Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance AT LODNA MASJID PATTI P O LODNA 828131 DIST DHANBAD JHARKHAND | LODNA | DHANBAD | JHARKHAND | 828131 | +0.00% | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹3.5 L+₹6,919 (2.00%)Admitted-Finance 00 HANSH NAGAR RADHA RAMAN ROAD MAINPURI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | +2.00% | ₹3.5 L+₹6,919 (2.00%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical AT BANIYAHIR P O IHARIA DIST DHANBAD 828111 | DHANBAD | DHANBAD | JHARKHAND | 828111 | - | - | - | Rejected-Technical Techno-commercially Not qualified. |
Tender Value
₹4.1 L
EMD Value
₹5,104
Closing Date
10 Aug 2026, 10:00 amClosed
Area Manager (EnM) Lodna Area
Office of the General Manager Lodna Area
Complete Rewinding/ Repairing of 315 KVA 3.3KV/440 Volt Power Transformer (TSU)with Switch unit Make at Sector-III MOCP of Amal. NT-ST-Kujama OCP under Lodna Area..
2026_BCCL_362605_1
BCCL/LA/EnM/F-19/26-27/030
Open Tender
Electrical and Maintenance Works
Percentage
20 days
Lodna Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,104
12 Sept 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
10 Aug 2026
29 Jul 2026
28 Jul 2026 - 1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (A) New Copper Conductor for HV and LV Coil | - | Kg | 1,000 | - |
| 2 | Insulating materials | - | LS | 44,070 | - |
| 3 | Triple Glass Covring Charge | - | Kg | 150 | - |
| 4 | Rupaton Brazing rod for LV & HV connection .with D.A and Oxygen | - | Kg | 3,600 | - |
| 5 | Cleaning of Core. | - | Job | 2,000 | - |
| 6 | Tank Cleaning . | - | Job | 3,000 | - |
| 7 | Insulating Varnishing and Assembling etc Charge | - | Job | 5,000 | - |
| 8 | H.V. Coil and L.V. Coil making charge . | - | Job | 6,000 | - |
| 9 | Dismantling Installation and Commissioning charge. | - | Job | 3,000 | - |
| 10 | Supply and Fitting L.T. Side Stude Change | - | Nos | 1,500 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_375514.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .