| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC Quoted L1 Rate |
| 2 | L2₹3.7 Cr+₹1.8 L (0.50%)Rejected-AOC | ₹3.7 Cr+₹1.8 L (0.50%) | L2 | Rejected-AOC Quoted L2 Rate |
Tender Value
₹3.7 Cr
EMD Value
₹3.7 L
Closing Date
13 Jan 2025, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening the Thiruverumbur Sooriyur Road To Palanganangudy Via Poolangududi Main Street Road Km 0/0- 5/0.R284 Package 25
2024_RDTN_515630_20
54951 / 2023 / RB 1.2
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3.7 L
DRDA Tiruchirappalli
19 Apr 2025
2 Jan 2025
13 Jan 2025
2 Jan 2025
13 Jan 2025
2 Jan 2025
3 Jan 2025
Amount
Strengthening the Road from Thiruverumbur Sooriyur Road to Palanganangudy Via Poolangudi Main Street Road Km 0/0-5/0 (R284) Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking the existing BT Surface including all charges etc complete.,
4.Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
5. Providing and laying Primer Coat over the WMM surface using 7 Kg of Emulsiom bitumenas binder for 10 Sqm. area including cost and conveyance of bitumen which will be supplied departmentally at departmental section store at Union Office and cost of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges for cleaning the surface before the application of bitumen binder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as directed by the Engineer incharge and all other incidental charges etc., complete as per clause 505 of most specifications.
6. Providing and laying Tack Coat over the Primer surface using 2.50 Kg of Emulsiom bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will be supplied departmentally at departmental section store at Union Office and cost of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour chargesfor cleaning the surface before the application of bitumen binder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as directed by the Engineer incharge and all other incidental charges etc., complete as per clause 505 of most specifications.
7. Providing and laying 50mm consolidated thick bituminous macadam using 0.20cum of 26.50 -13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36cum of 2.36mm & below size IRC metal with 37Kgs of bitumen for premixing per 10sqm inclduing cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to requied temparature and mixing the min required temparature in central hot mix plant 20-30 ton capacity conveying the mix by tipper trucks top a versite spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidted by 8-10 tonne vibrratory / Pneumatic roller to the requied density etc inclduing labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 to CMP with bitumen boiler tipper trucks paver finsher/ 9m paver finsher vibratory /pneumatic oller and all other tools and plant required inclduing fuel and all other incidental charges etc complete as per specification
8. Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP etc.,
9. Providing and Laying gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.0/0-1/0
10. Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface including all charges etc complete.,
Provision for Road Marker/ Road stud with lens Reflector including all charges etc complete.,
Provision for KM Stone
Provision for HM Stone
Provision for Sign Board
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete
Construction of Retaining wall Earth work and depositing on bank etc.,For foundation Ch 1/0-2/0
For foundation Ch 4/0-5/0
CC 1:4:8mix using 40mm ISS HBG metal etc., For foundation Ch 1/0-2/0
For foundation Ch 4/0-5/0
Supply and errection of centering charges etc For foundation Ch 1/0-2/0
For foundation Ch 4/0-5/0
CC 1:3:6mix using 40mm ISS HBG metal etc., For foundation Ch 1/0-2/0
For foundation Ch 4/0-5/0
Provision for Weep hole arrangements For foundation Ch 1/0-2/0
For foundation Ch 4/0-5/0
Towards the charges for routline maintenance of the road work executed under NABARD XXX including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
R JAYARAJ (BID ID -1231591)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .