| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.6 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹33.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹33.6 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹33.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹33.6 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹33.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹33.6 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹33.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹33.6 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹33.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33.7 L
EMD Value
₹33,700
Closing Date
14 Aug 2026, 5:30 pmClosed
Superintending Engineer
O/o the SE, Nuapada Irrigation Division
Slope protection of Kharkhara nallah D/S bridge from RD 632m to 800m of village Chanabeda for the year 2026-27
2026_CEBMT_137942_4
e-Procurement Notice No- (NID)01/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Nuapada
Please refer tender documents.
2 documents required · 2 mandatory
₹6,000
₹33,700
Yes
21 Sept 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
4 Aug 2026 - 14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation in all kind of soil including hard muroom, stony earth mixed with boulder (except sheet rock and boulder required blasting,) with all leads,lifts&delfts including dressing and levelling the bed and slope and diposite the excavated materials at place away from the work site with including cost of all labour & dewatering if required and T&P required for work etc complete as per direction for the Engineer-in-charge. | 318.6 | One Cum | 276.7 | ₹88,156.62 |
| 2 | Collecting conveying & stacking of good quality of sand from approved quarry to the work site and spreding the same on finish surface, foundation base of C.C. protection wall including all cost, conveyance, royalty & taxes of all materials complete with all labour charges, T&P required for the work with all leads, lifts & delfts etc complete as per direction of Engineer-in-charge. | 31.86 | One Cum | 594 | ₹18,924.84 |
| 3 | Cement concrete M-15 with 40mm down graded crusher broken metal of approved quality free from weathered skin surface & any other deleterious materials having uniform colour & texture for concrete protection wall including cost, conveyance, royalty & all other taxes of all materials to the site of work, T&P finished with all leads, lifts, delifts, watering & curing etc. complete with cost of all labour etc. complete as per direction of Engineer-in-charge. | 47.79 | One Cum | 4,914.5 | ₹2,34,863.96 |
| 4 | RCC work of M-15 with 20mm down graded crusher broken chips of approved quality free from weathered skin surface & any other deleterious materials having uniform colour & texture for C.C. protection wall including reinforcement including cost, conveyance, royalty & all other taxes of all materials to the site of work, T&P finished with all leads, lifts, delifts, watering & curing incl. cost of all labour etc. complete as per direction of Engineer-in-charge. | 318.32 | One Cum | 5,285.4 | ₹16,82,448.53 |
| 5 | Supply,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost , conveyance of all materials and T&P complete as directed by the Engineer-in-charge.Unit-1 MT ,Taking output-1 MT | 69.09 | One Qntl | 9,317.4 | ₹6,43,739.17 |
| 6 | Providing weep holes in brick masonry/plain/reinforced concrete abutment, wing wall/return wall with 100mm dia AC pipes extending through full width of the structure with slope of 1V:20H as per design & drawing including all cost, conveyance & royalty etc complete with all labour & T&P required for the work an as per direction of the Engineer-in-charge. | 35.4 | One RM | 110.8 | ₹3,922.32 |
| 7 | Providing form work for concrete with F1 finish for guardwall with steel shutter rigidly fixed and removal of forms and making good to the surfaces where necessary complete including all leads, lifts and delifts with all labour, materials and T&P complete as directed by the Engineer-in-charge(vide item No. 37, Page-35 of A.R. 2006) | 755.4 | One Sqm | 630.2 | ₹4,76,053.08 |
| 8 | Filling in foundation and plinth with excavated earth well watered and rammed in 23.50cm thick in layers with all leads, lift & delift, T&P required for the works and all labour etc. complete as directed by the Engineer-in-charge. | 106.2 | One Cum | 157.2 | ₹16,694.64 |
| 9 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within lead of 5 km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the direction of Engineer-in-charge.(Measurement of the fill to be taken on the finished compacted section under PRR condition) | 922.5 | One Cum | 218.3 | ₹2,01,381.75 |
stage.html
html • 0.18 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.46 MB
4.pdf
Tender Documents • 1.18 MB
BOQ_604696.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .