Block Development Officer(B.P)
Block Development Office, Thanthoni
Repairs to the M.Tiles Building and Kitchen Shed 3 Nos. School in Mookanakurichi Panchayat
2023_RDTN_292080_5
Thanthoni Block - SIDS - 2021-2022
Open Tender
Civil Works
Item Rate
90 days
Thanthoni Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,380
Yes
16 Mar 2023
2 Mar 2023
14 Mar 2023
2 Mar 2023
14 Mar 2023
2 Mar 2023
Amount
Repairs to the M.Tiles Building at Veeranampalayam PUE school in Mookanakurichi Panchayat
Re-Roofing with (80% OLD M.Tiles 20% New M.Tiles) over New ceiling Tiles including cost of CW,reepers 50X25 mm etc., complete
Brick work in cm 1 mix using country bricks of regd size including cost and conveyance of all materials to site and labour charges etc., complete
Platering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to site and labour charges etc., complete
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete .
Name of the work: Repairs to Kitchenshed at Thaliyapatty PUE School in Velliyanai Panchayat
Dismantling RCC Roof including all charges etc
Dismantling Brickwork including all charges etc
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
RCC 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm and all labour charges for mixing, laying, curing etc complete for 10 cum
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm and all labour charges for mixing, laying, curing etc complete for 10 cum
Whitewasing two coats with best shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved Oil bound distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete
Painting with ready mixed enemal paint over Old iron works including cost andconveyance and all labour charges etc complete
Painting with ready mixed enemal paint over Old iron works including cost andconveyance and all labour charges etc complete
Provision for Supplying and fixing following thickness of cuddapah slab for cupboard 25mm thick
Provision for New Steel Window 1.20x1.20m imcluding all charges etc
Provision for New Steel Door 0.90x2.10m imcluding all charges etc
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
Name of the work: Repairs to Kitchenshed at Veeranampalayam PUE School in Mookanakuruchi Panchayat
Dismantling RCC Roof including all charges etc
Dismantling Brickwork including all charges etc
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
RCC 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm and all labour charges for mixing, laying, curing etc complete for 10 cum
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm and all labour charges for mixing, laying, curing etc complete for 10 cum
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Whitewasing two coats with best shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved Oil bound distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete
Painting with ready mixed enemal paint over Old iron works including cost andconveyance and all labour charges etc complete
Painting with ready mixed enemal paint over Old iron works including cost andconveyance and all labour charges etc complete
Provision for Supplying and fixing following thickness of cuddapah slab for cupboard 25mm thick
Provision for New Steel Window 1.2x1.20m imcluding all charges etc
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
Light and Fan point SD-17
Plug point SD-36
Tubelight With Fittings SD-87
Service wire SD-64
Bulk Head Fitting SD-83
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M SUBRAMANIAM
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .