| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 LAccepted-AOC P NO 14 4TH CROSS BANKERS COLONY EXTENSIONS KUMARAN NAGAR PUTHUR TRICHY 620017 | TIRUCHIRAPPALLI | TIRUCHIRAPPALLI | TAMIL NADU | 620017 | ₹30.5 L | L1 | Accepted-AOC 2025_MAWS_634083_1 |
| 2 | L2₹31.1 LRejected-Finance 3 56 MELA STREET SANNASIPATTI POOLANKULATHUPATTI TRICHY 620009 | TIRUCHIRAPPALLI | TAMIL NADU | 620009 | ₹31.1 L | L2 | Rejected-Finance ABOVE RATE |
| Sl No | Description | Qty | Unit | AK INFRA H1 | K K K CONSTRUCTIONS H2 |
|---|---|---|---|---|---|
| 1.00 | Removal of the Black Topped (BT) surface to 50 to70mm depth using Milling machine, including conveying the milled waste materials away from the work site to an averaged instance including hire and running charges for the machine, conveyance charges, unloading at un objection able place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers | 5,685 | m³ | 85 ₹4.8 L | 80 ₹4.5 L |
| 2.00 | Tack Coat Over Existing BT Surface Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 5,685 | m³ | 30 ₹1.7 L | 28.9 ₹1.6 L |
| 3.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 171 | m³ | 11,500 ₹19.7 L | 11,405 ₹19.5 L |
| 4.00 | Providing Speed breaker of 3.60m width with Dense Bituminous concrete (MORTH 505) and Bituminous concrete (MORTH 507) over existing speed breaker to the required grade level & alignment and rolled with vibrate roller etc complete as directed by departmental officers etc., complete | 30 | m³ | 3,800 ₹1.1 L | 3,718 ₹1.1 L |
| 5.00 | Painting center line, edge line road marking 100width with Thermoplastic paint (hot application) in such a way that painting length will be 3.00m with a gap of 3.00m with a gap of 3.00m curved for centerline will be 3.00m with a gap of 3.00m curved for center line by indigenous hand propelled road marking machine with single coat including cost of all materials such as pigments, extender, fine aggregate stand oil (binder) glass beads as per 3262:1976 for the preparation of thermoplastic paint at site mixing glass beeds 10%by weight of the ingredient at the time of application of paint on the road surface, including cost of all etc., complete | 412 | m³ | 900 ₹3.7 L | 890 ₹3.7 L |
Tender Value
₹36.4 L
EMD Value
₹36,400
Closing Date
24 Dec 2025, 3:00 pmClosed
The Commissioner, Tiruchirappalli City Corporation
Bharathidasan Road, Cantonment, Trichy - 620 001
Renewal of BT Surface by using CMP with Paver Finisher at Puthur 4 Road, Puthur EVR Road East Side WARD26
2025_MAWS_634083_1
TENDER NOTICE NO.341/2025-2026 SERIAL No 1
Open Tender
Civil Works - Roads
180 days
WARD 26
AS PER TENDER CONDITION
3 documents required · 3 mandatory
₹0
₹36,400
17 Feb 2026
18 Dec 2025
24 Dec 2025
18 Dec 2025
24 Dec 2025
18 Dec 2025
Removal of the Black Topped (BT) surface to 50 to70mm depth using Milling machine, including conveying the milled waste materials away from the work site to an averaged instance including hire and running charges for the machine, conveyance charges, unloading at un objection able place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers
Tack Coat Over Existing BT Surface Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
Providing Speed breaker of 3.60m width with Dense Bituminous concrete (MORTH 505) and Bituminous concrete (MORTH 507) over existing speed breaker to the required grade level & alignment and rolled with vibrate roller etc complete as directed by departmental officers etc., complete
Painting center line, edge line road marking 100width with Thermoplastic paint (hot application) in such a way that painting length will be 3.00m with a gap of 3.00m with a gap of 3.00m curved for centerline will be 3.00m with a gap of 3.00m curved for center line by indigenous hand propelled road marking machine with single coat including cost of all materials such as pigments, extender, fine aggregate stand oil (binder) glass beads as per 3262:1976 for the preparation of thermoplastic paint at site mixing glass beeds 10%by weight of the ingredient at the time of application of paint on the road surface, including cost of all etc., complete
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_758669.xls
BOQ • 0.30 MB
341cond.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid