Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
19 Oct 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Soil and Water Conservation Division Baramulla
Soil and Water Conservation Division Baramulla
Providing and fixing of 04 strands of BA barbed wire fence line on Kiker fence posts under UT State Capex Budget at Co.22-Kh-Khyar Bandipora including all operations as per estimate.The Kiker Fence Posts will be provided by the department at F O R
2021_SWCD_142084_1
e-NIT No Fresh (old 07) 09 of 2021-22
Open Tender
Civil Works
Item Rate
30 days
-Khyar Bandipora
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Soil and Water Conservation Division Baramulla
Exempted
20 Oct 2021
30 Sept 2021
20 Oct 2021
1 Oct 2021
19 Oct 2021
1 Oct 2021
30 days
Providing & fixing of 04 strands of BA barbed wire fence line on Kiker fence posts under UT State Capex Budget at ( Co.22-Kh-Khyar Bandipora) including all operations as per estimate. Note:- (Kiker Fance Posts will be provided by the Department at PLP of site).
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift up to 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil 1m from cutting edge.390 No.x1’-6’X1’-6’X1’-6’=1316.25 cfts or37.27 cum.All kind of soil=@60% =22.36 Cum
Ordinary rock @ 40% = 14.90 cum
Laying & dumping of soling stone in horizontal including ramming , compacting & cost of stones and carriage complete.( sides of wooden posts) 390No.x1’-6’X1’-6’X3”(avg)=219.37 cfts or 6.21Cum
Providing of BA Barbed wire with line wire dia 2.5mm and point wire dia 2mm having barber at a distance of 75mm +12mm conforming to relevant IS specification. 1x 3000 Rft @ 0.20= 600 Kg or 6.0 Qtls
Providing of U-nails made of cold steel wire of 4mm dia. Hot dip galvanized. 1x26Kg= 26 Kg
Providing & fixing gate of angle iron40x40x6mm minimum width of gate 4’-0 with sq. bars in between 10mm handles, Aldrops , hinges etc. including its carriage up to site of work priming, painting in required shades as per site incharge complete.
Providing and installing sign Board made out of ISA 40x40x6mm having total height 8’-6” fitted with flat iron 25x5mm on 5’x3’ CR sheet of 20 guage dully welded and fitted with nuts and bolts wherever necessary with painting & writing complete to be installed at site in 1’-6’X1’-6’X1’-6’pits in cement concrete including its carriage up to site of work & priming with red oxide complete
Filling available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, lead up to 50m and lift up to 1.5m. 390No.x1’-6’X1’-6’X1’-6’=1316.25 cfts or 37.25 Cum @ 80%= 29.8Cum
Labour charges for Erection of wooden posts in dug out pits with one strut to every 12th fence post and fixing upper tip of a strut with a nail including fixing of BA Barbed wire to the wooden posts in four strands straightening and tightening of wire as required including tarring& charring, painting of fence posts complete job.
Carriage of different materials from source to site of work a Stone average 10 Km by MT and 1000m by head load Qtty vide No.(2) 6.21Cum Qtty vide (4,5,7) = (9.61+8.62)cum= 18.23 cum @
Steel BA Barbed wire average 20 Km by MT and 1000m by head load Qtty vide No.(3) 0.6MT
AQIB JAVID LONE
HILAL AHMAD MIR
stage.html
html • 0.02 MB
finance_299822.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .