| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹73.0 LAccepted-AOC | 1 | Accepted-AOC EE/LIDEW/MPM/101/25-26 | |
| 2 | Rejected-Technical KP 1 50 MAIN ROAD MULLAPPALLY P O PAZHAMALLOOR VIA KOOTTILANGADI MALAPPURAM 676 506 | MALAPPURAM | MALAPPURAM | KERALA | 676506 | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical KOTTAKKAL TIRUR MUNICIPALITY KERALA | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L5 | |
| 5 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | MKSContractingCompanyIndiaPvtLtd L2 | Nusli L5 | MOHANDAS P L4 | HM CONSTRUCTION COMPANY L1 | PRAVEEN S L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of School Building | ||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 196.63 | cum | 298 ₹58,594.55 | 330 ₹64,886.58 | 330 ₹64,886.58 | 286.7 ₹56,372.67 Lowest | 303 ₹59,577.68 |
| 1.00 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 32.08 | cum | 817 ₹26,207.73 | 906 ₹29,062.67 | 906 ₹29,062.67 | 786.7 ₹25,235.76 Lowest | 833 ₹26,720.97 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 25.13 | cum | 6,566 ₹1,64,983.88 | 7,286 ₹1,83,075.32 | 7,286 ₹1,83,075.32 | 6,324.6 ₹1,58,918.22 Lowest | 6,703 ₹1,68,426.28 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 152.19 | sqm | 320 ₹48,700.8 | 354 ₹53,875.26 | 354 ₹53,875.26 | 307.8 ₹46,844.08 Lowest | 325 ₹49,461.75 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 86.11 | cum | 8,681 ₹7,47,520.91 | 9,634 ₹8,29,583.74 | 9,634 ₹8,29,583.74 | 8,362.4 ₹7,20,086.26 Lowest | 8,864 ₹7,63,279.04 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.54 | cum | 10,571 ₹1,53,755.2 | 11,731 ₹1,70,627.4 | 11,731 ₹1,70,627.4 | 10,182.9 ₹1,48,110.28 Lowest | 10,792 ₹1,56,969.64 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 227.58 | sqm | 835 ₹1,90,029.3 | 926 ₹2,10,739.08 | 926 ₹2,10,739.08 | 804 ₹1,82,974.32 Lowest | 852 ₹1,93,898.16 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 92.72 | cum | 11,125 ₹10,31,521.13 | 12,000 ₹11,12,652 | 11,900 ₹11,03,379.9 | 10,717 ₹9,93,690.96 Lowest | 12,254 ₹11,36,203.13 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 139.7 | metre | 189 ₹26,403.3 | 209 ₹29,197.3 | 209 ₹29,197.3 | 181.8 ₹25,397.46 Lowest | 192 ₹26,822.4 |
Tender Value
₹84.2 L
EMD Value
₹50,000
Closing Date
18 Oct 2025, 6:55 pmClosed
EXECUTIVE ENGINEER
Office of the Executive Engineer, LID and EW Division, Malappuram, civil station, Malappuram District Panchayath Building, Malappuram, 676505
LAC-ADS-(2025-26), Thavanur LAC, Work Proposed By Hon. MLA Dr. K.T. JALEEL (ID 23452) -Construction of the GMLP School Koottayi South Building in Purathur Panchayat-General Civil Work
2025_LSGD_807893_3
DB1/TN/EE/36/25-26
Open Tender
Civil Works - Buildings
Item Rate
365 days
MALAPPURAM
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,950
₹50,000
Yes
5 Feb 2026
10 Oct 2025
21 Oct 2025
10 Oct 2025
18 Oct 2025
10 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1348024.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_1348024.xls
BOQ • 0.32 MB
03_TENDER_36.rar
Tender Documents • 2.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .