Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.5 L+₹1.6 L (7.08%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹25.1 L+₹2.2 L (9.65%)Rejected-AOC FLAT NO 827 NEW YASHODA PUBLIC SCHOOL URBAN ESTATE 2 HISAR | HISAR | HISAR | HARYANA | L3 | Rejected-AOC L3 | |
| 4 | L4₹25.8 L+₹2.9 L (12.5%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹20.0 L
EMD Value
₹39,980
Closing Date
16 Apr 2020, 1:00 pmClosed
Executive Engineer
Executive Engineer Gohana W/S Division Gohana
Making boundary wall of Canal Rest House Rana Kheri
2020_HRY_125561_6
3519/15A dt 20/03/2020
Open Tender
Civil Works - Buildings
Works
75 days
GOHANA W.S Division Gohana
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
Executive Engineer Gohana W.S. Divn. Gohana
₹39,980
Yes
16 Jun 2021
3 Apr 2020
16 Apr 2020
4 Apr 2020
16 Apr 2020
4 Apr 2020
Amount
Earth work excavtion for cutting in foundation and plinth (HSR 6.6) @ Rs.1108.10+425%=5817.52 Per 100 Cum
Shuttering for faces of Concrete In foundation & plinth HSR item 9.13 @ Rs. 30.65+400%=153.25/ Sqm
Laying C.C 1:4:8 with stone ballast 40 mm nominal size in foundation and plinth HSR item no.10.39)@ Rs 403.10.+450%=2217.05per Cum
Fe 500 EQR Steel bars for RCC work where not included the complete rate of RCC i/c bending ,binding &placing in position complete (HSR 18.22)@Rs. 927.05+500%=5562.30 per Qtl
Rough iron & mild steel using angles flat bars tee & channels HSR 18.10 @ Rs. 1197.45+500%=7184.70 per Qtl
Laying RCC 1:2:4 in foundation and plinth 20 mm nominal size i/c centering & Shuttering HSR item no.10.80@ Rs. 632.05+450%=3476.28 per cum
Laying 1st class brick masonary 1:3 in foundation & plinth (HSR 11.5 )@Rs.461.40 + 650%=3460.5 per cum
Centering & Shuttering for carbets ,PPT etc.(HSR9.11)@ Rs. 39.60+400%=198.00per Sqm
Laying C.C 1:2:4 plain in foundation and plinth (HSR 10.41 )@Rs 615.60 +450%=3385.80 per cum
Cement pointing 1:2 deep variety (HSR15.60)@ Rs. 9.90+500%=59.40 per Sqm
Painting of gates HSR Item No.16.10+16.19@Rs. 3.80+ 5.85 =9.65+230 % ZP = 31.85 / sqm
Providing & fixing G.I.coated blade wire (N.S.Item )@Rs.638 /each -as per rate approved vide CE/LCU letter no.4133-34-3LCU-2014at 20-08-14
Brick edging 6.38 cm wide 11.43 cm deep & plinth protection with with 1st class brick I/C grouting with cement sand mortar 1:4 HSR item No. 11.100 @ Rs 3.80 + 650%=28.50mtr
HARINDER PHOGAT
THE PARBHAT CO OP L AND C SOCIETY LTD
The Shiv Shakti Co-op Multipurpose Society Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .