Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 CrFinancial bid opened C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | ₹8.1 Cr | L1 | Financial bid opened |
| 2 | L2₹8.1 Cr+₹1.2 L (0.14%) C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | ₹8.1 Cr+₹1.2 L (0.14%) | L2 | - |
| 3 | L3₹8.4 Cr+₹24.3 L (2.99%) C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | ₹8.4 Cr+₹24.3 L (2.99%) | L3 | - |
| 4 | L4₹8.6 Cr+₹45.0 L (5.54%) C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | ₹8.6 Cr+₹45.0 L (5.54%) | L4 | - |
| 5 | L5₹9.2 Cr+₹1.1 Cr (13.8%) C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu. | ₹9.2 Cr+₹1.1 Cr (13.8%) | L5 | - |
Tender Value
₹12.8 Cr
EMD Value
₹22.8 L
Closing Date
21 Jan 2026, 3:30 pmClosed
EE-Ananthapuram
Msnl Sreenivas
The Executive Engineer (Civil) CPWD, Ananthapuram unit Central University of AP Campus IT Incubation
C/o Roofing over specified existing foot paths precast compound wall to Boys Hostel I and at west side of campus ( i.e opposite main entrance) development works in and around Harvesting pond, stone pitching, approach bridge to statue point, toilet blocks near play field, renovation of old pump room, renewing damaged open well, boundary wall, cutting & levelling of pay field etc. minor development works including providing street lighting from Boys hostel to harvesting pond, flood lighting around the pond, IEI in toilet blocks, open stage at playing area and covered foot path, supplying & levelling of LT cables, LT cubilcl power supply panels and feeders including other minor electrical development works etc. for Central University of Andhra Pradesh at Janthaluru, Ananthapuramu.
138993
04/EE(C)/ATPCD/2025-26
OPEN
Development
NCB
180 days
Y.s.r., Andhra Pradesh
14 documents required · 14 mandatory
₹22.8 L
Not Applicable
21 Jan 2026
7 Jan 2026
21 Jan 2026
21 Jan 2026
12 Jan 2026
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index+.pdf
document • 0.28 MB
PART+A+-+CUAP+-+Dev+Works+%281%29.pdf
document • 1.08 MB
PART+B+-+CUAP+-+Dev+Works+%281%29.pdf
document • 1.82 MB
PART+C+-+CUAP+-+Dev+Works+%281%29.pdf
document • 0.45 MB
PART+D+-+CUAP+-+Dev+works+%281%29.pdf
document • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .