| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.5 LAccepted-AOC VALIYAPEEDIYAKKAL HOUSE MUTHUKURISSI P O PALAKKADU 678593 | MUTHUKURISSI | PALAKKAD | KERALA | 678593 | 1 | Accepted-AOC L1 bidder | |
| 2 | 2₹30.8 L+₹3.3 L (12.1%)Rejected-AOC | 2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | Kinanath V P L1 | P.Damodaran, G.R.Industries L2 |
|---|---|---|---|---|---|
| 1.00CIVIL WORKS- Demolishing, Centering & Shuttering, Concreting Work for fixing C GROOVE, SEAL TRACK and SILL BEAM. | |||||
| 1.00 | OD52481/2025-2026:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 22 | metre | 1,875.62 ₹41,263.64 Lowest | 2,600 ₹57,200 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 0.99 | cum | 2,718.28 ₹2,691.1 | 2,700 ₹2,673 Lowest |
| 1.00 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | 109.73 | sqm | 1,089.23 ₹1,19,521.21 Lowest | 1,300 ₹1,42,649 |
| 1.00 | 5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric | 996.05 | kilogram | 127.47 ₹1,26,965.98 Lowest | 150 ₹1,49,406.9 |
| 1.00 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 2.05 | cum | 10,541.68 ₹21,610.44 Lowest | 15,000 ₹30,750 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.39 | cum | 13,793.95 ₹3,64,091.31 Lowest | 16,000 ₹4,22,320 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 85 | sqm | 399.34 ₹33,943.9 Lowest | 500 ₹42,500 |
| 1.01 | OD53008/2025-2026:DRILLING (up to depth of 200mm for MS/SS/TMT rod dia. 8mm to 25mm) and FASTENING with MS/SS/TMT rod in concrete/Stone including conveyance and labor charges complete.[excluding cost of materials already supplied | 54 | no | 17.08 ₹922.32 Lowest | 30 ₹1,620 |
| 1.01 | OD53009/2025-2026:Anchoring the MS/SS rebars into the drilled hole using CHEMICAL ADHESIVES, including cost of hire charge of machine, cost of chemical adhesive and labour | 54 | no | 132.82 ₹7,172.28 Lowest | 140 ₹7,560 |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
19 Mar 2026, 5:00 pmClosed
Jishakumar C B
Executive Engineer, Irrigation-Mechanical Division, Malampuzha
The work includes the installation of MS shutters at Pulliyanthoni River Shutter- Type 1 2.5 m X 1.65 m (2 nos), Pulliyanthoni River Shutter- Type 2 2.5 m X 1.3 m(1 no), Branch Canal Shutter 1.25 m X 0.6 m (1 no).
2026_Irrig_845465_1
IRR/MH/TR/4795/2025_16_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
Palakkad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
27 Jul 2026
9 Mar 2026
21 Mar 2026
9 Mar 2026
19 Mar 2026
9 Mar 2026
9 Mar 2026 - 19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS- Demolishing, Centering & Shuttering, Concreting Work for fixing C GROOVE, SEAL TRACK and SILL BEAM. | |||||
| 1.001 | OD52481/2025-2026:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | - | metre | - | - |
| 1.002 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.003 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | - | sqm | - | - |
| 1.004 | 5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric | 0.4 | kilogram | - | - |
| 1.005 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.006 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | - | sqm | - | - |
| 1.008 | OD53008/2025-2026:DRILLING (up to depth of 200mm for MS/SS/TMT rod dia. 8mm to 25mm) and FASTENING with MS/SS/TMT rod in concrete/Stone including conveyance and labor charges complete.[excluding cost of materials already supplied | - | no | - | - |
| 1.009 | OD53009/2025-2026:Anchoring the MS/SS rebars into the drilled hole using CHEMICAL ADHESIVES, including cost of hire charge of machine, cost of chemical adhesive and labour | - | no | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1427999.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1427999.xls
BOQ • 0.32 MB
SBD1.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .