalt, fixing
the Kerb stones in line and level on 5 cm thick 350.89 Rmt 1,500.00
sand beddingwith necessary equipments and
materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sidesofthe
kerb stonefixed withBituminousconcrete mixed
inproperposition as directed by Engineer in
change to form a portable mixture.In any case
Gravel or such type of materials shall not be
allowed for production.a) Laying on 5 cm thick
30 Pre cast concrete kerb Providing and fixing M25
Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as
per approvedsample of any size and any type.
Kerbs shall be fixed on the foundation prepared
as per approved design. The rate shall also
include for erecting and fixing the pieces in
position for complete kerb system with
chamfered type of kerbs including necessary
accessories of kerb like radius kerb, angles and 1,061.61 Rmt 250.00
quadrant kerbs, droplet kerbs etc. complete as per
drawing. Kerb shall be fixed as paper joint
without any jointing material. However cement
mortar shall be provided at the backside of kerb
stone joint. (Sample must be approved) Cost of
excavation, cutting , base , side filling shall
includes as directed engineer - incharge in above
item description as per BOQ (a) 450 mm high
median kerb.As per approved rate
31 Pre cast concrete kerb Providing and fixing M25
Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as
per approvedsample of any size and any type.
Kerbs shall be fixed on the foundation prepared
as per approved design. The rate shall also
include for erecting and fixing the pieces in
position for complete kerb system with
chamfered type of kerbs including necessary
accessories of kerb like radius kerbs, angles and 912.5 Rmt 300.00
quadrant kerbs, droplet kerbs etc. complete as per
drawing. Kerb shall be fixed as paper joint
without any jointing material. However cement
mortar shall be provided at the backside of kerb
stone joint. (Sample must be approved) Cost of
excavation, cutting , base , side filling shall
includes as directed engineer - incharge in above
item description as per BOQ (b) 375 mm high
Footpath kerb.As per approved rate
32 Labour work for fixing interlocking blocks / any
kind of pavement on up to 50 mm thick sand
bedding, levelling,watering and fixing in line & 69.64 Smt 1,000.00
level as well cleaning the site etc.comp. as
33 Paver Block60 mm thickProviding and laying
shot blasted Non - interlocking, Paver blocks of
specified thickness, size, grade of concrete and
colour machine made and blastingbyautomatic
shotblasting machine and high density of as per
approved sample of approved make for footpath,
parkingareas, service lanes,cross over and other
areas as mentioned in the drawing. Including
providing and laying 50 mm thick averave
bedding layer of coarse sand below paver block
as per required grading and specification. Laid
paver block shall be mechanicallycompacted.
The work ofthe paving blocks shall be executed
inline and levelbyskilled masonof flooring work
only. Smallsize of paver block with same
specification shall be used at residue or at end. It
should be laid in such a way that the no cutting of
the paver block to be necessary. If
cuttingofpaverblockshallbe
required,thancutbymachineonlyandlayingto
bedonebyskilled flooring mason.Thefinished
surfaceofthepaverblockshall have coarse sand
Texture Finish. Pave blocks shall be compacted
and shall be re-laid if necessary. Actual laid area
shall be measured and paid without any wastage.
(A) 60 mm thick M-35 grade Grey Paver block
of size 200mm x 200mm.As per approved rate
(Law garden Incuding Labour Cess)
34 Paver Block80 mm thickProviding and laying
shot blasted Non - interlocking, Paver blocks of
specified thickness, size, grade of concrete and
colour machine made and blastingbyautomatic
shotblasting machine and high density of as per
approved sample of approved make for footpath,
parkingareas, service lanes,cross over and other
areas as mentioned in the drawing. Including
providing and laying 50 mm thick averave
bedding layer of coarse sand below paver block
as per required grading and specification. Laid
paver block shall be mechanicallycompacted.
The work ofthe paving blocks shall be executed
inline and levelbyskilled masonof flooring work
only. Smallsize of paver block with same
specification shall be used at residue or at end. It
should be laid in such a way that the no cutting of
the paver block to be necessary. If
cuttingofpaverblockshallbe
required,thancutbymachineonlyandlayingto
bedonebyskilled flooring mason.Thefinished
surfaceofthepaverblockshall have coarse sand
Texture Finish. Pave blocks shall be compacted
and shall be re-laid if necessary. Actual laid area
shall be measured and paid without any wastage.
(A) 80 mm thick M-35 grade Grey Paver block
of size 200mm x 200mm. As per approved rate
(Law garden Incuding Labour Cess)
35 Providingandlayingcementconcretetactileflagsto
impairedpersonsasperstandards)ofsize300x 300x
60mmthickof approved make and pattern having
water absorption not over 6% and conforming to
IS: 13801:1993, of approved make, pattern and
lightresistantcoloursfromLanxessonly)inoutdoorfl
oorssuchas 1,187.05 Smt 50.00
footpath,plaza,multimodalslocationetc.,laidon40
cementmortar1:4(1cement:4coarsesand)inallshap
es&patterns including grouting the joints with
white cement mixed with matchingpigments,
curing, finishing etc. complete as per direction of
Engineer-in- Charge. Sample shall be approved
by Engineer in charge. Law Garden Rate)
36 Providing and fixing Tree Guard with grey
exposed finish in grade M-20 with nominal
steeland wall thickness of 100mm. (Approved
Extra Item Rate)
a OuterSize700X700 794.64 NO 20
b OuterSize900X900 1,121.00 NO 20
37 Providing and laying cement concrete 1:4:8 (1-
Cement : 4- coarse sand : 8- hand broken stone
aggregates 40 mm nominal size) and curing 2653.67 Cmt 1,000.00
complete excluding cost of formwork in (A)
Foundation and Plinth
38 Providing and laying cement concrete 1:5:10 (1-
Cement : 5- Coarse sand : 10- hand broken stone
aggregates 40 mm nominal size) and curing
complete excluding cost of formwork in (A) 2492.51 Cmt 400.00
Foundation and Plinth
39 Providing and laying cement concrete 1:3:6 (1-
Cement : 3- Coarse sand : 6- Graded brick bat
aggregate 40mm normal size) and curing
complete 2956.44 Cmt 100.00
excluding cost of formwork in (A) Foundation
40 Making 15 mm groove in RCC work on road and
filling it with polysulfied selant and finished it 26.4 rmt 3,500.00
good incl.all labour charges etc comp as directed.
41 Providing & Applying Tri mix with Machine
floater machine on constructed RCC work
including Machine & Labour etc Comp as 48.21 Sqm 10,000.00
42 Supplying electric breaker machine for RCC slab
or asphalt demolishing work on site by using
operator, fuel, power supply etc.complete as
directed. (no payment should be allowed for non
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for
break down work) (Based on Previously
approved rate by CE sir )
43 Providing and Laying of Rubber Moulded
Paver Block Grey/Coloured 60 mm thick, M-35
Grade of any size ; shape (Usually Uni-Paver
Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other
areas as mentioned in the drawing /
instruction of engineer in charge. Cost
includes formworks using rubber mould, Rate
providing and laying paver blocks as per
required grading and specification. The paver
block shall be mechanically compacted. The
work of paving blocks shall be executed in
line and level by skill mason of flooring work
only. It should be laid in such a way that the no
cutting of the paver block to be necessary. if
cutting of paver block necessary then it
should be cut by machine only and carting.
The finished surface of the paver block shall
have resonably good, plain finished. Paver blocks
shall be compacted and shall be relaid if
necessary. Gravel or such type of materials shall
not be allowed for production.
Laying on 5cms thick sand beddding.
44 Supplying, labour for break down
repairing work for activities like
excavation, disliting, removing debris
from trench back filling etc. comp. as
directed by Eng.in charge.
Mazdoor at day /Night 292.86 No 60.00
Makadam/ supervision at day / Night 310.71 No 20.00
45 Excavation for pipe line trenches for water
supply, sewerage lne, manhole etc. all with
shoring and struting if required as per
required gradient and line including safety
provisions using site rails and stacking
excavated stuff including up to all required
lead cleaning the site etc. complete for all
lifts and strata as specified. (GWSSB SOR
Upto 1.50 mt depth 83.93 Cmt 100.00
1.5 mt to 3 mt depth 92.86 Cmt 50.00
3.00 mt to 4.50 mt depth 97.32 Cmt 10.00
4.50 mt to 6.00 mt depth 103.57 Cmt 10.00
46 Providing , Supplying and using size 15 to
mm dia. Pvc mm Pipe line Up To
Mtr.Length.With Matirials like Pipe, Coupler,
Union, Elbow, TEE, End-Cap, Band, F.T,
M.T, Tailpiece, Reducer, M-Seal, Solution,
Excavation per day per ward including
Labor and Fitter To PreventLeakage etc.As
per instuction of Engineer
incharge.Excavation. including Labor and
47 Providing , Supplying and using Of up to
mm To 75 mm dia.Pve Pipe line For Braking
Connection Up to 1Mtr Length With Matirials
like Pipe, Coupler, Union, Elbow, TEE, End-
Cap, Band F.T, M.T, Tailpiece, Reducer, M-
Seal, Solution, Excavation per day per ward
including Labor and Fitter To Prevent
Leakage etc.As per instuction of Engineer
incharge. Excavation. including Labor and
Total Amount Rs.
Total Amount Rs.
Contractor'sSign Addl.C.E.
MobilNo:- (westzone)
GENERAL TECHNICAL SPECIFICATION SECTION
Following technical specifications shall be applicable to the relevant items of BOQ
Dismantlingthefollowingincludingloading,unloadinganddisposalofunserviceablematerialforallleadorasdirecte
dbyEngineer-In-
Chargeandstackingtheserviceablematerialandbackfillingtheresultingtrenchesandpitscomplete.
a. centralverge-kerbstone.
b. Dismantlingtiledorstonefloorslaidinmortarincludingstackingofserviceablematerialanddisposal
ofunserviceablematerialwithallleadandlifts.
c. Demolition&disposalofunserviceablematerialwithallleadandliftforunreinforcedconcrete.
d. Demolitionofbrickwork&stonemasonryincludingstackingofserviceablematerialsanddisposalof
unserviceablematerialswithallleadandlift(1)Incementmortar.
e. Demolitionincludingstackingofserviceablematerialsanddisposalofunserviceablematerialswith
allleadandlift.(I)R.C.Cwork.
Thedemolitionshallconsistofdemolitionofoneormorepartsofthestructureasspecifiedorshowninthedrawings.De
molitionimpliestakingupordownorbreakingup.Thisshallconsistofdemolishingwholeorpartofworkincludingallrele
vantitemasspecifiedorshowninthedrawings.
Thedemolitionshallalwaysbeplannedbeforehandandshallbedoneinreverseorderoftheoneinwhichthestructurew
asconstructed.Biddersisfullyresponsibleforproperandsafedemolition.
Necessarydropping,shoringandunderpinningshallbeprovidedforthesafetyoftheadjoiningworkorproperty,whichi
stobeleftintact,beforedismantlinganddemolishingistakenupandtheworkshallbecarriedoutinsuchawaythatnoda
magesiscausedtotheadjoiningproperty.
Whereverrequired,temporaryenclosuresorpartitionsshallalsobeprovide1.Necessaryprecautionsshallbetakentok
eepthedustnuisancedownasandwherenecessary.
Dismantlingshallbecommencedinasystematicmanner.Allmaterialswhicharelikelytobedamagedbydroppingfroma
heightordemolishingroof,masonryetc.shallbecarefullydismantledfirst.Thedismantledarticlesshallbeproperlystac
AllmaterialsobtainedfromdemolitionshallbethepropertyofGovernmentunlessotherwisedshallbekeptinsafecusto
dyuntilhandedovertotheEngineer-in-charge.
Anyserviceablematerials,obtainedduringdismantlingordemolitionshallbeseparatedoutandstackedproperlyasdir
ected,withallleadandlift.Allunserviceablematerials,rubbishetc.shallbstackedasdirectedbytheEngineer-in-charge.
Oncompletionofwork,thesiteshallbeclearedofalldebrisrubbishandcleanedasdirected.
Modeofmeasurements&payment:
Measurementsofallworkexcepthiddenworkshallbetakenbeforedemolitiondismantlingandnoallowanceforincreaseinbulkshall
beallowed.Thedemolitionoflimeconcreteshallbemeasuredunderthisitem.Specificationfordeductionforvoids,openingsetc.shall
beonsamebasisasthatemployedforconstructionofwork.
Allworkshallbemeasuredindecimalsystemasfixedinitsplacesubjecttothefollowinglimits,unlessotherwisestatedhereinafter:(a)
Dimensionsshallbemeasuredtothenearest0.01mt.(b)Areashallbeworkedouttothenearest0.01sq.mt.(c,d,e)Cubicalconnections
hallbeworkedouttothenearest0.01Cu.m.
Therateshallincludecostofalllabourinvolvedandtoolsusedindemolishinganddismantlingincludingscaffolding.Therateshallalsoi
ncludethechargesforseparatingoutandstackingtheserviceablematerialsproperlyanddisposingtheunserviceablematerialswitha
llleadandlift.Theratealsoincludesfortemporarystoringforthesafetyoftheportionnotrequiredtobepulleddownorofadjoiningpro
pertyandprovidingtemporaryenclosuresorpartitionswhereconsiderednecessary.
Therateshallbeforaunitofonecubicmetre.ForD
ismantlingofTiledFloor:
TherelevantspecificationsshallbefollowedexceptthedismantlingoftiledorstonefloorslaidonmortarsshallbedoneDismantlingim
pliescarefullytakingupordownorthesearefixedbynailscrewsboltsetc.theshallbetakenoutwithpropertools.
Modeofmeasurement&Payment:
Thesupportingmaterialssuchasjointsbeamsifanyetc.shallbemeasuredseparately.Therateshallincludestackingtheunserviceablem
aterialsasdirectedwillleadandlift.
Therateshallbeforaunitof(a)RMT(b)onesq.Meter(C)CMT(d)Cu.m(e)Cu.m
Extrarateoveritemofexcavationofearthforexcavationofasphaltpavement/RCCofthicknessupto0.20meterincludingdemolish
ingtheasphaltcarpet,metal,soiling/cuttingReinforcementetc.comp.withstackingthematerialasdirected.
TheItemshallbecarriedoutasperItemdescriptionandasperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
Therateincludesthecostofexcavationofbituminousmacadami.e.bituminouslayersonlylikeDBM,BCetcincludingthelabours,tools
,equipmentandallotherincidentalexpenses.NonBituminousSub-layer/Subbasearenotconsideredinthisitem.
WorkshallbecarriedoutmanuallyorbyMachineryaspersiterequirements.Them
odeofpaymentforthisitemshallbeonSmt.Basis.
Barricadingtheentirebreakdownorexcavatedareaonlumsumrentalbasisusingwoodenballies/M.S.anglesatmax.
2.0metercentertocenter,C.G.Isheet,reflectivepaintoutsidetoavoidedaccidentandforsmoothtrafficdiversionandmovementincl
udingcautionaryboardetc.thesameshallberemovedaftercompletionofwork.
Theheightofthebarricadesshouldbeminimum1.20mtfromthegroundlevel.TheItemshallbecarriedoutasperItemdescriptionand
asperinstructionofEngineer-in-
Chargeand/orhisauthorizedrepresentative.Afterremovalofbarricades,allmaterialrelatedtobarricadingshallbepropertyoftheBi
ThemodeofpaymentforthisitemshallbeonRmt.Basis.
The measurement shall be in Sq.mt for bituminous road surface.
BoxcuttingtheroadsurfacetoproperslopeandcamberformakingabaseforroadworkorExcavationforallkindsofsoilEarthworkin
excavationforallkindofsoilbyanymeansincludinggettingouttheexcavatedsoil,sortingandstackingofusefulmaterial,dressingo
fthesides,rammingofbottom,anddisposalofsurplusexcavatedearthforupto200Mt.leadareaandliftanyDepthetccompleteasd
irectedbyengineer-in-charge.
Anysoilwhichgenerallyyieldstotheapplicationofackaxesandshoves,phawarasrakesoranysuchordinaryexcavatingimplementoro
rganicsoil,gravelsilt,sandturfloam,clay,peatetc.,fallunderthiscategory.
Clearingthesite:
Thesiteonwhichthestructureistobebuiltshallbeclearedandallobstructions,loosestone,materialsandrubbishofallkind,bush,woo
dandtreesshallberemovedasdirected.ThematerialssoobtainedshallbepropertyoftheGovernmentandbeconveyedandstackeda
sdirected.within200M.lead.Therootsofthetreescominginthesidesshallbecutandcoatedwithahotasphalt.
Therateofsiteclearanceisdeemedtobeincludedintherateofearthworkforwhichnoextrawillbepaid.
Afterclearingthesite,thecenterlineswillbegivenbytheEngineer-in-
charge.TheBiddersshallassumefullresponsibilityforalignment,elevationanddimensionofeachandallpartsofthework.Bidderssha
llsupplylaborers,materials,etc.requiredforsettingoutthereferencemarksandbenchmarksandshallmaintainthemaslongasrequir
Theexcavationinfoundationshallbecarriedoutintruelineandlevelandshallhavethewidthanddepthasshowninthedrawingsorasdi
rected.TheBiddersshalldothenecessaryshoringandshuttingorprovidingnecessaryslopestoasafeangle,athisown-
cost.Thepaymentforsuchprecautionarymeasuresshallbepaidseparatelyifnotspecified.Thebottomoftheexcavatedareashallbe1
evenedbothlongitudinallyandtransversely.asdirectedbyremovingandwateringasrequired.Noearthfillingwillbeallowedforbring
ingittolevel,ifmistakeoranyotherreasonexcavationismade.deeperorwiderthatshownontheplanordirected.Theextradepthorwi
dthshallbemadeupwithconcreteofsameproportionasspecifiedforthefoundationconcreteatthecostoftheBidders.Theexcavatio
nupto1.5m.depthshallbemeasuredunderthisitem.
Disposaloftheexcavatedstud:
Theexcavatedstuffoftheselectedtypeshallbeusedinfillingthetrenchesandplinthorlevelingthegroundinlayerincludingramminga
ndwateringetc.ThebalanceoftheexcavatedquantityshallberemovedbytheBiddersfromthesiteofworktoaplaceasdirectedwithle
adupto200M.andalllift.
Modeofmeasurementandpayment:
Themeasurementofexcavationintrenchesforfoundationshallbemadeaccordingtothesectionsoftrenchesshownonthedrawingo
raspersectionsgivenbytheEngineer-in-
charge.Nopaymentshallbemadeforsurplusexcavationmadeinexcessofaboverequirementsorduetosloppingandslopingbackasf
oundnecessaryonaccountofconditionsofsoil,andrequirementsofsafety.
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationboo
kletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonCmt.Basis
ProvidingandsupplyingJCBmachineonrentalbasisincaseofemergencysituationandbreakdowntypeworkandalsoduringu
navoidableconditionasperinstructionofengg.Incharge,rateincludesallnece.Shifting,fuelandoperatingchargesandstackingof
usefulandnonusefulmaterialsseparatelyuptostore.(Nopaymentshouldbeallowedfornonworkingconditionofmachineryandf
orpipelineexcavationandlayingwork)(BasedonpreviouslyapprovedratebyCEsir)
TheItemshallbecarriedasperItemmentionedintenderdocumentandasperinstructionofEngineer-in-
Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeHourdependingontheitemexecuted
Toprovidetractorwithhydraulictrolley,driverwithfuel,tocarryoutdifferentworksduringday/nightforHrs.shift.Workshallbeca
rriedoutaspertheinstructionsofengineerin-charge.Noextrachargedshallbepaidfornightshift.
TheItemshallbecarriedasperItemmentionedintenderdocumentandasperinstructionofEngineer-in-
Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeHour/Shiftdependingontheitemexecuted.
Conveyancechargeofearth,lime,murrum,buildingrubbish,manure,garbage,sludge,excavatedrock,flyash,aggregatesofa
nykindIncludingspreading&levellingetc.complete.
• LeadFrom1Kmto2Km.
• LeadFrom2Kmto3Km
• LeadFrom3Kmto4Km
• LeadFrom4Kmto5Km
• LeadFrom5Kmto10Km
• LeadFrom10Kmto15Km
• LeadFrom15Kmto25Km
Disposalofearth,lime,murrum,buildingrubbish,manure,garbage,sludge,excavatedrock,flyash,aggregatesofanykindissubjecttot
Unsuitablematerialsobtainedfromclearingsiteandexcavationshallbedisposedoffwithinaleadof200metersorasperinstructiongiv
enbyEngineerincharge.Usefulmaterialsobtainedfromclearingsiteandexcavationshallbestackedandusedwithintheworksite.Inte
rnalconveyanceabove200mtwithintheworksitei.e.FromstartingchainagetoEndchainageofagivenroadWILLNOTBEPAYABLE.Ma
terialssuitableforconstructionofEmbankment,earthenshoulderandsubgradeshallbestackedatconvenientplaceswithinaworksit
eforreuse.NoextrapaymentwillbepaidtotheBiddersforstackingofearthwithintheworksiteandreusedfortheconstructionofEmba
nkmentlayer,subgradeandearthenshoulderpurpose.Onlysurplusearthshallbedisposedoffoutsidetheworksiteasperinstructiong
ivenbyEngineer-In-
charge.Usefulstonesfromrockexcavationshallbestackednearlywithinaleadof50M.andwillbeallowedtobeusedbytheBiddersonp
aymentatrateslaiddowninthecontractorifnotsoaiddown,atscheduleofratesoftheDivisionoratamutuallyagreedratesiftherearen
osuchratesintheScheduleofrates.
Ifsurplusmaterialsarerequiredtobeconveyedoutsidetheworksitei.e.Outsideconveyancefromaparticularstretchofgivenroadwill
bepaidinthisitemasperinstructionofEngineerincharge.Nobulkageofdisposedearthwillbeconsideredforthepayment.
Therateshallbeforaunitofonecubicmeter.Item
Providing,laying,spreadingandcompactinggradedstoneaggregatetowetmixmacadamspecificationincludingpremixingtheM
aterialwithwateratOMCinmechanicalmixplantcarriageofmixedMaterialbytippertosite,layinginuniformlayersinsub-
base/basecourseonwellpreparedsurfaceandcompactingwithvibratoryrollertoachievethedesireddensityetccomplete.
Production&SupplyofWMMtositeofworksLayi
Thisworkshallconsistoflayingandcompactingclean,crushed,gradedaggregateandgranularmaterial,premixedwithwater,toaden
semassonapreparedsub-grade/sub-
base/baseorexistingpavementasthecasemaybeinaccordancewiththerequirementsoftheseSpecifications.Thematerialshallbela
idinoneormorelayersasnecessarytolines,gradesandcross-sectionsshownontheapproveddrawingsorasdirectedbytheEngineer.
ThethicknessofasinglecompactedWetMixMacadamlayershallnotbelessthan75mm.Whenvibratingorotherapprovedtypesofco
mpactingequipmentareused,thecompacteddepthofasinglelayerofthesub-
basecoursemaybeupto200mmwiththeapprovaloftheEngineer.
PhysicalRequirements
Coarseaggregatesshallbecrushedstone.TheaggregatesshallconformtothephysicalrequirementssetforthinTable17-1.
Sevaliya/Timba/Ankodiyaspecialaggregateisonlyacceptable.
Ifthewaterabsorptionvalueofthecoarseaggregateisgreaterthan2percent,thesoundnesstestshallbecarriedoutonthematerialdel
iveredtositeasperIS:2386(Part-5).
Table17-1:PhysicalRequirementsofCoarseAggregatesforWetMixMacadamforSub-base/BaseCourses
S.No. Test TestMethod Requirements
1. LosAngelesAbrasionvalueorAggregateI IS:2386(Part-4) 40percent(Max.)
IS:2386(Part- 30percent(Max.)
2. CombinedFlakinessandElongationindices(To IS:2386(Part-1) 35percent(Max.)*
*Todeterminethiscombinedproportion,theflakystonefromarepresentativesampleshouldfirstbeseparatedout.Flakinessindexisweightofflakystonemetaldivided
byweightofstonesample.Onlytheelongatedparticlesbeseparatedoutfromtheremaining(non-
flaky)stonemetal.Elongationindexisweightofelongatedparticlesdividedbytotalnon-
flakyparticles.Thevaluesofflakinessindexandelongationindexsofoundareaddedup
GradingRequirements
TheaggregatesshallconformtothegradinggiveninTable17-2.
Table17-2:GradingRequirementsofAggregatesforWetMixMacadam
ISSieveDesignation PercentbyweightpassingtheISSieve
Materialfinerthan425micronshallhavePlasticityIndex(PI)notexceeding6.
Thefinalgradationapprovedwithintheselimitsshallbegradedfromcoarsetofineandshallnotvaryfromthelowlimitononesievetoth
ehighlimitontheadjacentsieveorviceversa.
ConstructionOperations:-
PreparationofBase
Thesurfaceofthesub-grade/sub-
base/basetoreceivetheWetmixmacadamcourseshallbepreparedtothespecifiedgradeandcamberandcleanedofdust,dirtandoth
erextraneousmaterial.Anyrutsorsoftyieldingplacesshallbecorrectedinanapprovedmannerandrolleduntilfirmsurfaceisobtained
WheretheWetmixmacadamistobelaidonanexistingmetalledroad,damagedareaincludingdepressionsandpotholesshallberepair
edandmadegoodwiththesuitablematerial.Theexistingsurfaceshallbescarifiedandre-
shapedtotherequiredgradeandcamberbeforespreadingthecoarseaggregateforWetmixmacadam.
PreparationofMix
WetMixMacadamshouldbepreparedinanapprovedmixingplantofsuitablecapacityhavingprovisionforcontrolledadditionofwate
randforced/positivemixingarrangementlikepugmillorpantypemixerofconcretebatchingplant.Forsmallquantityofwetmixwork,t
heEngineermaypermitthemixingtobedoneinconcretemixers.
QuantityofwatershouldnotvaryfromOMCdeterminedasperIS:2720(partVIII)bymorethanagreedlimit.Themixedmaterialshould
beuniformlywetandnosegregationshouldbepermitted.
Immediatelyaftermixing,theaggregatesshallbespreaduniformlyandevenlyuponthepreparedsubgrade/sub-
base/baseinrequiredquantities.Innocaseshouldthesebedumpedinheapsdirectlyontheareawherethesearetobelaidnorshallthei
rhaulingoverapartlycompletedstretchbepermitted.
ThemixmaybespreadeitherbyapaverfinisherormotorgraderorasperinstructionofEngineer-in-
Chargeand/orhisauthorizedrepresentative.Forportionswheremechanicalmeanscannotbeused,manualmeansasapprovedbyth
eEngineershallbeused.Themotorgradershallbecapableofspreadingthematerialuniformlyalloverthesurface.Itsbladeshallhaveh
ydrauliccontrolsuitableforinitialadjustmentsandmaintainingthesamesoastoachievethespecifiedslopeandgrade.
Thepaverfinishershallbeself-propelled,havingthefollowingfeatures:
(i) Loadinghoppersandsuitabledistributionmechanism
(ii) Thescreedshallhavetampingandvibratingarrangementforinitialcompactiontothelayerasitisspreadwithoutruttingorotherw
isemarringthesurfaceprofile.
(iii) Thepavershallbeequippedwithnecessarycontrolmechanismsoastoensurethatthefinishedsurfaceisfreefromsurfaceblemis
Thesurfaceoftheaggregateshallbecarefullycheckedwithtemplatesandallhighorlowsportsremediedbyremovingoraddingaggre
gateasmayberequired.Thelayermaybetestedbydepthblocksduringconstruction.Nosegregationoflayerandfineparticlesshouldb
eallowed.Theaggregatesasspreadshouldbeofuniformgradationwithnopocketsoffinematerials.
Afterthemixhasbeenlaidtotherequiredthickness,gradeandcrossfall/camberthesameshallbeuniformlycompacted,tothefulldept
hwithsuitableroller.Ifthethicknessofsinglecompactedlayerdoesnotexceed100mm,smoothwheelrollerof80to100kNweightmay
beused.Foracompactedsinglelayerupto200mm,thecompactionshallbedonewiththehelpofvibratoryrollerofminimumstaticwei
ghtof80to100kNorequivalentcapacityroller.Thespeedoftherollershallnotexceed5km/h.
Inportionshavingunidirectionalcrossfall/superelevation,rollingshallcommencefromtheloweredgeandprogressgraduallytowa
rdstheupperedge.Thereafter,rollershouldprogressparalleltothecentrelineoftheroad,uniformlyover-
lappingeachprecedingtrackbyatleastonethirdwidthuntiltheentiresurfacehasbeenrolled.Alternatetripsoftherollershallbetermi
natedinstopsatleast1mawayfromanyprecedingstop.
Inportionsincamber,rollingshouldbeginattheedgewiththerollerrunningforwardandbackwarduntiltheedgeshavebeenfirmlyco
mpacted.Therollershallthenprogressgraduallytowardsthecentreparalleltothecentrelineoftheroaduniformlyoverlappingeacho
ftheprecedingtrackbyatleastone-thirdwidthuntiltheentiresurfacehasbeenrolled.
Anydisplacementoccurringasaresultofreversingofthedirectionofarollerorfromanyothercauseshallbecorrectedatonceasspecifi
edand/orremovedandmadegood.
Alongforms,kerbs,wallsorotherplacesnotaccessibletotheroller,themixtureshallbethoroughlycompactedwithmechanicaltamp
ersoraplatecompactor.Skinpatchingofanareawithoutscarifyingthesurfacetopermitproperbondingoftheaddedmaterialshallnot
Rollingshouldnotbedonewhenthesubgradeissoftoryieldingorwhenitcausesawave-likemotioninthesub-
base/basecourseorsubgrade.Ifirregularitiesdevelopduringrollingwhichexceed12mmwhentestedwitha3metrestraightedge,the
surfaceshouldbeloosenedandpremixedmaterialaddedorremovedasrequiredbeforerollingagainsoastoachieveauniformsurface
conformingtothedesiredgradeandcrossfall.Innocaseshouldtheuseofunmixedmaterialbepermittedtomakeupthedepressions.R
ollingshallbecontinuedtillthedensityachievedisatleast98percentofthemaximumdrydensityforthematerialasdeterminedbythe
methodoutlinedinIS:2720(Part-8).
Aftercompletion,thesurfaceofanyfinishedlayershallbewell-
closed,freefrommovementundercompactionequipmentoranycompactionplanes,ridges,cracksandloosematerial.Allloose,segr
egatedorotherwisedefectiveareasshallbemadegoodtothefullthicknessofthelayerandrecompacted.
Settinganddrying:
Afterfinalcompactionofwetmixmacadamcourse,theroadshallbeallowedtodryfor24hours.
OpeningtoTraffic
Preferablynovehiculartrafficofanykindshouldbeallowedonthefinishedwetmixmacadamsurfacetillithasdriedandthewearingco
SurfaceFinishandQualityControlofWorkSurface
ThesurfacefinishofconstructionshallconformtotherequirementsofClauseinItemNo.16
Qualitycontrol:
ControlonthequalityofmaterialsandworksshallbeexercisedbytheEngineerasperTable17-3.
Table17-3:TestandFrequencyforMaterialsforWetMixMacadam
TypeofConstructi Test Frequency ISCode
on (AsperCircularNo.66)
WetMixMacadam Gradation Onetestper200Cu.m. IS:2386,Part-I-1963
AggregateImpactValue Onetestper1000Cu.m. IS:2386,Part-IV
CombinedFlakinessandElongat Onetestper500Cu.m. IS:2386,Part-I
AtterbergLimitsofportionofag Onetestper200Cu.m. IS:2720,Part-V
gregatespassing
Densityofcompactedlayer Onesetofthreetestsper IS:2720,Part-VIII
RectificationofSurfaceIrregularity
Wherethesurfaceirregularityofthewetmixmacadamcourseexceedsthepermissibletolerancesorwherethecourseisotherwisedef
ectiveduetosubgradesoilgettingmixedwiththeaggregates,thefullthicknessofthelayershallbescarifiedovertheaffectedarea,resh
apedwithaddedpremixedmaterialorremovedandreplacedwithfreshpremixedmaterialasapplicableandrecompacted.Theareatr
eatedintheaforesaidmannershallnotbelessthan5mlongand2mwide.Innocaseshalldepressionsbefilledupwithunmixedandungr
adedmaterialorfines.
ArrangementforTraffic
Duringtheperiodofconstruction,arrangementsforthetrafficshallbeprovided.TheBiddersshalltakeallnecessarymeasuresforthes
afetyoftrafficduringconstructionandprovide,erectandmaintainsuchbarricades,includingsigns,marking,flags,lightsandflagmena
sperinstructionoftheEngineer-in-charge.
MeasurementsforPayment
Therateshallbeforaunitofonecubicmeter.Item
Readymixconcrete
ProvidingandlayinginpositionReadymixconcrete/batchmixconcreteofspecifiedgradeforreinforcedcementconcr
etework,usingcementcontentasperapproveddesignmix(MincementitiouslevelasperlatestIS456shallbemaintai
ned)manufacturedinfullyautomaticbatchingplantandtransportedtothesiteofworkintransitmixerforallleadhavi
ngacontinuousagitatedmixer,forreinforcedcementconcreteworkincludingpumpingfromtransitmixertositeoflay
ing;costofadmixturesinrecommendedproportionsasperIS:9103toaccelerate,retardthesettingofconcrete,impro
veworkabilitywithoutimpairingstrengthanddurability;finishing,compacting,vibrating,curing,dewatering(ifrequ
ired),etc,excludingthecostofFormworkandreinforcement,etccompleteforallelements,allfloors,alllevel,anyheig
hts/depths,anyleadandliftasdirectedbyEngineerIncharge."
ItemNO.a.ConcreteofM15grade
ItemNO.b.ConcreteofM20gradeItem
NO.c.ConcreteofM25grade
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS456andrelevantISCode&IRCCode&
GenralSpecificationbookletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonCmt.Basis.
Construction of RCC nosing in central verge using M-200 grade cement concrete. The item includes cost of
centering & shuttering, reinforcement, both side cement plaster in C:M 1:3 mortar & curing etc. complete.
Half round portion of the nosing shall be made by using mild steel.
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationboo
kletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonCmt.Basis.
ProvidingTMTBarFE500DreinforcementforR.C.C.workincludingbending,bindingandplacinginpositioncomplete
uptofloortwolevel.
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationboo
kletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
Themodeofpaymentforthisitemshallbeonkg.Basis.
Providingformworkofordinarytimberplankingsoastogivearoughfinishincludingcenteringshutteringstruttingandp
roppingetc.Heightofproppingandcenteringbelowsupportingfloortoceilingnotexceeding4
M.andremovalofthesameforinsitureinforcedconcreteandplainconcreteworkin.(A)FoundationsFootingsBasesofC
olumnsetc.andMassconcrete.
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationboo
kletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonSmt.Basis.
ProvidingandfixingFRCHeavyDuty(HD35)Manholecoverwithframe600mmx600mmor600mmdiaclearopen
ingwith100x2mmMSflatall-round,16mmøplainroundbarforliftingthecover&
shallbefittedwithplasticcups.Ontheupperperipheryofframe25x3mmwideMSflatwithhotdipgalvanizingshallbe
wellembedinconcretetoprotecttheedgesofframe.Frameshallbefixedwithcementmortarorcementconcreteaspe
rsitecondition,asperdrawingandasdirectedbyEngineerincharge.Sampleshallbeapprovedbeforeexecution.
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationboo
kletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonNo.Basis.
Providingandfixingcastironmachineholeframeofweight80to85kgsuitableforexistingEHD-
35FRCMHcover,ratealsoincl.loading,unloadingandfixingtheframeinlineandleveltomatchexistingroadlevelinC.C.1:2:4andfin
ishingsmooth,wateringandprotectingfor7daysetc.completeasperinstructionbyengg.incharge.
TheItemshallbecarriedasperItemmentionedintenderdocumentandasperinstructionofEngineer-in-
Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonKgs.BasisbasedonactualweightofMachineholeframe.
ProvidingF.R.C.MH,CPseatcoverincl.cartingtotheworksiteetc.comp.Directed.(Basedonrateofcentralstorecircular11/2023-
ItemNO.a.F.R.C.StromWaterGratingSet:-
Grating(Jali):740x740x90mmsquarejali,20:00MTloaddesign,90x2mmMSflatallround,Frame:600x600mmclearopening,oute
900x900x165mm.Ontheupperperipheryofframe25x3mmwideMSflatshouldbewellembdedinconcretetoprotecttheedgesoff
ItemNO.b.F.R.C.StromWaterGrating
Set:Grating(Jali):690x690x70mmsquarejali,20:00MTloaddesign,70x2mmMSflatallround,Frame:600x600mmclearopening,o
800x800x120mm.Ontheupperperipheryofframe25x3mmwideMSflatshouldbewellembedinconcretetoprotecttheedgesoffr
ItemNO.c.F.R.C.HeavyDuty[HD-20]Machinehole
CoversonlyforexistingC.I.framesCover:610mmØ&75mmthickcircularcover,20.00MTloaddesign,75x2mmMSflatallround,16
mmplainroundbarforliftingthecover&shouldbefittedwithplasticcups.
ItemNO.d.F.R.C.LightDuty[LD-3.00]ChamberSet:-
Cover:680x530x35mmrectangularcover,3:00MTloaddesign,35x1.2mmMSflatallround,6mmplainroundbarforliftingthecove
r&shouldbefittedwithplasticcups.Frame:outerSize-790x640x85mm.600x450mmclearopening,
ItemNO.f.(OnlyCover)F.R.C.ExtraHeavyDuty[EHD-35]MachineholeCovers&Frame-
560mmøclearopening,ThedimensionofframeandcoveraspermentionedinAmendNo.1toIS12592:2002table1
Covershallbewellcastedandhavinggoodfinishing.ItshallbemadefromM300grade.Concretewithmorethan0.5%fiberbyweightofc
oncreteasmentioninIS:12592:2002.ThreecoatsofBlackbituminous/anticorrosivepaintmustbeappliedonbacksideofcovers.Each
coverandframeshallbemarkedwithmanufacturestrademark/loadinggrade,monthandyearofmanufacturing(markingshowninIS:
12592:2002).Thecovershouldbeembossedwithchequereddesign.TransportationexpenseswillbebornebytheBidders.IS:12592:
2002shallbefollowedforProductionandTestingofFrameandcover.Thesectionalweightofconcreteofeachitemshouldbe2400to25
TherateshallbeforaunitofperSet.basis.Item
SETcoverandframe)F.R.C.HeavyDuty[HD-20]MachineholeCovers&Frames-560mmØclearopening,Thedimensionof
frameandcoveraspermentionedinAmendNo.1toIS12592:2002table1
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationbookl
etandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonSetBasis.
CartingandFixingM.H.,ChamberorCatchpiteSeatandCoverinlineandleveltomatchexisistingroadlevelinC.C.1:2:4andfinishing
smooth,wateringandprotectingfor7daysetc.completeasdirected.M.H.seatcoverwillbesuppliedbyA.M.C.(fromanystore)TheI
temshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatest
IS&IRCCode&GenralSpecificationbookletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonNo.Basis.
ConstructingBombayPatternTypeCatchPitofsize600mmx600mm&depthupto1000mmincludingexcavation,
B.B.C.C.(1:5:10),23cmsthickbrickmasonrywallintheprop.ofCM(1:6)with40mmthickIPSflooringinthepropM15atbottomand1
5mmthickcementplasterinsidethecatchpitintheproportionofCM(1:3)withoutjalietc.comp.asdirectedbyE.I.C.
600mmx600mmx1000mmDepth
FordetailedspecificationreferclauseNo.24.44.1ofR&BDepartmentbookletforGeneralTechnicalSpecificationforbuildingworks
• ExtraDepthofCatchpitsize600mmx600mmforeveryadditionaldepthof100mmorPartthereofbeyond1000mmde
pthupto1500mmdepth
FordetailedspecificationreferclauseNo.24.46ofR&BDepartmentbookletforGeneralTechnicalSpecificationforbuildingworks.
Modeofmeasurementandpayment
TheBiddersshallberesponsibleforanylossordamagetothecatchpituptotheendofwork.Heshallalsoberesponsibleforthecleaninga
llbituminousmaterialfromthecatchpit.
TherateshallbeforaunitofoneNo.
CatchPitJaliFixingP/FFRCcatchpitjaliwithframe600mmx600mmclearopeningetc.comp..AsdirectedbyEngineer-
in-Chargeand/orhisauthorizedrepresentative.
FordetailedspecificationreferclauseNo.24.35ofR&BDepartmentbookletforGeneralTechnicalSpecificationforbuildingworks.
TheBiddersshallberesponsibleforanylossordamagetothecatchpituptotheendofwork.Heshallalsoberesponsibleforthecleaninga
llbituminousmaterialfromthecatchpit.
RepairingdamagedM.H.andraisingM.H.uptoroadlevelincl.removingdamagedbrickworkandrepairingbybrickmasonryinC.M.
1:5andplasterinC.M.1:3andfixingC.I.stepsandexistingMHsheetcover,removingthedebrisfromMHandcartingthesameasdirec
(A) upto0.15mt.(@TwoCoarse)
(B) upto0.35mt.(@FourCoarse)
(C) upto0.65mt.(@SevenCoarse)
(D) upto0.90mt.(@TenCoarse)
Thisitemrelatestorepairingworkofaboveitemofmachineholewithfixingexistingseatattop&fixingpre-
castFRCcover(mediumduty)repairingupto2.00mt.depth.Thisitemrelatestorepairingexistingmachineholeof1.40x1.00or1.00x
0.75mt.sizewithremovingfirstexistingseat&coverincludingdemolishingexistingloosemasonryworkuptofromGFleveltodepthifs
pecified&uptosameheightbrickworkinCM1:5shallbecompleted&afterofthatworkplasteringworkinCM1:3shallalsobedone.Rate
includingfixingexistingornew(ifnotthere)C.I.stepsshallfixedattimeofmasonarywork.Aftercompletionofbrickwork&plasteringsa
memachineholeseat&coverfixingattop&casteditinC.C.1:2:4etc.Measurementsshallbegivenonno.ofbasisupto2.00mt.depthwo
FordetailedspecificationreferR&BDepartmentbookletforGeneralTechnicalSpecificationforbuildingworks.
Itemsalsoincludes:
1. ProperBarricadingtoavoidaccidents.
2. Removalofdebrisfromsite.
3. CompactionofBitumenbyRoller.
4. ApplyingtackcoatbeforelayingofHotmixmaterial.
ThemodeofpaymentforthisitemshallbeonNo.Basis.
RepairingdamagedI.C./RaisingremovingdamagedbrickworkandrepairingbybrickmasonryinC.M.1:5andplas
terinC.M.1:3andfixingC.I.stepsandexistingchambersheetcover,removingthedebrisfromchamberandcartingt
hesameasdirected.
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationboo
kletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonNo.Basis.
Manufacturing,Testing,Supplying,Loading,TransportingToWorkSite,Unloading,LoweringInTrenches,LayingAndJointingR.C.
C.,Np-4ClassPipesWithsocketandspigotjointsasperIS458-
2003IncludingEPDMRubberringetc.comp.AsDirectedbyengineeringincharge.
Thisshallconsistoffurnishingandinstallingreinforcedcementconcretepipeofthetypediameterandlengthrequiredatthelocations
hownonthedrawingsorasorderedbytheEngineer-incharge.
ReinforcedconcretepipeshallbeofNP-
4typeconformingtotherequirementsofIS:458andshallbeofdia.asspecifiedintheitem.Eachconsignmentofcementconcretepipes
shallbeinspectedapprovedbytheEngineer-in-
chargeeitherattheplaceofmanufactureoratthesitebeforetheirincorporationintheworks.
WherethetestingofpipeswillnotbefeasibletheBiddersswillhavetoproduceacertificatefromthe'manufactureroncompany'sletter
ProductionofsuchcertificatewillnothoweverrelievetheBiddersformhisresponsibilityofsupplyingpipesofrequiredstandardandwi
llhavetobearthelossordamagecausedtotheworkonaccountofdefectsfoundsubsequentlyduringexecution.Itwillalsobenecessar
ytopurchasethesepipesfrommanufacturerhavingstandardequipmentsforcarryingoutvarioustestsasperIS:458athisfactory.
NopipesshallbeplacedinpositionuntilthefoundationshavebeenapprovedbytheEngineer-
incharge.Wheretwoormorepipesaretobelaidadjacenttoeachother,theyshallbeseparatedbyadistanceequaltoatleasthalfthedia
meterofthepipesubjecttominimumof900mm.Thelayingofpipesonthepreparedfoundationshallstartfromtheoutletandproceedt
owardstheinletandbecompletedtothespecifiedlinesandgrades.Thepipesshallbefittedandmatchedsothatwhenlaidinworksthey
fromaculvertwithasmoothuniforminvert.AnypipefounddefectiveordamagedduringlayingshallberemovedatthecostofBidders.
ThepipesshallbejointedeitherbycollarjointorbyflushjointintheformercasethecollarsshallbeofR.C.C.150to200
mm.wideandhavingthesamestrengthasthepipestobejointed.
Caulkingspaceshallbebetween13and20mm.accordingtothediametreofthepipescaulkingmaterialshallbeslightlywetmixofceme
ntandsandintheratioof1:2rammedwithcaulkingirons.Beforecaulkingthecollarshallbesoplacedthatitscentrecoincideswiththato
fpipesandanevenannularspaceisleftbetweenthecollarandthepipes.Flushjointmaybeshapedtofromaselfcenteringjointwithajoi
ningspace13cmwide.Thejoiningspaceshallbefilledwithcementmortar1:2(1cement:2sand)mixedsufficientlydrytoremaininposit
ionwhenforcedwithatrowelorrammer.Careshallbetakentofillallvoidsandexcessmortarshallberemoved.Alljointsshallbemadewi
thcaresothattheirinteriorsurfaceissmoothandconsistentwiththeinteriorsurfaceofthepipes.Afterfinishing,thejointshallbekeptc
overedanddampforatleastfourdays.
R.C.C.pipesshallbemeasuredalongtheircentrebetweentheirinletandoutletendsinlinearmetres.
Therateforthepipesshallincludethecostofpipeincludingloading,unloading,handing,storinglayinginpositionandjoiningcomplete
Therateshallbeforaunitofonerunningmeter.
Providingandsupplying,lowering,layingandjointingISImarkonlystandardlengthstonewarepipesoffollowingclassanddiamet
erincludingalltaxes(excludingGST),insurance,transportation,freightcharges,octroi,inspectioncharges,loading,unloading,co
nveyancetodepartmentalstores,stackingetc.compl.(IS651/1989oritslatestrevision)ClassAA
(a)100mmdia(b)150mmdia(c)250mmdia.
Workshallbecarriedoutasperitemdescriptionincludingcostofalllabourandmaterialsetc.completeasdirected.Generalstandardpr
acticeofworkisapplicable.
ThemeasurementsshallbeonRMTbasis.
Providing,layingandjointingintruelineandlevelUPVCpipe(SCH-
40)offollowingdia.IncludingfittingsofstandardmakeasapprovedbyEngineer-in-charge.
Workshallbecarriedoutasperitemdescriptionincludingcostofalllabourandmaterialsetc.completeasdirected.Generalstandardpra
cticeofworkisapplicable.
ThemeasurementsshallbeonRMTbasis.
Drillingtheroadwithoutbreakingtheroadsurface(Asphalt)forlayingofcableforfeedingpowersupplybymakinguptofollowingsize
ofholesatbothendscomplete.
(B)Upto150mmboredia
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationbookl
etandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonRmt.Basis.
ConstructingSlabTypeM.H.ChamberOfTheFollowingSizeIncludingExcavation,Refilling,BrickBatsCementConcrete(1:5:10)oft
hickness15C.M.,CCChannel(1:2:4)ofthickness10C.M.,finished15mmthickcementplasterinside&outside(Onlyforshaft)InCm1
:3,FinishingWithCementSlurry,P/F4MmDiaM.S.SteelHdpeCoatedSteps35CmC/CAt35CmStaggeredMasonaryInCm1:5,RccSl
abInCc1:1.5:3ofthickness15C.M.,IncludingCantering&Reinforcement(Singlejalliat15C.M.c/cbothway10mmdia.)ButExcludin
gTheCostOfMachineholeSeatCoverEtc..CompletedOfSize0.75X1.00Meter(InsideClear,M.H.lengthshouldbeparalleltotheflo
w)M.H.Chamber(P.H.E.)SmalSize,
A) 1.00to2.00meterdepth,(SlabatGroundlevel)(forpipedia<=230mm)
B) 2.00to3.00meterdepth,(Slabatbelow0.60mt.FromG.L.)(forpipedia<=300mm)
TheItemshallbecarriedasperItemNo.59DescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificati
onbookletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonNos.Basis.
ConstructingSlabtypeM.H.Chamberofthefollowingsizeincludingexcavation,refilling,brickbatscementconcrete(1:5:10)ofthic
kness15C.M.,CCChannel(1:2:4)ofthickness10C.M.,finished15mmthickcementplasterinside&outside(Onlyforshaft)inCM1:3,
finishingwithcementslurry,P/F4mmdiaM.S.SteelHDPEcoatedsteps35cmc/cat35cmstaggeredinmasonaryCM1:5,RCCSlabinC
C1:1.5:3ofthickness23C.M.,includingCantering&reinforcement(doublejalliat15C.M.c/cbothway12mmdia.)butexcludingthe
costofMachineholeseatcoveretc..completed.ofSize1.00X
1.40meter(InsideClear,M.H.lengthshouldbeparalleltotheflow,forpipedia<=800mm)
A) 1.00to2.00meterdepth,(SlabatGroundlevel)
B) 2.00to3.00meterdepth,(Slabatbelow0.6mt.FromG.L.)Excav
Excavationforfoundationtrenchesandpitsetc.inalltypeofhardandsoftsoilsuchasmurrumsand,clay,kankaretc.andstackingthesa
mewithinaleadof30mtincl.spreading,backfillingoftrenchesandpitswithselectedexcavationmaterialfromstackwateringconsolid
ationinlayeranddisposingthesurplusmaterialwithinaleadof30mt.&withliftsasmentionedbelowincl.guarding,laightingfencingth
etrenchesandpitsetc.complete.
Thebrickbatsshallbeofnewbricks,haredwellburntandbrokento40mmnominalsize.Theseshallbefreefromearthandshallbegotap
p.use.Sandshallbeclearcoarse,sharpandfreefromearthandotherimpurities.Mixingshallbedoneonbrickorstoneplatformorofbric
kbatstomortarshallbemeasuredinheapsbybrickheightirregularmeasure.IforderedbyAddl.C.E.
Concreteshallbelaidinlayersof15cms.andwellconsolidatedmaintainedbytheBiddersforbeforecommencingthebrickwork.overbox
es,concreteshallbewellwatered.Themixshallbedoneinprop.of1:5:10.
CementshallconfirmtoM-3,sandshallconfirmtoM-6,coarseagg.shallconfirmtoM-13,watershallconfirmM1.
Theprop.ofthecementofsandcoarseagg.shallbe1:5:10i.e.1partofcement,5partofsandand10partsofcoarseagg.byvolume.andth
eworkshallbecarriedoutasperinst.ofEngineerinchargeandasperC.3.
Brickworkcementmortar:
BricksshallbetablebrickconfirmingofapprovedkilnspecificationsaslaidsownnPWDHandbookNO.2.Theseshallbewellburntandfr
eefromalldefectsandshallbegotapprovedbytheEngineerinchargebeforetheworkisstarted.
CementtobeusedformortarshallcomplywithPWDHandbookspecifications,cementmortarinthebrickworkshallbe1partofcement
,5partsofsand.EverybrickwellsackedinwaterisrequiredtobelaidIfull&closedjointsofcementmortarthethicknessofwhichshallnot
exceed1.25cms.Ifonremovalofcenteringanyopenjointshallbefound,theseshallbepointedimmediately.Specialcareshalltakento
makethefaceofbrickworksmoothbrickworkshallbetoothedorshallrackedbackincoarse.
Allintradesofcurvesshallbeworkedfromtemplestrictlymadetodimensionsasper1974-
75latestplanandsectionapprovedbyAddl.C.E.
Brickworkingeneralshallbeoffirstclassworkmanship&shallbeexecutedaccordingtotheplanworkingproperdimension&asdirecte
dbytheOfficeinchargefromtimetotime.Brickshouldbethoroughlywettedinwaterbeforeuse.Allbrickworktobecleaned&wettedb
eforelayingcementmortarshallbepreparedinspecialironpals.Andmixedbagof1.25cft.or1cft.asmeasuredasthecasemaybe.Allma
terialsshallbestackedinonesidesoasnottoobstructtrafficinanyway.Themasonryshouldbeconstructedinproperworkmanshiplike
mannerwithjointingplumbetc.toconfirmwiththegeneralspecificationNo.45PWDHandBook.Thefaceworkshouldbenearlyfinish
ed.Theshallbekeptwateredforaweekatleastthreedaysafterthedateofcompletion.
TheworkingeneralistobedoneasperPWDHandbookspecificationNo.34centeringshallnotbestruckoff&removedwithoutpermissi
onofAddl.C.E.Theextradesofthearchshallbeneatlyrenderedwith1.25cms.thickmortarofthesamequalityasinamasonry.Ifthedep
thofR.L.isnotsufficientforarchworkRCCslabof1:2:4proportionwillhavetobeprovided.TheslabshallbeasperIRCstandardaringofb
arsaroundtheopenings.Theslabshallhavetobeprovidedforthemachineholesofthedepthslessthan3mts.&wheneverrequired.Th
enightofthearchfromtheinvertshallbeasperinstructionsofAddl.C.E.
Allcenteringshallbeprepared&placesasdirected&shallbestruckoff&drawswithcaseastocausecracks&damagesthework.Bidders
shallhavetoremove&improvealldisapprovedmasonryworkeithersettledofdamagedthetopbottom&sidesoftheslabshallbeneatl
yfinishedwithcementmortarof1:4proportion.
Cementconcreteforthebottomportionofmachineholeshallconsistofonepartofcementtwopartsofsandfourpartsofblacktrapmet
alofotherapprovedmaterialof0.6to2.5cmssizefromwellgradedasperinstruction.Therateincludesallnecessarymaterialsmixinglif
tingplacingrammingwateringetc.theexposedfacestobeneatlyfinishedsmoothwithcementasperinstructions.Theconcreteworkt
okeptconstantlywateredforatleastfortnight.
Cementplaster15mmthickshallbedoneusingcementmortarof1partofcement&3partsofsandinuniformthicknesswithsurfacestre
lyinplums.TheworkingeneralshallcomplywithgeneralspecificationsforplasterNo.64inPWDhandbook.Theplastersurfacestobek
eptdampatleastforafortnight.Allinternalsidesofthemachineholesincludingsoffitofthearchshallbeprovidedwithcementplaster.
Theseshallbemadeaccuratelytoform&dimensionsshowninthedrawingcastingshallbesharpcleanfromcracksflowsairbubblescas
tingshallbecoatedwithDr.AnglesSmithsolutionbeacceptedrednotorwithanticorrosivepaint.Noormorethan1%lowerthanthewei
ghttothedimensionsinthedrawing.BiddersshallhavetosubmittwomachineholesofC.T.materialstotheAddl.C.E.forreferenceandt
hesesamplesshallbereturnedatthecompletionofthework.Allrejectedmaterialsshallbetoberemovedformthesiteofwithin24hou
rsFootstepsshallbeofthebestgreycastironasspecifiedabovetruetodimensions.Therateincludesmixingthesameinpositionasdirec
tedthewt.oftheapprovedCIfootstepsshallbe3kg.C.I.stepsshallbefixedatintervalof37cm.vertically&22cm.horizontallystartingfr
omtheinvertoftheline.TheM/sshallbeonNo.basis.
Supplyingandfixingof380mmHx300mm(or250mm)Lx200mmBKerbblockforCentralVergeinM-20gradeusing
20mmnominalsizeblacktrapaggregateofSevaliya/Timba/Ankodiyaorequivalentqualityforpre-
castblocks,reasonablyexposedfinish/formwork,mouldwithwellequippedwithvibratorysystemforkerbstonesofapproveddes
ignincludingcuring,etc.complete,includingthecostofformworketc.complete.Therateshallalsoincludenecessarycuttingofasp
halt,fixingtheKerbstonesinlineandlevelon5cmthicksandbeddingwithnecessaryequipmentsandmaterials.Therateshallalsoin
cludetheflushpointinginCM(1:3)foralljointsofthekerbstones.FillingofzarialonethesidesofthekerbstonefixedwithBituminous
concretemixedinproperpositionasdirectedbyEngineerinchangetoformaportablemixture.InanycaseGravelorsuchtypeofmat
erialsshallnotbeallowedforproduction.
Thespecifictionoffollowingmaterialsshallbeconformingwithspecificationmentionedforrelaventmaterial/itemsinGeneraltechnica
lspecificationforbuildingworkofR&BDepartmentofGujarat.
WatershallconformtoM-
Gradedstoneaggregate20mm.nominalsizetoM-10
Biddersshallhavetomanufacturetheblocksasperthedimensionsgiveninthedrawing.Specificmachineriesshallbeusedtomanufact
uretheprecastblocks.Thesemachineriesshouldbecompatibletoproduceblocksofrequiredstrengthanddimensions.Themachines
hallcontainhydraulicPressoradvancedequipmenttogeneraterequiredcompaction&Gradeandfinish.Moulds/SteelPlates/Diesof
themachineshallbedimensionallychecked&tobegotapprovedbeforecommencingtheproduction.BiddersshallprepareproperDr
yingYardforkeepingtheblocksbeforecuring.Thedryingyardshallbelevelledandcoveredsothatnoshrinkagecracksareformed.Bidd
ersshallprepareadequatesizecuringpondtocuretheblocksfornotlessthan21Days.Noothermeansofcuringshallbeallowed.Thetec
hnicalspecificationofconcreteshallconfirmtoIS456-
2000.TheconcretemixisnotrequiredtobedesignedandonlynominalmixasperIS:456-
2000shallbefollowed.Theproportionoftheconcretemixshallbe1:1.5:3(1cement:1.5coarsesand:3gradedstoneaggregate20mm.
nominalsize)byvolume.Concreteworkshallhavefairlyexposedconcretesurfaceorasspecifiedintheitem.Thedesignationordinary
25specifiedasperI.S.correspondsapproximatelyto1:3:6,1:2:4,1:1.5:3and1:1:2nominalmixofordinaryconcrete,byvolumerespec
tively.Theingredientsrequiredforordinaryconcretecontainingonebagofcementof50Kg.byweight(0.0342m3.)fordifferentpropo
rtionsofmixshallbeasperIS456-
2000.Theproportionoftheaggregateforthekerbstoneshallbemodifiedaspertheapprovaloftheengineer-in-
charge.ThewatercementratiosshallnotbemorethanthosespecifiedasperIS.Thecementofthemixshallbeincreased,ifthequantity
ofwaterinamixhastobeincreasedtoovercomethedifficultiesofplacementandcompactionsothatthewatercementratiospecifiedi
nthetableisnotexceeded.Themaximumsizeofcoarseaggregateshallbeaslargeaspossiblewithinthelimitsspecifiedbutinnocasegr
eaterthan1/4thoftheminimumthicknessofthemember,providedthattheconcretecanbeplacedwithoutdifficultysoastosurround
allreinforcementthoroughlyandtofillthecornersoftheform.Forreinforcedconcretework,coarseaggregateshavinganominalsizeo
f20mm.aregenerallyconsideredsatisfactory.AdmixtureshallbeusedinconcreteonlywithapprovaloftheEngineer-in-
chargebasedupontheevidencethatwiththepassageoftime,neitherthecompressivestrengthofconcreteisreducednorareotherre
quisitequalitiesofconcreteimpairedbytheuseofsuchadmixtures.
Proportioningshallbedonebyvolume,exceptcementwhichshallbemeasuredintermsofbagsof50kgweight.Thevolumeofonesuch
bagcanbetakenas0.0342m3.Boxesofsuitablesizesshallbeusedformeasuringsandandaggregate.Thesizeoftheboxes(internal)sha
llbe30cm.x30cm.and38cm.deep.Whilemeasuringtheaggregateandsand,thebox
shallbefilledwithoutshakingrammingorhammering.Theproportioningofsandshallbeonthebasisofitsdryvolumeandincaseofdam
psand;allowancesforbulkageshallbemade.
Forallwork,concreteshallbemixedinamechanicalmixerwhichalongwithotheraccessoriesshallbekeptinfirstclassworkingconditio
nandmaintainedthroughouttheconstruction.Measuredquantityofaggregate,sand,andcementrequiredforeachbatchshallbepo
uredintothedrumofthemechanicalmixerwhileitiscontinuouslyrunning.Afterabouthalfaminuteofdry-
mixing,measuredquantityofwaterrequiredforeachbatchofconcretemixshallbeaddedgraduallyandmixingcontinuedforanother
oneandahalfminute.Mixingshallbecontinuedtillmaterialsareuniformlydistributedanduniformcolouroftheentiremassisobtaine
dandeachindividualparticleofthecoarseaggregateshowscompletecoatingofmortarcontainingitsproportionateamountofcemen
t.Innocaseshallthemixingbedoneforlessthan2minutesafterallingredientshavebeenputintothemixer.Mixerswhichhavebeenout
ofuseformorethan30minutesshallbethoroughlycleanedbeforeputtinginanewbatch.UnlessotherwiseagreedtobytheEngineer-
charge,thefirstbatchofconcretefromthemixtureshallcontainonly2/3rdsofnormalquantityofcoarseaggregate.Mixingplantshallb
ethoroughlycleanedbeforechangingfromonetypeofcementtoanother.
Thedegreeofconsistencywhichshalldependuponthenatureoftheworkandmethodsofvibrationofconcreteshallbedeterminedby
regularslumptestsinaccordancewithIS:1199-1959.Theslumpof10mm.to25mm.shallbeadoptedwhenvibratorsareused.
AllMouldsshallbecleanedandmadefreefromstandingwater,dust,snow,oriceimmediatelybeforeplacingofconcrete.Formwork/Me
talMouldforexposedconcretesurface(Ifindicated):
Allthemouldsshallbecheckedforexactdimensionsoftheprecastblocks.Alltheedgesoftheprecastblocksshallconfirmtheprofileoft
hefinaldrawing&edges/curvaturesofthemouldsshallbecheckedaccordingly.Mouldsshallberegularlycheckedforcorrectnessofdi
mensionsofBlocks,twists,bendsduetohandling,etc.Beforestartingeverydayswork.
Careshallbetakentosetallformwork/Mouldinperfectline,level(orinrequiredcamberorslopeasspecified)andplumb.Formwork/M
ouldproppingshallbestrong,rigid,andsturdy.Theformwork/Mouldshallbeasperpattern&designshownindrawings.Formwork/M
ouldshallbedoneaccuratelyandpreciselysoastoachieveneat,cleanandsmoothconcretesurface,inline,levelandplumb.Clinks,twis
ts,offsets,warps,rivetingetc.inplatesorformsshallnotbeallowed.Beforeplacingconcrete,formsshallbethoroughlycleanedoffofal
lrust,dust,andloosematerials.Colourlessoilorgreaseofapprovedqualityshallbeappliedbeforeplacingsteel.Alsotheformworkmat
erialwillbeofwood/plywood/steeloranysortofsuchmaterial,asapprovedbytheEngineer-in-
Chargeand/orhisauthorizedrepresentative;sothatallexposedconcretesurfaceshaveuniformcolour.
Forallkindofexposedconcreteworkonlyonebrand(tobeapprovedbytheEngineer-incharge)ofcementshallbeused.
RemovalofMoulds:
Specifictimeshallbeidentifiedforremovalofmoulds,suchthattheconcreteoftheprecastblocksshallgainstrengthtowithstandthest
ressesgeneratedduetoselfweightandhandlingtodryingyardswithoutanydeformationtoshape/dimensions/edges.
Sufficienttimeshallbegiventotheblockafteritisremovedfromthemouldsothatitcangainstrengthanddryinshadetopreventanycra
cksduetoshrinkage.Thisshallbedoneindryingyards.
Curingofblockshallbedoneonlyincuringpondandcuringshallbedoneforminimum14days.
Dryingperiodafterremovingfrompond&beforedeliverytosite:Watershouldbedrainedoffromtheblockbeforeitisactuallysenttoth
esite.Timeshouldbeprovidedforproperdrainingofwaterwhichmaybepresentintheblockkeptforcuringinthepond.
Precautionshallbetakenwhiletransportingoftheblockstosite.
Theblocksshouldbeloadedandunloadedwithduecaresoastoavoidgenerationofstressesleadingtobreakingofblock.Careshouldbe
takentopreventtheblockfrombreakingduringtransporting.
Thepitsofthesize150mminwidthandrequireddepthshallfirstbeexcavated,truetolineandlevel.TherelevantspecificationsofitemA
1shallbefollowedforexcavationwork.Thepitsshallbefilledwithalayerof50mm.thicksandbedding.Thecurbsthenshallbeplacedinp
ositionofwhich50mm.shallbebelowroad.Careshouldbetakentomaintainproperlineandlevel.Thejointsbetweenthekerbsshallbe
pointedwithC.M.1:2andcuredforminimumsevendays.
Samplingandtestingofconcrete:
SamplesfromfreshconcreteshallbetakenasperIS:1199-
1959andcubesshallbemade,curedandtestedat7daysor28daysasperrequirementsinaccordancewithIS:516-
1959.Arandomsamplingprocedureshallbeadoptedtoensurethateachconcretebatchshallhaveareasonablechanceofbeingtested
i.e.thesamplingshouldbespreadovertheentireperiodofconcretingandcoverallmixingunits.
Atleast1sampleshallbetakenfromeachshift.Tentestspecimensshallbemadefromeachsample,5fortestingat7days,andtheremain
ing5at28days.Thesamplesofconcreteshallbetakenoneachdayoftheconcretingasperabovefrequency.Thenumberofspecimens
maybesuitablyincreasedasdeemednecessarybytheEngineer-in-
chargewhenprocedureoftestsgivenaboverevealsapoorqualityofconcreteandinotherspecialcases.Theaveragestrengthofthegro
upofcubescastforeachdayshallnotbelessthanthespecifiedcubestrengthof200Kg/cm2at28days.20%ofthecubescastforeachday
mayhavevaluelessthanthespecifiedstrengthprovidedthelowestvalueisnotlessthan85%ofthespecifiedstrength.Iftheconcretem
adeinaccordancewiththeproportionsgivenforaparticulargrade,doesnotyieldthespecifiedstrength,suchconcreteshallbeclassifie
dasbelongingtotheappropriatelowergrade.Concretemadeinaccordancewiththeproportionsgivenforaparticulargradeshallnot,
however,beplacedinahighergradeonthegroundthattheteststrengtharehigherthantheminimumspecified.Ifrockpockets/honey
combsintheopinionofEngineer-in-
chargeareofsuchanextentorcharactersoastoaffectthestrengthofthestructure,materiallyortoendangerthelifeofthesteelreinfor
cement,hemaydeclaretheconcretedefectiveandrequiretheremovalandreplacementoftheportionofthestructureaffected.
PrecastKerbStones:
Therelevantspecificationsofconcretingasperitemaboveshallbefollowedexceptthatworkshallbecarriedoutforprecastconcretek
erbstonesasspecifiedintheitem.AllPrecastmembersshallbecastatworkshop.Sufficientcuringshallbedonebeforeplacementofth
esamethemethodoftransportingandplacingtheprecastmembersshallbeasapprovedbytheEngineer-in-
charge.Membersshallbesotransportedthatnobreakageorunduestressesareinducedinthem.Ifrequired,allmembersshallhaveak
eyprovidedonboththefacesi.etopandbottomsurfaces,ofadequatesizesoastofillthesamewithconcretewhilelaying.Thefunctiono
fthiskeyistoavoidtheleakagethroughthejointbetweentheprecastmemberandthememberonwhichitislaid.
ModeofMeasurementsandPayment:
Therateshallincludecostofformworkandcostofreinforcement.ThevolumeoccupiedbyreinforcementshallnotbedeductedfromR.
TherateshallbeforaunitofRmt.
Supplyingandfixingof300mm(or250mm)-Lx150mm-Bx380mm-HKerbblockforFootpathinM-
20gradeusing20mmnominalsizeblacktrapaggregateofSevaliya/Timba/Ankodiyaorequivalentqualityforpre-
castblocks,reasonablyexposedfinish/formwork,mouldwithwellequippedwithvibratorysystemforkerbstonesofapproveddes
ignincludingcuring,etc.complete,includingthecostofformworketc.complete.Therateshallalsoincludenecessarycuttingofasp
halt,fixingtheKerbstonesinlineandlevelon5cmthicksandbeddingwithnecessaryequipmentsandmaterials.Therateshallalsoin
cludetheflushpointinginCM(1:3)foralljointsofthekerbstones.FillingofzarialonethesidesofthekerbstonefixedwithBituminous
concretemixedinproperpositionasdirectedbyEngineerinchangetoformaportablemixture.InanycaseGravelorsuchtypeofmat
erialsshallnotbeallowedforproduction.
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationboo
kletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonRmt.Basis.
PrecastconcretekerbProvidingandfixingM25Gradeofconcreteprecastexposed/Fairfinish/texturefinishkerbstonesofapprove
dmakeasperapprovedsampleofanysizeandanytype.Kerbsshallbefixedonthefoundationpreparedasperapproveddesign.Ther
ateshallalsoincludeforerectingandfixingthepiecesinpositionforcompletekerbsystemwithchamferedtypeofkerbsincludingne
cessaryaccessoriesofkerblikeradiuskerb,anglesandquadrantkerbs,dropletkerbsetc.completeasperdrawing.Kerbshallbefixe
daspaperjointwithoutanyjointingmaterial.
Howevercementmortarshallbeprovidedatthebacksideofkerbstonejoint.(Samplemustbeapproved)Costofexcavation,cutting,b
ase,sidefillingshallincludesasdirectedengineer-inchargeinaboveitemdescriptionasperBOQ
(a) 450mmhighmediankerb
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationbookl
etandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonRmt.Basis.
PrecastconcretekerbProvidingandfixingM25Gradeofconcreteprecastexposed/Fairfinish/texturefinishkerbstonesofapprove
dmakeasperapprovedsampleofanysizeandanytype.Kerbsshallbefixedonthefoundationpreparedasperapproveddesign.Ther
ateshallalsoincludeforerectingandfixingthepiecesinpositionforcompletekerbsystemwithchamferedtypeofkerbsincludingne
cessaryaccessoriesofkerblikeradiuskerbs,anglesandquadrantkerbs,dropletkerbsetc.completeasperdrawing.Kerbshallbefix
edaspaperjointwithoutanyjointingmaterial.Howevercementmortarshallbeprovidedatthebacksideofkerbstonejoint.(Sampl
emustbeapproved)Costofexcavation,cutting,base,sidefillingshallincludesasdirectedengineer-
inchargeinaboveitemdescriptionasperBOQ
(b) 375mmhighFootpathkerb
Material:(1)WatershallconformtoM-1.(2)CementshallconformtoM-
3.(3)SandshallconformtoM-6.(4)StoneaggregateshallconformtoM-
12(5)Precastkerbshallbeofapprovedmakeandasperapprovedsample.
1.0Workmanship:
AllPrecastexposed/farefinish/texturefinishkerbstonesshallbeofapprovedmake.Sufficientcuringshallbedonebeforeplacem
ThemethodoftransportingandplacingtheprecastmembersshallbeasapprovedbytheArchitectandEngineer-in-
charge.Membersshallbesotransportedthatnobreakageorunduestressesareinducedinthem.
Thepitsofthesize0.15Minwidthand0.23M.indepthoraspersiteconditionshallfirstbeexcavated,truetolineandlevel.Thespecifi
cationsforexcavationshallbefollowedasperrelevantitem.
Thepitsshallbefilledwithalayerof0.15M.thickleanconcreteM15.ThekerbsshallbelaidonexistingPCCbaseintruelineandplumb
.ThespecificationsforPCCworkshallbefollowedasperrelevantitem.
TherateshallalsoincludeforerectingandfixingthepiecesinpositionforcompleteKerbsystemswithChamferedtypeofkerbsinclu
dingalltypeofnecessaryaccessoriesofkerblikeRadiusKerbs,AnglesandQuadrantKerbs,inletkerbetccompleteasperdraw
TherateshallalsoincludetheflushpointinginCM(1:2)foralljointsofthekerbstones.
ModeofMeasurement&Payment:
Therateshallincludethecostofmaterialandlabourforfixingthekerbsystemincludinglaying,jointingandfinishingbutexcludingthec
ostofexcavation,bitumencutting,basePCC,zarifillingwithbitumenmaterial
TheMeasurementoftheitemshallbeinRmtbasis.
Labourworkforfixinginterlockingblocks/anykindofpavementonupto50mmthsandbedding,levelling,wateringandfixinginline&l
evelaswellcleaningthesiteetc.comp.asdirected.
Workshallbecarriedoutasperitemdescriptionincludingcostofalllabourandmaterialsetc.completeasdirected.General
standardpracticeoflayingofpaverblockisapplicable.ThemeasurementsshallbeonSMTbasis.
ProvidingandlayingshotblastedNon-
interlocking,Paverblocksofspecifiedthickness,size,gradeofconcreteandcolourmachinemadeandblastingbyautomaticshotbl
astingmachineandhighdensityofasperapprovedsampleofapprovedmakeforfootpath,parkingareas,servicelanes,crossovera
ndotherareasasmentionedinthedrawing.Includingprovidingandlaying50mmthickaveravebeddinglayerofcoarsesandbelowp
averblockasperrequiredgradingandspecification.Laidpaverblockshallbemechanicallycompacted.Theworkofthepavingblock
sshallbeexecutedinlineandlevelbyskilledmasonofflooringworkonly.Smallsizeofpaverblockwithsamespecificationshallbeus
edatresidueoratend.Itshouldbelaidinsuchawaythatthenocuttingofthepaverblocktobenecessary.Ifcuttingofpaverblockshall
berequired,thancutbymachineonlyandlayingtobedonebyskilledflooringmason.Thefinishedsurfaceofthepaverblockshallhav
ecoarsesandTextureFinish.Paveblocksshallbecompactedandshallbere-
laidifnecessary.Actuallaidareashallbemeasuredandpaidwithoutanywastage.(A)60mmthickM-
35gradeGreyPaverblockofsize200mmx200mm.
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificationboo
kletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonSmt.Basis
Paver Block80 mm thickProviding and laying shot blasted Non - interlocking, Paver blocks of specified thickness, size, grade
of concrete and colour machine made and blastingbyautomatic shotblasting machine and high density of as per approved
sample of approved make for footpath, parkingareas, service lanes,cross over and other areas as mentioned in the drawing.
Including providing and laying 50 mm thick averave bedding layer of coarse sand below paver block as per required grading
and specification. Laid paver block shall be mechanicallycompacted. The work ofthe paving blocks shall be executed inline
and levelbyskilled masonof flooring work only. Smallsize of paver block with same specification shall be used at residue or
at end. It should be laid in such a way that the no cutting of the paver block to be necessary. If cuttingofpaverblockshallbe
required,thancutbymachineonlyandlayingto bedonebyskilled flooring mason.Thefinished surfaceofthepaverblockshall have
coarse sand Texture Finish. Pave blocks shall be compacted and shall be re-laid if necessary. Actual laid area shall be
measured and paid without any wastage. (A) 80 mm thick M-35 grade Grey Paver block of size 200mm x 200mm. As per
approved rate (Law garden Incuding Labour Cess)
Thescopeofwork:ItincludessupplyingandlayingofPrecastshotblastedbyautomaticshotblastingmachineinfactory(notonsite)pav
erblocksatfootpath,parkingarea,servicelaneandotherareas.
Theworkincludes:
Paverblockshouldbelaidoverpreparedsubgrade.
Clearingthesitebyremovingallobstaclessuchasstones,debrisetc.forlayingofpaverblocks.
Manufacturingofpaverblocksbyoneoftheapprovedsuppliersasperrequirementsintechnicalspecificationenclosed.
Supplyingofpaverblocksatsite,includinghandlingatbothends.Thetypeofpaverblockmaybeinterlockingornon-interlocking.
Providingandlayingaverage50mmcoarsesandbeddingforlayingblocks.
Layingofpaverblocksatsiteasperrequirementintechnicalspecification,withinshortestpossibletime.
TestingofpaverblocksthroughreputedGovt./NonGovt.TesthouseandsubmissionoftestresultsasperrequirementsinTechnica
lSpecifications.Clientreservestherighttocarryouttestatrandom.CostforsuchteststobebornebyBidders.
TheBiddersshallguaranteethatallmaterialandcomponentsdesigned,fabricated,suppliedandlaidbyhimshallbefreefromanytype
ofdefectduetofaultymaterialand/orworkmanship/erectionforaperiodoffiveyearfromthedateofcompletionofworkatindividual
sites.However,theBiddersforfiveyearsshallrenderfreemaintenance.
TechnicalSpecifications:
PaverBlockManufacturingFacilities:
ThePaverBlockshallbemadeinfactorywithfollowingminimumfacilities:
ConcreteBlockmakingMachines:
ThemachineshouldbecapableofproducinghighqualityPaverBlocksbyobtaininghighlevelofcompactionbyapplicationofhydraulic
compactionandalsobyhighintensityvibrationtothemoulds.Themachineshouldhaveautomaticcontrolpanelforuniformityinstren
ConcreteBatching&MixingPlant:(Notessential)TheconcreteMixDesignshouldbefollowedforeachbatchofmaterials.Theconcret
eingredientshouldbemixedinconcreteBatching&Mixingplantwithminimumcapacityof30cum/hour.Theplantshouldbeequippe
dwithautomaticcontrolpanelformaintainingwatercementratiofrombatchtobatchtoobtainconcreteofuniformqualityandstreng
Theplantshouldbeequippedwithadequatemechanismformechanizedloadingofrawmaterialsintomixerandconveyorbeltfortran
sportationofconcretefrommixertoconcreteblockmakingmachinetomaintainqualityofwetcement.
Thefactoryshouldhavewelldesignedcuringareatoensureadequatecuringofpaverblocks.Steamcuringfacilityofthepaverblocksispre
Laboratory(Desirablebutnotessential):
Thefactoryshouldhavethefollowing:
Compressiontestingmachineofadequatecapacity.
Othertoolsandequipmentfortestingrawmaterialsandpaverblocks.
(1) Systematicrecordoftestresultsofvariouspaverblocksmanufacturedinthefactory.
(2) ConcreteMixDesignforvariousgradeofconcreteusedformakingofpaverblocks.
SpecificationsforColouredPaverBlocks:
ColourconcretepaverblocksshallbemanufacturedasperattachedspecificationsusingapprovedcolourPigmentofironoxideofappr
ovedbrandlikeBayer,Tataetc.withminimumcolourpigmentof3%byweightofcement.ThecolourshadeshallbeasselectedbyArchit
ectbeforecommencementofthework.Thejobalsoincludesproviding50mmthicksandbeddingtomatchtheshadeofthepaverblock.
Thecolourofthepaverblockshallbeguaranteedagainstfadingofcolourforperiodof12monthsfromthedateoflayingofthesameatsit
Allothertechnicalspecifications&Procedurefortesting,laying&samplingofColorpaverswillbeasperattachment.
PaverBlockCharacteristics:
Theconcretepaversshouldhaveperpendicularitiesafterreleasefromthemouldandthesameshouldberetaineduntilthelaying.
Thesurfaceshouldbereasonablysmoothandofantiskidandantiglaretype.Thepavershouldhaveuniformchamferstofacilitateeasydr
ainagesurfacerunoff.
Thepaversshouldhaveuniforminterlockingspaceof2mmto3mmtoensurecompactedsandfillingaftervibrationonthepaverSurface.
Theconcretemixdesignshouldbefollowedforeachbatchofmaterialsseparatelyandautomaticbatchingplantistobeusedtoachieve
uniformityinstrengthandquality.
ThepaversshallbemanufacturedinDoublelayeronly.
Skilledlabourshouldbeemployedforlayingblockstoensurelineandleveloflaying,desiredshapeofthesurfaceandadequatecompactio
nofthesandinthejoints.
PaverBlockDimensions:
Layers Doublelayered,toplayerminimum8to10mm
Irregular(UniformShapewithnoHollowOrCracks)/asperdrawingCham
fer 4mmto6mmalongtopedges
NaturalcementgreyColourwithoutuseofanypigment.For
Colourpaversrefer“specificationsforColourpavers”
Dimensional (+/-
)2mmforlength&width,Tolerance (+/-
)3mmforHeight(Thickness)
TestingofPaverBlocks:
*Samplingandtestingprocedureasperenclosedspecifications
Sampling&TestingProceduresforPaverBlocks:
INTERNAL–Averageofminimum3samplesper10000Blocksforcompressivestrengthandwaterabsorption.EXTERNAL–
Minimum2Blocksper10000blocksforabrasionandflexure.
SamplingForTesting:SamplingfortestingofpaverblocksshallbedoneinaccordancewithAppendix-A.
CompressiveStrength:TestingforcompressivestrengthshallbeundertakeninaccordancewithAppendix-
B.Theaveragecompressivestrengthoftheblockstestedshallbe30/40N/Sq.mmasperthickness.
AbrasionResistance:TestingforabrasionshallbeinaccordancewithIS1237(SpecificationsforCementConcreteFloorTiles).
FlexuralStrength:TestingforflexuralshallbeinaccordancewithIS1237(SpecificationsforCementConcreteFloorTiles).WaterAbsorpt
ion:TestingforwaterabsorptionshallbeinaccordancewithIS2185:1979:PartI(SpecificationsforConcreteMasonryUnits).
Methodofsampling:Beforelayingpaverblocks,eachdesignatedsectioncomprisingnotmorethan10000blocks,shallbedividedinto
fiveapproximatelyequalgroups.Oneblockshallbedrawnfromeachgroupi.e.3forinternaltestingand2forexternaltesting.
Markingandidentification:Allsamplesshallbeclearlymarkedatthetimeofsamplinginsuchawaythatthedesignatedsectionsofpart
thereof,andtheconsignmentrepresentedbythesample,areclearlydefined.Thesampleshallbedispatchedtotheapprovedtestlabo
ratorytakingprecautiontoavoiddamagetothepavingintransit.Protectthepavingfromdamageandcontaminationuntiltheyhavebe
entested.Thetestingshallbecarriedassoonaspossible,afterthesamplehasbeentaken.Assoonaspracticableaftersampling.Thesa
mplesshallbestoredinwaterat20degree Cfor24hourspriortotesting.
SR.NO. *TEST SPECIFICATIONAverageValues
(AverageofMinimumFiveSamples/Site)
1. CompressiveStrength
Min.30N/Sq.mmfor60mmthickandMin.40N/Sq.m
2. FlexuralStrength Minimum3.80N/Sq.mmand4.5N/Sq.mmfor60and80
mmthickpaverblockrespectively.
3. AbrasionResistance Maximum1.5
4. WaterAbsorption Maximum5.80%
5. MinimumCementContent 380Kg/CumforM30concreteand430Kg/CumforM40concrete
Sampling&TestingProceduresforPaverBlocks:
INTERNAL–Averageofminimum3samplesper10000Blocksforcompressivestrengthandwaterabsorption.EXTERNAL–
Minimum2Blocksper10000blocksforabrasionandflexure.
SamplingForTesting:SamplingfortestingofpaverblocksshallbedoneinaccordancewithAppendix-A.
CompressiveStrength:TestingforcompressivestrengthshallbeundertakeninaccordancewithAppendix-
B.Theaveragecompressivestrengthoftheblockstestedshallbe30/40N/Sq.mmasperthickness.
AbrasionResistance:TestingforabrasionshallbeinaccordancewithIS1237(SpecificationsforCementConcreteFloorTiles).
FlexuralStrength:TestingforflexuralshallbeinaccordancewithIS1237(SpecificationsforCementConcreteFloorTiles).
WaterAbsorption:TestingforwaterabsorptionshallbeinaccordancewithIS2185:1979:PartI(SpecificationsforConcreteMasonry
Methodofsampling:Beforelayingpaverblocks,eachdesignatedsectioncomprisingnotmorethan10000blocks,shallbedividedinto
fiveapproximatelyequalgroups.Oneblockshallbedrawnfromeachgroupi.e.3forinternaltestingand2forexternaltesting.
Markingandidentification:Allsamplesshallbeclearlymarkedatthetimeofsamplinginsuchawaythatthedesignatedsectionsofpart
thereof,andtheconsignmentrepresentedbythesample,areclearlydefined.
Thesampleshallbedispatchedtotheapprovedtestlaboratorytakingprecautiontoavoiddamagetothepavingintransit.Protectthepavingfr
omdamageandcontaminationuntiltheyhavebeentested.Thetestingshallbecarriedassoonaspossible,afterthesamplehasbeentaken.As
soonaspracticableaftersampling.Thesamplesshallbestoredinwaterat20degreeC5degreeCfor24hourspriortotesting.
TestForCompressiveStrength:
TestingMachine:Thetestingmachineshallbeofsuitablecapacityforthetestandcapableofapplyingtheloadoftheratespecified.Itsh
allcomply,asregardsrepeatabilityandaccuracy,withtherequirementsofclause2.1ofBS:1881-Part4.
Procedure:Thesamplespecimenshallbetestedinawetconditionafterbeingstoredforatleast24hoursinwatermaintainedatatemp
eratureof20 C+or–5 C.Beforethespecimensaresubmergedinwater,thenecessaryareashallbedetermined.
Theplatesfortestingmachinesshallbewipedcleanandanyloosegritorothermaterialremovedfromthecontactfacesofthespecimen
.Plywood,nominally4mmthickshallbeusedaspackingbetweentheupperandlowerfacesofthespecimenandthemachineplatesand
theseboardsshallbelargerthanthespecimenbythemarginofatleast5mm
atallpoints.FreshPackingshallbeusedforeveryspecimentested.
Thespecimenshallbeplacedinthemachinewiththewearingsurfaceinthehorizontalplaneandinsuchawaythattheaxesofthespecim
enarealignedwiththoseofthemachineplates.
Theloadshallbeappliedwithoutshockandincreasedcontinuouslyattherateofapproximately15N/Sq.mmperminuteuntilnogreaterl
oadcanbesustained.Themaximumloadappliedtothespecimenshallberecorded.
CalculationofcorrectedstrengthforindividualBlocks:Thecompressivestrengthofeachblockspecimenshallbecalculatedbydividi
ngthemaximumloadbyfullcrosssectionareaoftheblockandmultiplyingwithanappropriatefactorof:-
a) For100mmthickblocks–1.24
b) For80mmthickblocks–1.18
c) For60mmthickblocks–1.06
CompressiveStrengthCalculation:Theaveragecorrectedcompressivestrengthforthedesignedblocksectionshallbecalculated.
4.0Methodoflaying:
Blocksshallbeplacedonthesandbeddingetc.whichwerewellrammedsoastoactasfirmbed.Blocksshallbelaidinsuchmannerthatno
gapshallbeleftinbetween.Blockssolaidshallbecompactedbymeansofmechanicalcompactororequivalentcompactingmethodso
astoobtainrequiredfinishedsurface.Allthejointsshallbematchedandifanymanufacturingdefectisdetectedthelotshallbereplaced
andrelayingshallbedonewithoutanyextracostuptosatisfactionofEngineerincharge.
50to80mmthickcoarsesandshallbelaidascushioninglayerforarrangingthepaverblocks.Jointsofthepaverblocksshallbefilledwitht
Thepaverblocksshallbelaidproperlyonthepreparedsub-baseaspermanufacturer'sspecificationandasperArchitectandEngineer-
in-charge'sinstruction.
Paverblockshallbelaidbytheapprovedagencyonly.Ifmanufacturerofthepaverblockprovidingthelayingservices,thenitshallbelaid
throughthesupplyingagencyonly.Thelabourersforpaverblockfixingshallbeskilledflooringmasononly.Onlycuttingtoolshallbeuse
dforcuttingthepaverblock.Fulldepthcuttingtollshallbeusedforproperfinishedsurfaceaftercutting.Manualcuttingorbreakingoft
hepaverblockisnotpermitted.
Afterlayingofthepaverblockfinesandshallbespreadoveritandpaverblockshallbecompactedwithmechanicalcompactor.Anysettl
ementorundulationinthelaidareashallberepairedimmediately.
5.0ModeofMeasurementandpayment:
Measurementshallbedoneasperactualarealaidwithoutconsideringanywastage.
TheMeasurementoftheitemshallbeinSqmtbasis.
Providingandlayingcementconcretetactileflagstone(forvisionimpairedpersonsasperstandards)ofsize300x300x60m
mthickofapprovedmakeandpatternhavingwaterabsorptionnotover6%andconformingtoIS:
13801:1993,ofapprovedmake,patternandshade(withUVlightresistantcoloursfromLanxessonly)inoutdoorfloorssuc
hasfootpath,plaza,multimodalslocationetc.,laidon40mmthickbaseofcementmortar1:4(1cement:4coarsesand)inall
shapes&patternsincludinggroutingthejointswithwhitecementmixedwithmatchingpigments,curing,finishingetc.co
mpleteasperdirectionofEngineer-in-Charge.SampleshallbeapprovedbyEngineerincharge.LawGardenRate)
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecific
ationbookletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonSmt.Basis
ProvidingandfixingTreeGuardwithgreyexposedfinishingradeM-
20withnominalsteelandwallthicknessof100mm.(ApprovedExtraItemRate)
ItemNO.a.OuterSize700X7
00ItemNO.b.OuterSize900
TheItemshallbecarriedasperItemDescriptionintenderdocumentandasPerprevailinglatestIS&IRCCode&GenralSpecificati
onbookletandAsperinstructionofEngineer-in-Chargeand/orhisauthorizedrepresentative.
ThemodeofpaymentforthisitemshallbeonNo.Basis
Providing and laying cement concrete 1:4:8 (1-Cement : 4- coarse sand : 8- hand broken stone aggregates
mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth
The mode of payment for this item shall be on Cmt Basis
Providing and laying cement concrete 1:5:10 (1- Cement : 5- Coarse sand : 10- hand broken stone aggregates
40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth
The mode of payment for this item shall be on Cmt Basis
Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- Graded brick bat aggregate 40mm normal
size) and curing complete excluding cost of formwork in (A) Foundation and Plinth
The mode of payment for this item shall be on Cmt Basis
Making 15 mm groove in RCC work on road and filling it with polysulfied selant and finished it good incl.all labour
charges etc comp as directed.
The mode of payment for this item shall be on Rmt Basis
Providing & Applying Tri mix with Machine floater machine on constructed RCC work including Machine & Labour etc
Comp as directed
The mode of payment for this item shall be on Smt Basis
Supplying electric breaker machine for RCC slab or asphalt demolishing work on site by using operator, fuel, power
supply etc.complete as directed. (no payment should be allowed for non working condition of machinery and for pipe
line excavation and M.H. work. Allowed only for break down work) (Based on Previously approved rate by CE sir )
The mode of payment for this item shall be on Shift Basis
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as mentioned in the drawing / instruction of engineer in
charge. Cost includes formworks using rubber mould, Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be mechanically compacted. The work of paving blocks shall be
executed in line and level by skill mason of flooring work only. It should be laid in such a way that the no cutting
of the paver block to be necessary. if cutting of paver block necessary then it should be cut by machine only
and carting. The finished surface of the paver block shall have resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel or such type of materials shall not be allowed for production.
Laying on 5cms thick sand beddding.
The mode of payment for this item shall be on Smt Basis
Supplying, labour for break down repairing work for activities like excavation, disliting, removing debris from trench
back filling etc. comp. as directed by Eng.in charge.
The mode of payment for this item shall be on No. Basis
Excavation for pipe line trenches for water supply, sewerage lne, manhole etc. all with shoring and struting if required
as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up
to all required lead cleaning the site etc. complete for all lifts and strata as specified. (GWSSB SOR 2021-22)
The mode of payment for this item shall be on Cmt. Basis
Providing , Supplying and using size 15 to 50 mm dia. Pvc mm Pipe line Up To 1 Mtr.Length.With Matirials like Pipe,
Coupler, Union, Elbow, TEE, End-Cap, Band, F.T, M.T, Tailpiece, Reducer, M-Seal, Solution, Excavation per day per
ward including Labor and Fitter To PreventLeakage etc.As per instuction of Engineer incharge.Excavation. including
Labor and Fitter.
The mode of payment for this item shall be on No. Basis
Providing , Supplying and using Of up to 50 mm To 75 mm dia.Pve Pipe line For Braking Connection Up to 1Mtr Length
With Matirials like Pipe, Coupler, Union, Elbow, TEE, End-Cap, Band F.T, M.T, Tailpiece, Reducer, M-Seal, Solution,
Excavation per day per ward including Labor and Fitter To Prevent Leakage etc.As per instuction of Engineer incharge.
Excavation. including Labor and Fitter..
The mode of payment for this item shall be on No. Basis
Seal and Signature of the Bidder Add.City Engineer(west zone.)
Ahmedabad Municipal Corporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – œrûtK vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj
fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb
<&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu
mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk
ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh
fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe
mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2 mraJtjg ,dtk^eldh
<t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo &tg <u mwrlµ< fhJtlwk hnNu.
16. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe
fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 135.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .