Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹41.6 LAccepted-AOC | ₹41.6 L Quoted ₹47.3 L | 1 | Accepted-AOC Successful Bidder |
| Sl No | Description | Qty | Unit | M/s. GOI ENGINEERS L1 |
|---|---|---|---|---|
| 1.00MATERIALS | ||||
| 1.01 | FOAM MAKER - UL LISTED INLET SIZE-65NB, OUTLET SIZE-100NB,MOC-CS, WP-2.1 BAR TO 7 BAR, FLOW - 51GPM TO 190 GPM, K FACTOR - 133 TO 271 | 60 | Nos | 27,000 ₹19.1 L |
| 1.02 | 3-INCH, 4-INCH, 6-INCH PIPES AS PER B 36.10, ASTM A106 Gr.B SEAMLESS WITH CS FLANGES CONFORMING TO ASTM A182-SORF-150# Sch XS-ASME B16.5 INCLUDING ELBOWS, FASTENERS, GASKETS AND SUPPORT FOR SPOOL PIPES REQUIRED FOR FOAM MAKER & FOAM POURER EXH TO AVOID ANY HOT JOB ON TANK. | 18 | Set | 12,600 ₹2.7 L |
| 2.00SERVICES: REMOVAL OF EXISTING FOAM MAKERS/MODIFICATIONS IN FOAM POURER FITTINGS, INSTALLATION, PERFORMANCE TESTING AND COMMISSIONING OF SYSTEMS | ||||
| 2.01 | REMOVING EXISTING SYSTEM, MODIFICATION OF PIPELINE, INSTALLATION, REVAMPING, PERFORMANCE TESTING OF FOAM SYSTEM INCLUDING FOAM CALCULATION AND COMMISSIONING OF SEMI FIXED FOAM SYSTEM | 1 | AU | 21,60,000 ₹25.5 L |
Tender Value
Refer Docs
EMD Value
₹83,000
Closing Date
6 Nov 2025, 3:00 pmClosed
GM(P), Area Incharge ERG(O)
2nd Floor Administrative building ONGC Hazira Plant Hazira Surat Gujarat 394518
Supply installation with modifications testing and commissioning of semifixed foam systems of ARN and SKO tanks at ONGC Hazira Plant
2025_ONGC_252525_1
8U1RC25005
Open Tender
Oil/Gas
180 days
ONGC HAZIRA PLANT SURAT
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹83,000
28 Jan 2026
16 Oct 2025
7 Nov 2025
16 Oct 2025
6 Nov 2025
16 Oct 2025
16 Oct 2025 - 26 Oct 2025
Amount
MATERIALS
FOAM MAKER - UL LISTED INLET SIZE-65NB, OUTLET SIZE-100NB,MOC-CS, WP-2.1 BAR TO 7 BAR, FLOW - 51GPM TO 190 GPM, K FACTOR - 133 TO 271
3-INCH, 4-INCH, 6-INCH PIPES AS PER B 36.10, ASTM A106 Gr.B SEAMLESS WITH CS FLANGES CONFORMING TO ASTM A182-SORF-150# Sch XS-ASME B16.5 INCLUDING ELBOWS, FASTENERS, GASKETS AND SUPPORT FOR SPOOL PIPES REQUIRED FOR FOAM MAKER & FOAM POURER EXH TO AVOID ANY HOT JOB ON TANK.
SERVICES: REMOVAL OF EXISTING FOAM MAKERS/MODIFICATIONS IN FOAM POURER FITTINGS, INSTALLATION, PERFORMANCE TESTING AND COMMISSIONING OF SYSTEMS
REMOVING EXISTING SYSTEM, MODIFICATION OF PIPELINE, INSTALLATION, REVAMPING, PERFORMANCE TESTING OF FOAM SYSTEM INCLUDING FOAM CALCULATION AND COMMISSIONING OF SEMI FIXED FOAM SYSTEM
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
GCC.pdf
Tender Documents • 0.50 MB
AppendicesToITB.pdf
Tender Documents • 0.32 MB
ASCC.pdf
Tender Documents • 0.44 MB
ITB.pdf
Tender Documents • 0.39 MB
BIDMATRIX.pdf
Tender Documents • 0.27 MB
BidEvaluationCriteria.pdf
Tender Documents • 0.42 MB
SCC.pdf
Tender Documents • 0.07 MB
BiddersResponseSheet.xls
Tender Documents • 0.05 MB
SOW.pdf
Tender Documents • 0.21 MB
BOQ_290206.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid