Loading…
Loading…
Tender Value
₹10 L
EMD Value
₹5,000
Closing Date
13 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, PGVCL, Junagadh-2
Erection and Maintenance of HT, LT and TC under Mendarda-1 Sub Division for Maintenance Scheme Work
285273
SEJND/T-2/TN-324/652 Date: 09.03.2026 Sr No. 26
Open
Electrical and Maintenance Works
Junagadh
10 documents required · 10 mandatory
₹590
Paschim Gujarat Vij Company Limited
₹5,000
2 Apr 2026
2 Apr 2026
2 Apr 2026
13 Apr 2026
2 Apr 2026
2 Estimated cost in Rs. 1000000/-
3 Tender Fee in Rs. ( non-refundable) 885/-
4 Payment of tender fees to be deposited online by
RTGS/NEFT to the details of bank account is the details of
bank account is SBI, IFSC code; -SBIN0060046 and name of
account holder _ paschim Gujarat Vij Company Limited Bank
Earnest Money Deposit amount in Rs. 10000=00
(1 % of Tender Amount)
(Payment RTGS/NEFT to the details of bank account is the
5 details of bank account is SBI, IFSC code; -SBIN0060046 and
name of account holder _ paschim Gujarat Vij Company
6 On line ( e-tendering ) tender / offer
submission last Date 07/04/2026 up to 18:00 hours only
(This is mandatory )
7 Date & Time for pre bid meeting ( If Required) No
8 Date of opening of Primary Bid of Tender on Dated
08/04/2026 @ 15:00hours (if possible)
10 Date of opening of Technical Bid at Date 09/04/2026 @ 11:00hours (if possible)
11 Date of on line opening of Price bid, Date 10/04/2026@ 11:00hours (if possible)
12 Validity of Bid 180 days
Sr. Particulars Page
1 Tender Details Table No
2 SECTION I: INSTRUCTIONS TO THE BIDDER 4-13
3 SECTION II: Schedule A 14-17
4 SECTION III: General Instructions to the 18-19
successful bidder
5 SECTION IV :TERMS & CONDITIONS REGARDING 20-25
INDUSTRIAL LAWS AND OTHER RELATED MATTERS
6 SECTION V : TAXES 26-27
7 SECTION VI : General Terms & Conditions 28-41
8 SECTION VII : Annexure I to XI, BG Formats for 42-58
EMD and, SD, Agreement and Indemnity Bond
9 SECTION VIII Technical Specifications 59-63
10 SECTION IX Drawings 64-78
11 SECTION X Drawings 79+
GENERAL INFORMATIOS FOR BIDDERS
1.1 The "PGVCL" shall mean the Executive Engineer, Rural Division No-2,
Junagadh, PASCHIM GUJARAT VIJ COMPANY LTD., having its corporate
office at Nana mava Main Road, Laxminagar, Rajkot. With expression shall
unless repugnant to the context include its permitted assigns or successor /
authorized representatives.
1.2 The "Contractor" / Successful Bidders shall mean the Bidders, whose tender
has been accepted by the PGVCL for award of the contract and shall include
his authorized representatives.
1.3 The "Engineer-in-Charge" shall mean the authorized officer of the PGVCL to
act as Engineer-in-Charge to supervise the work – for the purpose of the
1.4 The "Specification" shall mean the tender forming a part of the contract along
with Performa, schedules and drawings.
1.5 The "Order" shall mean the official letter issued by the PGVCL, informing the
bidder that his tender has been accepted.
1.6 The "Contract" shall mean the agreement to be entered into by the PGVCL
with the contractor and shall include the commercial technical and general
conditions, schedules, drawings and any other conditions specifically agreed
between the parties forming a part of the contract.
1.7 The "EMD" shall mean Earnest Money Deposit.
1.8 The "Contract Value" shall mean the total amount indicated in the contract
1.8 The "Contract Value" shall mean the total amount indicated in the contract
agreement as per order placed by the PGVCL and calculated from the
quantities indicated in the tender.
1.9 The "Completion Period" shall mean the period starting from the date of issue
of "Order" and required to complete the work in all respect.
1.10 The "Work" shall mean activities to carry out for the entire scope of this
1.11 “Inspector” shall mean the any person nominated by PGVCL from time to time
to inspect the works under the contract and/or duly authorized representative
of the PGVCL “Letter of Award” shall mean the official notice issued by the
PGVCL notifying the contractor that his bid has been accepted.
1.12 “Date of Contract” Shall mean the date on which Letter of award has been
1.13 “Month” shall mean the calendar month day or days unless herein otherwise
expressly defined shall mean calendar day or days of 24 hours each.
1.14 “A Week” shall men the continuous period of seven days.
1.15 HT means High Tension
1.16 LT means Low Tension electric line,
1.17 U/G means Under Ground
1.18 Electricity Rules: - All the works shall be carried out in accordance with latest
Rules under Electricity Act-
1.19 Testing: - After completion of work execution required Tests are to be taken
in presence of Engineer in Charge whenever required.
1.20 Definition of “Similar work” for overhead network: Erection of overhead
electrical Network up to voltage level 22 KV
1.21 Definition of “Similar work” for underground network: Laying of HT / LT
Underground Power cable network for Distribution system.
2. PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR BIDDERS
2.1 Approve vendor is only qualified for participate in this tender. The
work executed through open / advertised tender shall only be considered
for experience of work. The work done through limited tender shall
not be considered for experience.
2.2 Any vendor having any work delayed by more than 120 days in
entire division will be dis qualified from participation. Other vendor
promoted by one or more similar partners of vendors promoted by
one or more similar partners of agencies so disqualified will also be
2.3Following documents are mandatory for the Bidders.
The vendor registration policy to include abinitio. No submission during
BID is required
The self-certified online transaction slip for tender fee and EMD.
The cancelled check of concern bidder is to be attached for further
course action of payment as per rule through RTGS/NEFT by PGVCL.
Bidder has to upload scanned copies of original (Notarized/self-attested
copies of original – as specified in this tender) with bid.
It shall be sole responsibility of the bidder that the uploaded scanned
documents (in PDF form) remain legible and should not be password
3.INSTRUCTIONS FOR e TENDERING (ON LINE TENDERING) TO BIDDERS.
3.1 Bidders willing to participate in tender will have to get themselves
registered on website www.nprocure.com
3.2 Bidders willing to participate in tender should have valid digital certificate /
Digital Signature as per Information technology Act 2000 using which they
can sign their electronic bids. Bidders can also procure the same from (n)
code solutions, a division of GNFC Ltd., who are licensed certifying
authority by Govt. of India.
Download tender Documents from PGVCL web site up to date shown
in the tender document.
3.3 For details regarding digital certificate and related training the below
mentioned address may be contacted
(n) Code Solution A division of GNFC, 403, GNFC Info Tower, Bodakdev,
3.4 Bidders who already possess valid Digital certificate need not procure a
new digital certificate.
3.5 Bidders can prepare and edit their offers number of times before tender
submission date and time as mentioned in this tender details table no1.
After tender submission date and time, bidder cannot edit their offer
submitted in any case. No written or online request in this regard shall be
3.6 Bidder shall submit their offer, i.e. Technical Bid as well as price bid in
Electronic format on website www.nprocure.com before the validity period
mentioned in tender details Table no1.
3.7 Offers submitted without digitally signed will not be accepted.
3.8Offers only in physical form will not be accepted in any case
4. UNDERSTANDING AND CLEARIFICATIONS ON DOCUMENTS AND
SPECIFICATIONS.
4.1 All interested parties are requested to understand this Tender
Document in detail in order to comply with PGVCL’s requirements
including but not limited to the Tender fees, EMD and deadlines,
selection criteria, selection methodology, scope of work, and minimum
technical standards.
4.2 The Bidder is required to carefully examine the specifications and
documents and fully inform himself as to all the conditions and matters
which may in any way affect the Work or the cost thereof. If any Bidder
finds discrepancies or omissions in the specifications and documents or
is in doubt as to the true meaning of any part, he shall at once request
in writing in advance before filling in the tender, within the time limit as
per Table no 1, for an interpretation/clarification by the PGVCL Rural
Division-2, Junagadh office. Then The PGVCL Rural Division-2,
Junagadh office will issue interpretation and clarifications as he may
think fit of such interpretations and clarifications, the Bidder may submit
his bid but within the time and date as specified in the Table no1. All
such interpretations and clarifications shall form a part of the
specifications and documents, and accompany the bidder's proposal.In
case of difference of opinion about interpretation of specification etc. the
decision of Executive Engineer, Rural Division-2, Junagadh will be final
and shall be binding to the contractor.
4.2 Verbal clarifications and information given by the PGVCL or his
employee(s) or his representative(s) shall not in any way be binding on
4.3. All interested parties requested to strictly abide by all terms prescribed
in this RFP Document and provide accurate information to the best of
their knowledge without misleading PGVCL to be considered for
participation in this Project.
4.4. Bidders should be in touch with websites
https://pgvcl.nprocure.com &www.pgvcl.com for information
regarding revision/corrigendum/Amendment in the Tender
Document till due date of online.
Submission and thereafter. No separate information shall be sent in this
regards and also not publish in newspaper.
5. TENDER FEES (Non Refundable & Non-transferable)
Existing rate of GST will be levied on following tender fees as per GST
Rules in force during this Tender Period.
5.1 The Tender fees is payable, as per following Table,between the dates
mentioned in Table no 1 by RTGS/NEFT to the details of bank account is
the details of bank account is SBI, IFSC code; -SBIN0060070 and name of
account holder _ paschim Gujarat Vij Company Limited. The transaction ID and
Slip is to be uploaded in on line tender
Sr.No Tender Amount Fees in
Above Rs 5,00,000/- up to Rs
Above Rs10,00,000/- up to
Above Rs25,00,000/- up to
5.2 The tender fees once paid for tender document will not be refunded under
any circumstances or not transferred to other bidder.
6. EARNEST MONEY DEPOSIT (EMD)
6.1The EMD payable, between the dates mentioned in Table no 1 ,Payment
RTGS/NEFT to the details of bank account is the details of bank account is SBI,
IFSC code; -SBIN0060070 and name of account holder _ Paschim Gujarat Vij
Company Limited. The EMD Amount is 1 % of the Tender Estimated Cost.
6.2 The digital copy of amount transfer towards Tender fee and EMD is to be
uploaded with the tender documents.
6.3 The EMD of all unsuccessful bidders except that of the successful bidder will
be returned after the award of the contract.
6.4 EMD of the successful bidder to whom a contract is awarded will be returned
after the said bidder pays the security deposit and signs the contract
6.5 If the successful bidder fails to submit a Security Deposit within 15days from
the date of LOA of the contract or fails to sign the contract agreement then
the EMD amount will be forfeited in favour of PGVCL without any notice or
and action for “Stop deal” will be initiated as decided by tender inviting
6.6 No interest will be payable by the PGVCL on the above Deposit.
6.7 Tenders without Earnest Money Deposit by the firms/Name will be rejected
without entering in to further Correspondence in this regard and no reference
will also be made.
7. In case of On line Tenders
7.1 Technical & Commercial Bid cover:
7.11 Following documents are mandatory and to be uploaded in Tender.
1. The vendor certificate issued form Circle office is to be attached.
2. All the tender documents to be uploaded with online bid only.
3. Online amount transaction details slip of tender fee and Earnest
4. Every bidder should, at the time of submission of bid, give a
declaration, that bidder shall not have conflict of interest with other
bidders for particular quoted item.
7.2 Commercial / Price Bid:
7.21 The bidder must clearly quote their rates in Schedule – B of this
tender, in percentage above than, below than or equal to, the tender
ratein figure as well as in words. The bidder should specify whether
the quoted rates are with or without prevailing taxes, if applicable, in
force at that time, The bidder must work out the total price of their
tender offered accordingly and the total amount should be clearly
tender offered accordingly and the total amount should be clearly
written in words & figure, in case of any discrepancy whatever written
in words shall prevail. Company shall at liberty to decide the matter as
7.22 Further bidders, for “On line tenders”, are requested to submit
price – bid on-line only and not to submit the price bid in
physical form. This is mandatory. If price bid is submitted in physical
form, same will not be opened and only on-line submitted price bid will
be considered for evaluation. In On Line price Bid, GST is to be
mentioned in separate row/Column.
PGVCL reserves the right to reject any OR all tenders without assigning any
reasons thereof.
8 All the submission are to be done in online exclusively. No
physical submission of Technical-Commercial/Price bid are
9. The works referred herein shall cover the entire scope of the Tender.
10. The issuance of bid document would not mean that the bidder has qualified
for the bidding. Hence bidders should ensure themselves of their credentials
before submitting their offer.
11. Executive Engineer, PGVCL, Rural Division-2, Junagadh reserves the right
to spread the order if required.
12. Does not anticipate change in the PGVCL ownership during the proposed
period of work.
13. AMENDMENT TENDER
13.1 At any time prior to the deadline for submission of bids, as mentioned
in Table1, PGVCL may, forany reason, whether at its own initiative or
in response to a clarification requested by a respective bidder, modify
the bidding documents by amendments.
13.2 The amendment will be notified, only on PGVCL Website & n-procure
website in case of on line tender, PGVCL will bear no responsibility or
liability arising out of noncompliance of the same in time or otherwise.
13.3 Such amendments, clarification etc. shall be binding on the bidders
and will be given due consideration by the bidders while they submit
their bids and invariably enclose such documents as a part of the bid.
14. SUBMISSION OF TENDERS
14.1 Follow all the instructions narrated this tender document for
submission and no any further communication in the matter will be
The Bidders must ensure that all the Annexures are completely filled
in their tenders and the information called for is given in totality. A set
of complete tender documents is required to be submitted duly signed
and stamped by authority competent to sign on behalf of bidder on
each page as a token of unconditional acceptance to the conditions of
various clauses of tender documents. The bidder's bid and the
documents attached there to shall be considered for forming part of
the contract documents.
14.2 For “On Line Tenders”
14.21 Tender Papers & Specifications may be down-loaded from Web
site https://pgvcl.nprocure.com (For view, download and on
line submission) and PGVCL web site www.pgvcl.com (For
view & down load only).
14.22 The bidder has to follow instruction given in this tender
documents as well as the documents submitted for vendor
14.23 The vendor certificate issued form Circle office and Online
amount transaction details slip of tender fee and Earnest Money
Deposit to be submitted Online, within time “NO COURIER
SERVICE OR HAND DELIVERY” will be allowed, to following
ExecutiveEngineer,
PASCHIM GUJARAT VIJ COMPANY LTD.,
Address: 3rd floor, Snavad Complex, Azad Chowk, Junagadh,
Price bids to be submitted ON LINE only before time limit specified
in “Tender Details” as mentioned in this documents this
15 REJECTION OF TENDER:
15.1 The Bidders is expected to examine all instructions, terms, conditions,
schedules and other details called for in this specification and keep
himself fully informed about all which may, in any way, affect the work,
or cost thereof. The bidder should sign on each page of tender
documents , as mentioned in Section 1 point no. 2.15, failure to furnish
the required information or submission of tender not as per the
specification will be at the Bidders risk may result in rejection.
15.2 The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified
in this tender.
15.3 If any bidders firm or/and partner or proprietary firm anywhere in
companies (PGVCL, UGVCL, MGVCL, GETCO, DGVCL, GSEC) under
GUVNL are under criminal investigation for any kind of fraud for public
and theft of material or/and with handlings the material and any civil
and/or criminal case pending at any stage than offer of such bidder /firm
will be out rightly rejected.
15.4 Bids submitted after the time and date fixed for the receipt of bids as set
out in the Table no1, shall be rejected.
15.5 Any deviation found in Data/Details/Documents between online offer (e-
tendering) and physically submitted documents of bidder, offer of the
same shall be liable for rejection at the discretion of PGVCL.
15.6Conditional bids shall not be accepted.
16. LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other
language shall be accompanied by its translation in English. Failure to
comply with this may disqualify a bid. In the event of any discrepancy in
meaning, the English language copy of all documents shall govern.
17. SIGNATURE OF BIDDER
Bidders willing to participate in tender should have valid digital certificate /
Digital Signature as per Information technology Act 2000 using which they
can sign their electronic bids. Bidders can also procure the same from (n)
code solutions, a division of GNFC Ltd., who are licensed certifying
authority by Govt. of India.
18. PRICE BASIS CURRENCY AND PAYMENTS
Bidder shall indicate bid prices in Indian Rupees only.
19. EFFECT AND VALIDITY OF TENDER
The bid should be kept valid for a period of 120 DAYS from the date
set for opening of the technical bid.
20. EVALUATION AND COMPARISION OF TENDERS
Generally the qualifying price bids, Bid price shall mean the bid price quoted
by each bidder in his bid for the complete scope of works including all duties
and Taxes ,.will be evaluated by the PGVCL to ascertain the best and lowest
evaluated bid in the interest of the PGVCL, for the complete works covered
under these specifications and documents.
21. ARITHMETICAL ERRORS
Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between words and figures, the amount in words will
prevail. If there is discrepancy between the unit price and the total price
which is obtained by multiplying the unit price and quantity, or between sub-
total and the total price, the unit or sub-total price shall prevail, and the total
price shall be corrected. In case of discrepancy between sub-total price
obtained by adding various prices in the schedule and the sub-total price
indicated for that particular schedule, the sub-total obtained by addition of
various arithmetically corrected prices would be considered for evaluation.
However, the PGVCL shall be entitled to award the contract at the lowest of
the prices arrived at from various schedules, identified for that purposes, in
the bid proposal sheets.
If the bidder does not accept the correction of the errors as above, his bid will
22. AWARD OF CONTRACT
22.1 Notification of award of contract will be made in writing to the successful
bidder by the PGVCL.
22.2 The contract will be awarded to the best qualified and responsive bidder
offering the lowest evaluated bid in conformity with requirements of
these specifications and documents and PGVCL shall be the sole judge
in this regard and subject to the provisions of these instructions to
bidders and other terms and conditions detailed out in these documents
and specifications. A responsive bid is one which accepts all terms and
conditions of these specifications and documents without any
22.3 PGVCL Reserves the right to award separate contract to two or more
parties in line with the terms and conditions specified in the
22.4 PGVCL reserves the right to distribute the work order and award the
contract to multiple Bidders at the rate of rate quoted by L-1 bidder to
expedite/mitigate the requirement of work within the stipulated time
period, if decided by the committee.
22.5 PGVCL reserves the right to reject/disqualify the if the bidder have
already more than two work order in same sub division, to have a scope
of work order with more than one agency i.e. get multiple
agencies/contractor in one sub division.
23. COMPLETION PERIOD
The contractual period for execution of the work stated in Schedule – B of
this Tender consist365Days. The commencement date of Order shall be
Date of issue of the Order.
You shall have to complete the work as per the given time limit in sub order
and if any work order/sub work order is delayed beyond 120 days from the
eligible time limit mentioned. If you are failed to compete the work in this time
period then you/firm is not eligible for further orders till all allotted works are
The time will be extended as per provision laid dawn in Delegation of Powers
(Committee level) Clause no 5.0 Power relating to Contractors and sub
clause no 5.5 B as “Extension of time limit for works contract if applied
before or after the expiry of contract period with penalty”
25. Conflict of Interest among Bidders/ Agents:-
A bidder shall not have conflict of interest with other bidders for particular quoted item.
Such conflict of interest can lead to anti-competitive practices to the detriment of
Procuring Entity’s interests. The bidder found to have a conflict of interest shall be
disqualified. A bidder may be considered to have a conflict of interest with one or more
parties in this bidding process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/
financial stake from any of them; or
c) they have the same legal representative/ agent for purposes of this
d) they have relationship with each other, directly or through common
third parties, that puts them in a position to have access to
information about or influence on the bid of another bidder; or
e) bidder participates in more than one bid in this bidding process.
Participation by a bidder in more than one Bid will result in the
disqualification of all bids in which the parties are involved.
However, this does not limit the inclusion of the components/ sub-
assembly/ assemblies from one bidding manufacturer in more than
f) In cases of agents quoting in offshore procurements, on behalf of
their principal manufacturers, one agent cannot represent two
manufacturers or quote on their behalf in a particular tender
enquiry. One manufacturer can also authorise only one agent/
There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian
agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the
preparation of the design or technical specifications of the contract
that is the subject of the Bid;
h) incase of a holding company having more than one independently
manufacturing units, or more than one unit having common
business ownership/ management, only one unit should quote.
Similar restrictions would apply to closely related sister companies.
Bidders must proactively declare such sister/ common business/
management units in same/ similar line of business.
i) Bidder shall not act in contravention/ violation to the provisions of
competition act, as amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration, that
bidder shall not have conflict of interest with other bidders for particular
quoted item, as above.
26 The Warrantee period
If during one year following the work completion any maintenance is felt
necessary, for example straitening of pole, cross arms, Conductor stringing,
Tightening of Guy etc. then such work will have to done by the bidder free of cost.
If there is any new material required for maintenance during this warrantee
period i.e. one year time period, such requirement will have to be approved by The
Executive Engineer of concerned division. Quarterly report of such material issued
(vendor wise) will have to be shared with circle office by division office.
27 "If in any Bidder Company/firm, the interest (i.e. Shareholding in company and share in partnership
firm) of any employee of
the tendering Company or his/ her relative as defined in Section 2(77) of the Company's Act. 2013 is 10%
tendering Company will not deal with such Company/ Firm at all.
1.0 For Underground Cable
1. Bidder has to maintain the records of allotted Cable Drum with actual
Cable/Conductor length. Cable length must be measured before laying. Cable
joints are to be done as per requirement only and length of cable must be
utilized accordingly.
2. Cable is to be laid in Trench as per instructions of Engineer-in-Charge.
3. The trench excavation and filling–in shall be so executed that all walls, roads,
sewers, drains, pipes, cables, structures, places and things shall be reasonably
secured against risk of injury and shall be carried out to the satisfaction of the
authorities concerned. However, if any, damages to existing services made,
Contractor shall arrange and pay for any necessary repair, to make good the
4. When the excavation of the trenches has been accurately executed, the
contractor shall inform engineer in-charge for approval. Lying of cables shall not
be started until engineer in-charge approves the trench.
5. All the related material for laying the cable in trench i.e. Half round RCC Pipes
having _both sides smooth surfaces, 25.4 mm thick , 152.4 mm inner diameter,
1000 mm long and well cured and good quality; Sand from river bed, HDPE
Pipes, GI Pipes and sundries material if any (As per Schedule B) are to be
supplied by Bidder at his own Cost. All such material must be approved from
concerned Engineer-in-charge before utilization and it must be ISI marked
where ever applicable.
6. Cable laying work must be executed as per prescribed in Schedule B. sand
filling in Trench must be done as mentioned in Schedule B. Megger test of
Cable must be taken in presence of Engineer-in-charge before laying and
Bidder has to maintain separate Records duly signed by Engineer-in-Charge for
each results. After laying the Cable in trench it is to be covered with half round
pipe of RCC as prescribed in Schedule B and approved sample. Each Half
round Pipe must be marked with “PGVCL” with solid Red Color on Top.
7. Proper methodology of laying is to be adopted by the Bidder. Bidder has to lay
Cable in the stretch on small pulleys kept in the Trench so that it can be
prevented from any scratches on Cable. Drum must be fixed on Drum Machine
while stretching and to be kept on one end of Trench for smooth laying.
8. After completion of laying as above, remaining trench must be filled with sand.
Leveling with Road is to be done after complete sand filling. No any stones or
any other debris are to be utilized in filling of Trench. The contractor shall
dispose of surplus material at his own cost.
9. A pre-warning PVC yellow tape 8-Inch wide and 300 microns thick (LDPE) shall
also be laid. The warning tape shall be printed in RED letter (IN ENGLISH AS
WELL AS GUJARATI) as “CAUTION: 11000 VOLTS PGVCL CABLE” and to
be placed at about 300 mm To 450 mm depth from ground level along the route
10. Trench route is to be made as per instructions of concerned Engineer-in-
Charge and then laying of cable in this trench accordingly.
11. Cable Laying with Mechanical Boring across the Road without disturbing the
asphalt is to be done instructions of concerned Engineer-in-Charge with prior
approval and work is to be executed as per Specifications in Schedule B only.
12. For Cable kit Make (Brand) Bidder has to submit any NABL accredited Lab
Type test certificate not older than Seven years and as per relevant IS
13573:2011 with latest amendment if any along with sample before installation
of cable kit at concern Division office. GTP is to be submitted with Technical
Bid. The Cable kit must be as per relevant IS -13573- 1992, IEC 60502, IEC-
13. If any Hard Rock area is encountered during the digging of Trench, Bidder must
have all the modernized equipment i.e. Erath Cracker JCB etc. to execute the
required Trench. Such area must be certified by a formation of Committee at
Division Level headed by Executive Engineer and to be executed in presence
of Engineer-in Charge.
IS 1255-1983 is to be followed for the depth of trench in such area.
14. Route Markers are to be installed at every 100 Meters length as per
specifications in Schedule B The marker should incorporate the following
relevant information:
1) The name of the Company – PGVCL.
2) Voltage – 11 KV Cable
3) Distance of cable from the marker
The interval should be maximum 50/100 meters (As per EIC instructions and
requirements) between two markers. It shall also be put at bends, curves, road
crossing, Cable Joints etc. of cable route as per requirement over and above
specified distance.
15. Empty Drums are to be credited at PGVCL respective stores at Bidders cost
and Risk after successful completion and Execution of work. Otherwise
Recovery will be proposed as per Section V Clause No.
16. After Laying of Cable in Trench and filling of all type Cable Box and Joints,
testing must be carried out with help of Voltage Surge Testing Kit as per IE Act
by applying 22 KV for continuous Five Minutes and Cable must hold the
satisfactory Results. Bidder must have such testing facility. Following Pre
commissioned Tests are also to be carried out.
a) Insulation Resistance of each cable drum length after laying and before
b) Before laying of cable, tests for detection of damage to outer sheath, if any.
c) After laying each cable with end termination shall withstand a voltage of
KV DC for one minute between each phase to phase & phase to cable earth.
d) Test for 5 min. with system voltage applied between the conductor and the
e) Continuity & Phase confirmation
17. During the Execution if any deficit found in allotted material OR in case of any
theft of PGVCL allotted material, then PGVCL will recover the cost of such
material from Bidder as per the prevailing Market Rates.
18. No any Advance Payment will be made after issuing of Order.
19. PGVCL will be not responsible and liable for the material supplied by the
20. During Execution of work for Trench and Cable Laying authorized
representative of Bidder who is in knowledge of Engineer-in-Charge must
remain present.
21. Bidder must have to submit the List of all related Equipment and Testing facility
necessary for the Tendered work while quoting the Bid.
22. PGVCL reserves the right to change/modify/alter/addition in condition in case of
any dispute and holds the power to decide the final verdict.
23. GST as per prevailing rates are applicable to Bidder for this work.
24. In case of any Disputes, Superintending Engineer of Concerned area is the
final Authority to take any Decision.
25. Work may be required to be executed in any 66/132/220KV Sub-Stations also.
26. Necessary shutdown for connection/jumper of UG cable with existing network
will be provided as per availability or convenience of the PGVCL which shall be
acceptable to the contractor & contractor shall try to complete the work in
27. All the sundries material like Clamps, Screws, nuts, bolts, nails etc. is at
Contractor’s cost.
28. Work is to be performed as per Drawing No. PGVCL/Tech/UG cable/01/14-15
and PGVCL/Tech/UG cable/02/14-15 are attached in Section XI.
2.0 For Overhead Line
1. Bidder has to maintain the records of allotted Conductor Drum with actual
Conductor length. Conductor length must be measured before Stringing.
2. For erecting poles the pits should be digging by using Pole Errection
Devise (PED Machine). Where ever it is not possible to use the PED
machine in the area lick hard rock, small streets etc. the permission of
the engineer in charge shall be obtained for digging of pits as per the
conventional method.
3. Stringing, installation of Fabrication, switches, distribution boxes, must be
done as per standards and esthetically.
4. Earthing of Poles and Transformers must be as per Drawings and RE
Standards. The Coal and Salt composition must be followed as per rules.
The Earth Pit must be kept at a distance mentioned in Standard form the
Pole. Earth Pit must be as per Drawing.
5. Concreting of Poles/Guys are to be carried out as per site situation and as
per instructions of Engineer –In-Charge only.
6. Construction of Transformer Structure must be as per standard with all
required accessories like LA, Box and Fuse etc.
7. Delta Type Three Earthings are compulsory for each Transformer Centre.
8. All the jumpers at Shackle Points/DP Structures must be of “D” Type only.
9. Wherever required, Guarding as per standard must be done.
10. Pole Concreting: Whenever concreting of poles (PSC/RSJ) required,
subdivision officers has to submit the proposal to the division office with all
justification before commencement of work. Committee of Executive
Engineer, DE Tech of Division office has to verify the submitted proposal and
decide whether concreting is required or not. After the approval of committee
work of concreting should be process as per specification attached herewith.
11. Bidder must have records of each work carried out with every material
inventory and account thereof issued to him.
12. Bidder must have the well-drawn sketch of each work and to be submitted
with Inventory sheet within 15 Days of work completion.
13. All the fabricated material and Girder Poles must be painted with Coats of
Silver Oxide and without this work, work completion will not be accepted.
14. Pole Numbering must be completed within week time as per Engineer-in-
Charge Instructions.
15. Bidder must have proper pole accounting for the work carried out by him. He
must have the location details from where the poles are lifted and where
these poles are utilized for each work. A separate Register is to be
maintained by him and details are required to be submitted with Inventory
and Sketch submission.
16. Necessary shutdown for connection/jumper of newly erected line with
existing network will be provided as per availability or convenience of the
PGVCL which shall be acceptable to the contractor & contractor shall try to
complete the work in minimum time.
17. Successful Bidder must have ensured for that the safety Gadgets are issued
to his Labor, by him, and required regulations of Safety will be followed
while carrying out the line erection work.
18. The Work for the erection of Poles, Guys, Earthing, Transformer and
Concreting, Stringing and Guarding must be done as per attached
Specifications and Drawings.
19. The material which is dismantled from site during the execution of work must
be credited to respective Divisional stores immediately after completion of
work with complete inventory and measurement details and length to weigh
conversion calculations.
20. Any violation of Electricity Act 2003 Section No. 136 & 137, necessary
action will be initiated against the Contractor
21. In case of any Disputes, Superintending Engineer of Concerned area is the
final Authority to take any Decision.
General Instructions to the successful bidders
1. Letter of Intent (LOI) / Letter of Acceptance (LOA) shall be issued to the
successful Bidders indicating the quantity allocated to them and the security
deposit amount to be deposited by them with PGVCL. Short listed Bidders will be
required to deposit the requisite security deposit within 15 days from issuance of
2. Security Deposit:
2.21 Security deposit will be accepted by RTGS/NEFT to the details of bank
account is the details of bank account is SBI, IFSC code; -SBIN0060070 and name
of account holder _ Paschim Gujarat Vij Company Limited or Bank Guarantee
(BG)from Nationalized / Scheduled Banks as per Govt. GR No. EMD / 10 /
2014 / 570 / DMO dated 01.04.15 will be acceptable.
2.22 The successful Bidders will be required to deposit the requisite security
deposit within 15 days from the date of issuance of LOI / LOA of an amount
equivalent to 5 % of the value of the work to be allotted to him and as
mentioned in LOI / LOA.
2.23 In case, if the Bank Guarantee is furnished / submitted, it should have a
Clearone time validity till the completion of awarded work of this work order.
Bank Guarantee for interim period will not be allowed. Security Deposit shall
be suitably extended time to time as per requirement.
2.24 If by any reasons the completion period of this work order is extended, then
supplier should undertake to renew the Bank Guarantee at least one month
before the expiry of the validity failing which PGVCL will be at liberty to
encase the same. CORPORATE GUARANTEES NOT ALLOWED.
2.25 No interest will be paid on the Security Deposit.
2.26 In the event of awarding the order of additional quantity, the successful
Bidders will be required to deposit additional Security Deposit on prorate
basis within two weeks of the issuance of LOA /LOI for the additional order
2.27 In the event of failure to carry out work offered by successful Bidders and as
accepted by them while receiving the order within given time period, will lead
to forfeiture of the Security Deposit up to 100% and will lead to
disqualification of the bidder to transaction business with PGVCL for at least
TWO years or the time duration as may be decided by the Managing
Director, PGVCL.
2.28 Security deposit will be returned on after completion of awarded work.
2.29 If the successful Bidders fails to pay security deposit within given time limit
then the letter of intent will stand cancelled. EMD amount will be forfeited in
favour of PGVCL without any notice or and action for “Stop deal” will be
initiated as decided by tender inviting authority.
3.0 SIGNING AGREEMENT
The successful Bidders will have to sign an agreement, within 15 days from the
receipt of LOI/LOA, on Stamp Paper of Rs300/-as per Company’s rules in the
prescribed form of the P.G.V.C.L. attached with this Tender. The cost
Rs.300.00 of the Stamp Paper will have to be borne by the successful Bidders.
4. For the Tendered work, other than turnkey work, entire material will be issued
by PGVCL. Any other related material required to carry out work mentioned in
Schedule A is to be brought by Bidder. No any extra cost will be paid towards
5. Successful Bidder has to follow all the rules and Regulations of Work Safety.
Required tools and Tackles for Safety are to be arranged by Bidder only.
6. Bidder is responsible to any type theft/damages of Company’s material and
also responsible to any type damages to any property and any kind fatal/non-
fatal accidents to anybody during the execution of work. Insurance of all
workers is compulsory, who are involved in Execution of Tendered work. There
will be no any financial liabilities of PGVCL for damage charges paid such way
Copy of valid Labour Insurance Policy in the name of bidder is to be submitted
with Tender Documents.
7. Rules and Regulations of PGVCL Works and Contracts Book are abided to
8. Work must be completed in in specified Schedule narrated in the Tender. If
concerned Engineer not satisfied with quality of work, no any Time limit
extension will be granted and Penalty with applicable GST and other taxes in
force at that time will be levied on delayed portion of work.
9. Agreement must be executed within 15 (Fifteen) Days from the date of issue of
LOA. Security Deposit (In form of DD/BG) and Insurance Policy is also to be
submitted with Agreement within this time limit i.e. 15 (Fifteen) Days.
10. Remaining material is to be credited at Respective Stores of PGVCL within a
month after completion of work.
11. Agreement and Indemnity Bond is to be executed on Rs. 300/- Stamp Paper
and cost of stamp paper is to be borne by Bidder. Solvency Certificate is to be
submitted as per PGVCL rules and Tender Condition.
12. Bidder is solely responsible for the material supplied by PGVCL.
13. Coal and Salt are to be brought by Bidder at his own expenses, for earthig
work, and work to be done as per PGVCL rules and RE specification for this
14. Work is to be carried out in presence of PGVCL authorized representative and
to be duly certified also.
15. No idle labour charges will be paid by the PGVCL in case such occasion of idle
labour arises, due to want of any materials or any other situations.
16. PGVCL have full rights to accept or reject the offer received against the Tender.
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED
1. COMPLIANCES WITH LAW:
The Contract shall in all respects be interpreted in accordance with the laws in
force in India, including any such laws passed or made or coming into force
during the period of the Contract.
2. Wages to be paid at the time of payment etc.by the contractor
2.1The successful bidder shall pay minimum prevailing rates per day, as may be
specified here after, or rates fixed under the Minimum Wages Act, whichever is
higher. The wages of every contract labour employed by him under this
contract shall be paid by him before the expiry of 7th day of the month
irrespective of which the wages are payable i.e. wages of a last month have to
be paid by him in the first week of the next month). The contractor shall have
to make wages to his workers through bank only. The agency shall have to
submit the copy of a letter given to the Bank advising for crediting wages in
individual account of the workmen along with photocopy of the cheque showing
total payment to be made to all such workmen whose accounts are operated in
that branch. (If there is more than one Branch, the agency will have to submit
separately for each branch.)
2.2 The successful bidder shall give his telephone number and address to the
company so that in case of labour trouble etc. the contractor can be
contacted. The contractor shall arrange to have his office outside the factory
premises and the contractor shall keep himself present through the work
3. Persons below the age of 18 years shall not be deployed for the said work.
4. No female worker shall be employed in the night shift between 07.00 p.m. to
5. Identity cards as prescribed under the factories Act/Shops and establishment
Act (As the case may be applicable) with Photo affixed thereto, for
identification.
6. The successful bidder shall maintain a valid Labour license under the
contract labour (regulation and abolition) Act for employing necessary
manpower required by them. In absence of such license, the contract shall
be liable to be terminated without assigning any reason thereof.
7. The successful bidder shall at his own expenses comply with all labour laws
and keep the PGVCL indemnified in respect thereof. Some of the major
liabilities under various labour and industrial laws which the Contractor shall
comply with below conditions.
7.1 Payment of contribution by way of employer's contribution towards provident
fund, administrative charges etc. at the rates made applicable from time to
time by the Government of India / Government of Gujarat or other statutory
7.2 Payment of deposit in respect of each contract labour at the prevailing rate
with the office of the commissioner of labour as per the Contract Labour
(Regulation and abolition) Act.
7.3 License fee as prescribed under the contract labour (Regulation and
abolition) Act rules framed there under depending upon the number of
7.4 Paid leave facility and wages as per the provision of the Factories Act at the
rate of one day for every 20 days of working.
7.5 Payment of retrenchment compensation, Notice pay and other liabilities as
per industrial Dispute Act. Any payment to the Contractor's employee arising
out of any claim of disputes under the Industrial Dispute Act 1947 or any
other labour Laws.
7.6 Payment of compensation in case of accidental death or injury as per
Employee's compensation Act.
7.7 Maternity leave as per the provisions of the Maternity Benefit Act.
7.8 In case, PGVCL becomes liable to pay any wages or dues to any manpower
deployed or any government Contractor under any of the provisions of the
Minimum wages act, Payments of wages Act, Employee's compensation Act,
Contract Labour regulation abolition Act, Employee provident fund or any
other law due to act of omission of the Contractor, the PGVCL may make
such payment and shall recover the same from the successful bidder's Bill.
7.9 If the PGVCL is caused to pay under any law as a principal employer such
amount as may be necessary to cause of observe, or for non-observance of
the provisions stipulated in the notifications/byelaws/Acts/Rules/Regulations/
including amendments. If any, on the part of the Contractor, the PGVCL shall
have the right to deduct any money due to the successful bidder under this
contract or any other contract with the PGVCL including his amount of
security deposit for adjusting the payment. The PGVCL shall also have right
to recover from the Contractor any sum required or estimated to be required
for making good the loss or damage suffered by the PGVCL.
8. Employee's compensation fund and employer's liability insurance: -
The successful bidder shall cover all his employees under employee's
compensation fund and under the liabilities insurance. The Contractor will
arrange insurance policies for arranging payment to his staff injured / met with
accident (Fatal / nonfatal) on duty of sufficient amount as per Labour laws. In
case of any such happening Contractor will be liable for any other payment to
workers / staff engaged as per existing rules. Contractor will not make any such
payment to the Contractor's staff or any compensation etc. during the pendency
of the contract.
9. Following Salient features of some major laws are applicable to establishments
9.1 Employee PF and Misc. Provision Act
9.2 Payment of Gratuity Act
9.3 Maternity Benefit Act
9.4 Equal Remuneration Act
9.5 Payment of Bonus Act
9.6 Industrial Dispute Act
9.7 Industrial Employment (Standing orders) Act
9.8 Trade Union Act
9.9 Employees compensation Act
9.10 Contract Labour (Regulation and abolition) Act
9.11 Child Labour (Prohibition and regulation) Act
9.12 Inter-state migrant workmen's (Regulation of Employment and
conditions of service ) Act
9.13 Minimum wages Act
9.14 Payment of Wages Act
9.15 Factories Act
9.16 Shops and Est. Act
9.17 The Employees’ State Insurance Act and the scheme ,
The above are some of the major liabilities of the Contractor in
addition to other liabilities prescribed under the various labour laws, in
force from time to time, from statutory authorities like GOI-GOG,
which the Contractor shall have to comply with.
10. It should be ensured that before commencing the said work, the successful
bidder should submit the details of their labourer such as a full name, address
and age with proof and subsequently changes of workers details are submitted
11.Thesuccessful bidder shall employ adequate number of an experienced staff at
site for daily supervision and for maintenance of various register and records
required under the law and contract. No payment for supervision shall be
12. PGVCL does not accept any responsibility as Factory Act, Minimum Wages Act,
Workmen’s Compensation Act, Insurance Rules etc. or any other act, rules or
regulations that have to be observed by the contractor for carrying out the work.
13.The contract will be governed by the company as per works terms & conditions
of the company.
14. EMPLOYMENT OF LABOUR:
14.1 Persons below the age of 18 years shall not be employed for the
work. No female worker shall be employed in the night shift between
07.00 p.m. and 06.00 a.m. next day.
14.2 Contractor shall maintain a valid labour license under the Contract
Labour (Regulation and abolition) Act for employing necessary
manpower required by him. In the absence of such a license, the
contract shall be liable to be terminated without assigning any reason
thereof. Contractor should also employ qualified and experiences
persons as per requirement of Electricity Act and rules for carrying out
supply and erection work under this contract.
14.3 In case PGVCL becomes liable to pay any wages or dues to labour or
any Government agency under any of the provisions of the Minimum
Wages Act, Payment of Wages Act, Employee Compensation Act,
Contract Labour Regulation Abolition Act, Employee Provident Fund
or any other law due to act of omission of the Contractor, PGVCL may
make such payment and shall recover the same from the Contractor’s
15. PROVIDENT FUND AND FAMILY PENSION SCHEME
The Contractor shall submit along with his bills (month wise) a Statement
regarding deduction against employees Provident Fund and Family Pension
Scheme in respect of each concerned employee The contractor's
contribution and the workers’ contribution towards Provident Fund and
Family Pension Scheme shall be done at the rate made applicable by the
Government from time to time and deposited by the contractor with Regional
Provident Fund Commissioner, Rajkot.
16. DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit 1.2% of the wages in respect of
employees who are members of the Provident Fund as the contribution to
the Deposit Linked Insurance Scheme with Regional Provident Fund
Commissioner, Rajkot.
17. ADMINISTRATIVE CHARGES
Administrative charges for maintaining Provident Fund Account shall be
deposited by the Contractor with Regional Provident Fund Commissioner,
Rajkot at the rates applicable.
18. PAID LEAVE FACILITY
Paid Leave Facility at the rate of one day for every twenty days worked by
the Contract Labour shall be provided by the Contractor to his, workers. He
shall maintain Leave Records, Leave Cards for individual labourer which
shall be duly verified, approved and certified by the Authorized Officer of
PGVCL. Remuneration for such leave period shall be fully borne by the
19. Workmen’s Compensation and Employer’s Liability Insurance
Insurance shall be affected for all the Contractor's employees engaged in the
performance of this contract.
20. Wages to be Paid & Time of Payment etc. by the Contractor
20.1 The Contractor shall pay minimum wages per day to his Labours/
Workers as per rates fixed under the Minimum Wages Act. The wages
of every Contract Labour employed by him under this contract shall
also be paid by him before the expiry of 7th day from the last day of
the month in respect of which the wages are payable (i.e. wages of a
month have to be paid by him in the first week of the next month).
20.2 Any default will result in cancellation of contact forthwith or else the
Contractor shall be punishable to the extent of Rs. 100/- for each day
20.3 The Contractor shall give his Addresses, Telephone Number and etc.
to PGVCL, so that, in case of labour trouble etc. the Contractor can be
contacted. The Contractor shall arrange to have his office within
working area and the contractor keep himself present throughout the
20.4 The separate P.F. code issued from RPFC is required to be taken by
the contractor and if it is not taken, offer of the firm will not be
considered. The attested documentary evidence to be submitted
along with the offer.
20.5 The contractors who are having separate P.F. Code No. from RPFC, it
should be ensured that all the contract labourers are covered under
the provident fund scheme and employees’ pension scheme and their
contributions are remitted regularly to the concerned RPFC. The
photo copies of the Chelan in this regard should be collected from the
concerned contractor and kept in the file of the concern contractor.
21. CONTRACTOR TO INDEMNIFY THE COMPANY
The successful bidder shall indemnify the Company and every member officer
and employees of the Company, also engineer in charge and his staff against all
actions, proceedings, claims of demands, coasts and expenses, which may be
made against the Company or Government for or in respective of or
performance of his obligation under the contract documents the Company shall
not liable for or in respective of or in consequence of any accident or inquiry to
any workman or other person in the employment of the contractor or his sub-
contractor and the contractor shall Indemnify and keep indemnified the
Company against all such damage and compensation and against all claims,
demands, proceedings costs, charges and expenses whatsoever in respective
thereof in relation thereto.
The Bidder’s insurance liabilities pertaining to the scope of Works are
detailed out in Clauses titled Insurance Bidder’s attention is specifically
invited to these clauses. Bid price shall include all the costs in fulfilling all the
insurance liabilities under the Contract.
The Contractor at his cost shall arrange, secure and maintain all insurance
as may be pertinent to the Works and obligatory in terms of law to protect his
interest and interests of the PGVCL against all perils detailed herein. The
form and the limit of such insurance as defined herein together with the
under-writer in each case shall be acceptable to the PGVCL. However,
irrespective of such acceptance, the responsibility to maintain adequate
insurance coverage at all time during the period of Contract shall be of
Contractor alone. The Contractor’s failure in this regard shall not relieve him
of any of his contractual responsibilities and obligations. The insurance
covers to be taken by the Contractor shall be in the name of the Contractor.
The Contractor shall, however, be authorized to deal directly with Insurance
Company or Companies and shall be responsible in regard to maintenance
of all insurance covers. Further the insurance should be in freely convertible
23. Any loss or damage to the equipment during handling, transportation,
storage, erection, putting in to satisfactory operation and all activities
to be performed till the successful completion of commissioning of the
equipment shall be to the account of the Contractor. The Contractor
shall be responsible for preference of all claims and make good the
damages or loss by way of repairs and/or replacement of the
equipment, damaged or lost. The transfer of title shall not in any way
relieve the Contractor of the above responsibilities during the period of
Contract. The Contractor shall provide the PGVCL with copy of all
insurance policies and documents taken out by him in pursuance of the
Contract. Such copies of documents shall be submitted to the PGVCL
immediately after such insurance coverage. The Contractor shall also
inform the PGVCL in writing at least sixty (60) days in advance regarding the
expiry/cancellation and/or change in any of such documents and ensure
revalidation, renewal etc., as may be necessary well in time.
24. The perils required to be covered under the insurance shall include, but not
be limited to fire and allied risks, miscellaneous accidents (erection risks)
workman compensation risks, loss or damage in transit, theft, pilferage, earth
quake, riot and strikes and malicious damages, civil commotion, weather
conditions, accidents of all kinds, etc. The scope of such insurance shall be
adequate to cover the replacement/reinstatement cost of the equipment for
all risks up to and including delivery of goods and other costs till the
equipment is delivered at Site. The insurance policies to be taken should be
on replacement value basis and/or incorporating escalation clause.
Notwithstanding the extent of insurance cover and the amount of claim
available from the underwriters, the Contractor shall be liable to make good
the full replacement/rectification value of all equipment/materials and to
ensure their availability as per project requirements.
25. All costs on account of insurance liabilities covered under the Contract will
be on Contractor’s account and will be included in Contract Price, However,
the PGVCL may from time to time, during the pendency of the Contract, ask
the Contractor in writing to limit the insurance coverage, risks and in such a
case, the parties to the Contract will agree for a mutual settlement, for
reduction in Contract price to the extent of reduced premium amount. The
Contractor, while arranging the insurance shall ensure to obtain all discounts
on premium which may be available for higher volume or for reason of
financing arrangement of the project.
26. The clause entitled ‘Insurance’ covers the additional insurance requirements
for the portion of the works to be performed at the Site.
27. The successful bidder will not be allowed to work after working hours except
in special case, if any.
28. The successful bidder has to engage required strength of skilled persons for
execution of work and proper supervisor to avoid complication and
unnecessary delay to complete work timely. The successful bidder will be
solely responsible for labour claims arising out of the labour employed for this
29. The successful bidder should furnish details of past experience of such job of
similar nature completed by him satisfactorily within the time limit in PGVCL
will be preferable.
30. The successful bidder will be abide by and fulfil all the terms and provisions
of the “Tender and contract” for works as applicable and in case of any
default there to the PGVCL Company shall forfeit the S.D. or any other action
as may be decided by Executive Engineer, Rural Division-2, Junagadh.
31. The successful bidder will certify that he has complied with the
provisions of Industrial & Labour Laws including PF Act, ESI Act etc. as
may be applicable. Copy of chalans of PF related to be submitted along
32. The successful bidder will governed by the PGVCL general conditions of
works contract. The Booklet will be available in the concerned office in any
working days. In the event of placing order, the successful bidder will be
bound to the terms & conditions of the booklet. All the usual terms and
conditions of the Company though the same might have not been mentioned
in this specification or contractor booklet will applicable to this contract, and
the decision of the Executive Engineer, Rural Division-2, Junagadh shall be
binding on the Contractor.
33. The Salary and wages payments to contractor’s labours/workers are
compulsory through Bank account only. This is requiring to follow strictly by
each contractor.
34. The Contractors have to use PED (Pole Erection Device) machine for
erection of pole, guy, and earthling for digging purpose compulsory. Violating
this norms may lead to cancel your awarded tender.
TAXES and Duties: GST
1. The prices are excluding GST and Cess as applicable which will be paid
extra on a given taxable goods and/or services. The amount and % of GST
and Cess as applicable should clearly be indicated separately. (GST/Cess
means all applicable Tax/Cess under GST Laws.
2. GST Laws means IGST Act, GST (Compensation to the State for Loss of
Revenue) Act, CGST Act, UTGST Act and SGSCT Act, 2017 and all related
ancillary legislations).
3. Contractor shall have to submit a C.A Certificate & duly authorized Signatory,
certifying that you have not claimed Refund of any applicable GST and Cess,
charged to COMPANY or shall not claim any such Refund, on a future date, from
the concerned Authorities and if, any Refund, in respect of such GST and Cess,
is claimed by you, it will be immediately passed on to the COMPANY, without
COMPANY making any specific Claim, for the same, either from the Department
4. The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if
the rate of GST and Cess is not mentioned clearly unless the bidder has opted
for Composition Scheme under GST Act, which should be clearly indicated in the
price bid. COMPANY may at its discretion consider such offer with presumption
of highest applicable rate of VAT/GST/Cess prevailing when the price quoted is
inclusive of GST and Cess.
5. If the Contractor has opted for the Composition scheme of GST, the same must
be clearly specified with valid Declaration & Certificate from Department. In the
event of withdrawal/cessation of the Supplier from Composition scheme during
the tenure of the contract, the rate mentioned in the price bid shall be final and
any additional GST will have to be borne by the tenderer. In no case additional
amount towards tax or otherwise will be paid / reimbursed to supplier/contractor.
Further Statutory Variation clause will not be applicable in case of Supplier /
Contractor has opted for Composition Scheme under GST.
6. Contractor should charge GST in Invoice at the rate as agreed to/mentioned in
acceptance of tender only and any deviation in the same shall not be accepted.
Further, any additional liability of GST (later on due to wrong mentioning of GST
rate, mis-interpretation of HSN/SAC Code, etc.) over and above as charged in
the invoice shall be borne by the Supplier/Contractor. However, any refund
received by the supplier / contractor on account of GST charged from the
company; such refund shall have to be passed on to the company, along with
interest if any. Such refund along with interest needs to be passed on suo-moto
by the contractor.
7. Further, the Company has a right to recover the amount of GST along with penal
interest at the rate of 15% per annum if GST charged is not paid/short paid to the
government or fail to upload the details or uploads inaccurate particulars on
GSTIN portal by the Supplier / Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the
contract, the provision of GUVNL’s statutory variation clause shall apply.
8. INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due
to inclusion of any other additional item of their inputs / input services under the
ambit of the Input Tax Credit provisions under the GST Act, subsequent to the
date of submission of the offer, the same should be passed on to COMPANY and
you should inform such changes to COMPANY from time to time.PGVCL’s GST
Registration No.is 24AADCP1453C1ZZ
9. TAXES, PERMITS & LICENCES:
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully
assessed against the PGVCL or the Contractor in pursuance of the Contract. In
addition the Contractor shall be responsible for payment of all Indian duties,
levies and taxes lawfully assessed against the Contractor for his personal income
& property only.
10. Income Tax -TDS
“Income-tax at source at the prevailing rate will be deducted from bills in
accordance with the provision of Income-Tax Laws and to that effect a certificate
will be issued to the contractor, however added as contractor has to submit
separate invoice for supply parts item as well as works part item separately,
otherwise TDS will be deducted on entire invoice value.”
11. Applicable welfare cess will be deducted from contractors each bill by PGVCL to
pay the same to the respective Govt. Department. Tax will be deducted as per
applicable statutory rules.
12. Statutory Deduction
Statutory deduction will be made as per applicable rules & rates for TDS,
GST TDS, welfare cess or any other taxes applicable time to time etc. All
other statutory liabilities towards this contract will be on your part.
11. STATUTORY VARIATION
Any statutory increase in the taxes subsequent to your offer if it takes place
within the contract period will not be considered except GST. No statutory
variation will be given for this work except GST.
12. The Contractor shall be fully responsible for deducting the P.F. of the
employees/labour Working under him as per statutory regulations and
depositing the same with the concerned authorities.
13. The Contractor shall comply with the relevant laws of India.
The Contractor shall be liable for and shall indemnify the Employer against
all losses, expenses or claims arising in connection with the death of or injury
to any person employed of the Contractor or his subcontractors for the
purposes of the Works.
TERMS AND CONDITIONS for successful bidders
1.1 The successful bidder shall be deemed to have carefully examined all the
papers, drawings, etc. attached & if has any doubt as to the meaning of any
portion of any condition / specification, etc. he shall before signing the
contract submit the particulars thereof to PGVCL in order that such doubts
1.2 The successful bidder shall not, without the consent in writing of PGVCL,
transfer, assign or sublet the work under this contract or any substantial part
thereof to any other party.
1.3 The execution of work should be commenced as per the instruction of the
Engineer In Charge as per actual requirement and should be completed
within the time limit thereafter.
1.4 PGVCL may at any time by notice in writing to the successful bidder either
stop the work altogether or reduce or cut it down. If the work is stopped
altogether, the Bidder shall only be paid for work done. If the work is cut
down the Bidder shall not be paid for the work as so cut down, but in neither
case shall be paid any compensation what so ever for the loss or profit which
he might have made if he had been allowed to complete all the work
included in the contract.
1.5 Notices, Statements and other communications sent by PGVCL through
registered post or telegram or telex or any other way of communication to
the successful bidder at his specified address shall be deemed to have been
delivered to the successful Bidder.
A The work shall be carried out by the successful bidder with prior
approval of PGVCL. Work carried out without PGVCL’s approval shall
not be accepted and the PGVCL shall have right to reject it and to
recover the cost from the successful bidder. He will be liable against
all losses, expenses or claims arising in connection with the death of
or injury to any person employed by the successful bidder or his
subcontractors for the purposes of the Works.
1.6 The successful bidder shall be responsible for any damage to the equipment
during transit due to improper or inadequate packing, handling, loading and
unloading. The cases containing easily damageable material shall be very
carefully handled. Adequate protection must be provided for outdoor storage
at site in tropical humid climate, wherever necessary. The successful bidder
without any extra cost shall supply any material found short inside intact
1.7 If the successful bidder neglects to execute the work with due diligence and
expedition or refuses or neglect to comply with any reasonable orders within
two days’ notice given in writing to the successful bidder and if he fails to
comply with the notice, then in such a case PGVCL shall be at liberty to get
the work or any part of it, executed through any other agency/Bidder in the
manner and on the terms it thinks proper. If the cost of executing the work as
aforesaid shall exceed the balance due to the Bidder, and the Bidder fails to
make good the deficiency, PGVCL may recover it from the Bidder in any
1.8 PGVCL shall have at all reasonable time access to the works being carried
out by the Bidder under this contract and stores where material issued by
PGVCL is stored i.e. MENDARDA-1 Division-2 Store. All the works shall be
carried out by the Bidder to the satisfaction of PGVCL.
1.9 The quantities mentioned in the accompanying schedule B are only
approximate same may decrease or increase. The PGVCL reserves the right
for revising or omitting any of the quantities. The actual work executed by
the successful bidder will be calculated at the rate given in the contract
schedule of the rates binding to the successful bidder.
1.10 No higher rate or revised rate will be application for the work, if work is held-
up/closed due to whatever so reasons.
1.11 Price shall not be changed subject to any upward/downward revision on any
account whatsoever through the period of contract.
1.12 All other general terms and conditions as prevailing in the PGVCL shall be
applicable to this work contract.
1.13 The successful bidder has to co-ordinate and co-operate fully with Engineer
In Charge and for execution of the works.
1.14 Either successful bidder or successful bidder’s authorized person should
contact our Engineer In Charge as well as Division Office, Rajkot Rural daily
for the availability of materials required for this work, failing to which this work
order shall be terminated without giving any notice.
1.15 The successful bidder has to maintain site register covering all aspects of
material received/utilized/dismantled for day to day work and has to obtain
signature of Engineer in Charge.
1.16 In case of any dispute doubt, the decision of Executive Engineer Rural
Division-2, Junagadh shall be unchallengeable and final, which will be
binding to the contractor.
1.17 Security Deposit (without any Interest) will be refunded after completion of
guaranteed period if any.
1.18 All legal complication of disputes is subject to Rajkot jurisdiction only.
1.19 A fresh and valid solvency certificate to the extent of 20% of the ordered
value will have to be produced by the contractor and party has to submit
attested copy of solvency certificate to the company before commencing of
1.20 The successful bidder will be solely responsible for any accident/damage
either to equipment or any human being during the time of execution of work.
1.21 Prior institution in writing for starting the job will be given by PGVCL for the
1.22 The successful bidder will have to make his own arrangement for required all
kinds of tools, tackles, required for the execution of work.
1.23 The cost of damages, if any will be recovered from the successful bidder’s
bill. The assessment of which will be done by Engineer In Charge in
consultation with division office, and his sole discretion and his decision shall
be binding to the successful bidder and shall be considered as final and
unchallengeable.
1.24 The successful bidder will have to give indemnity bond to PGVCL against
any possible claim of compensation for damage to Contractor’s equipment or
staff or any of third parties during the execution of work as per attached
1.25 The successful bidder will have to complete entire work, as mentioned in
Schedule-B of contract awarded to him, as per directive and instruction of
Engineer In Charge. If he fails to do so entire work will be carried out at the
risk and cost of Contractor.
1.26 The contractor must engage sufficient knowledgeable person round the
clock, exclusively for execution of work.
1.27 Specification in any items mentioned in tender are subject to change without
any prior notice and binding to the contractor.
1.28 The PGVCL shall deduct the Income-Tax and other taxes as per prevailing
rules of all relevant Govt. Authorities from the bill.
1.29 If the work is required to be carried out during fix outage then the successful
bidder has to deploy adequate man power, material, tools etc. well in
advance and has to complete the entire work during this specific outage
period only, failing to which Company shall be at liable to deduct the amount
of revenue loss due to prolong outage.
1.30 The tender include all minor accessories and items of work which may not
have been specifically mentioned in the specification / Schedule etc. but are
essential for completion of work. The contractor will not be eligible for any
extra payment in respect of such minor accessories and item of work.
1.31The successful bidder shall not refuse to execute the work order at any time
and it will be his sole responsibility to execute and complete this work as per
the instruction of Engineer In Charge.
1.32 For shortage of any materials issued by the PGVCL for the work, recovery
shall be made from you, on the basis of prices of the materials (prevailing on
the date of settlement of materials account) plus 15% supervision charges.
1.33The successful bidder has to carry out all the works in accordance with
revised and latest provision under I.E. Rule Act made there under and as per
instruction of Engineer In Charge.
1.34 All the materials issued by PGVCL shall be transported to the work site on
same day and to be preserved in safe custody failing to which PGVCL shall
initiate Police action. Similarly as per instruction of Engineer In Charge, you
have to credit the material at PGVCL store without any loss of time failing to
which PGVCL shall initiate Police action.
1.35 Any delay causing extension of outages shall be successful bidder’s
responsibility and appropriate amount (in term of Rupees) as decided by
Executive Engineer, Rural Division-2, Junagadh shall be recovered from
successful bidder’s bill as a penalty with applicable GST.
1.36 No tools, tackles, manpower, crane facilities etc. will be provided by the
1.37 The contractor has to follow all labour laws, safety rules and regulations. The
PGVCL does not take any responsibility in case of accident or injury to the
workers. The safety, security of men, materials and equipment shall be sole
responsibility of the contractor.
1.38The compliances of all Central / State Govt. Rules, safety and insurance rules
etc. and that of local body is a must condition for the successful bidder.
1.39The successful bidder shall specifically note that PGVCL will not pay any
extra amount towards any type of claim except for the description indicated in
Schedule –A. The party has to carry out all other additional required activities
/ work as directed by Engineer In Charge which is not mentioned in
Schedule but required to be completed as per the site condition and for this
work no extra payment shall be made by PGVCL.
1.40 The contractor should employ as a Supervisor with sufficient qualification
and experience who could supervise the execution of work throughout. He
should always be present on the site.
1.41The contractor shall be responsible for breakages, losses and a theft of
material during transit or erection after the materials issued from the stores
till the completion of work and is taken over by the PGVCL.
1.42 As regard damages to the materials, equipment, successful bidder himself
will be responsible. If there is any compensation to be paid in respect of
“WORKMAN” Compensation Act or any other statutory provisions, the same
will be paid by contractor directly. If he thinks fit, he may take necessary
insurance covering at his cost.
1.43 The successful bidder shall co-operate with the PGVCL for taking
measurement etc. as early as possible and he shall fulfil the entire
requirement which is necessary to finalize the accounts.
1.44 The competent authority can delete any item in schedule of the tender if he
feels that the rate quoted by the contractor for the item is abnormally high
when compared to the estimated rates.
1.45 The successful bidder shall not refuse to execute this work order at any time
and it will be his sole responsibility to execute and complete this work as per
the instruction of Engineer In Charge.
1.46 The erection work should be carried out according to the specification as
per instructions and programmed laid out by the Engineer in charge.
Contractor has to ensure safe shifting and erection of all
accessories/equipment as per standard norms.
1.47The Bidder shall not display the photograph of the work and shall not take
advantage through publicity of the work without written permission of
1.48 The inspection as mentioned in above clause No. 6 of this section by
PGVCL’s representative shall not relieve the successful bidder from full
responsibility of completing the work confirming to the requirement of this
1.49 Under the Contract, the Contractor shall be responsible for loss or damage
to the line and Electrical Equipment until the successful completion as
defined elsewhere in the Bid document.
1.50 All demurrage, wharf age and other expenses incurred due to delayed
clearance of the material or any other reason shall be to the account of the
1.51 The law applicable to the contract shall be the laws in force in India. The
courts of Rajkot shall have exclusive jurisdiction in all matters arising under
1.52 Before starting underground line work, bidder has to register location, path,
and details of works in CBuD (Call Before You Dig) application. After
completion of time limit of information, bidder should start work. This is
compulsory for diggers/excavators. Without using this application and
necessary information fill up in it, diggers will be responsible. As per
telecommunication act 2023 and wide section 42(5) and 42(7) of the act,
damage to telecommunication network is cognizable and non-bailable
offence and subject to damage caused and fine up to 50.0 lacs.
1.53 Bidders has to submit the copy of all type test reports in ace like HDPE pile,
indoor and outdoor cable kit, straight joints etc. and it is preferred to use any
make approved by GETCO.
2 PRICE EVALUATION:
No price preference shall be given on any account. All tenders must be
submitted firm price basis (Inclusive of all Taxes) and lowest evaluated bid in
the interest of the PGVCL, for the complete works covered under these
specifications and documents.
If more than one party is to be considered for placement of order, they will
have to match their end cost with end cost of L-1 technically acceptable
bidder. PGVCL (tender Inviting Authority) may go to the L-2, L-3 and so on
depending upon the requirement. If PGVCL (tender Inviting Authority) feels
that there is lack of serious competition or any other reasons, PGVCL (tender
Inviting Authority) may negotiate with the L-1 party. PGVCL’s (tender Inviting
Authority) decision shall be final and binding on all the parties.
3. QUANTITY DISTRIBUTION
3.1 For Erection & Maintenance work of HT/LT/TC:
The Contractors whether non-experienced / New or experienced /
Regular who have confirmed /fulfilled pre eligibility criteria , as
mentioned in Section 1 sr No 2 , will only be considered for price
evaluation. PGVCL will not consider the, price bid of any contractor
who does not confirm / fulfil the eligibility criteria as mentioned in
Section 1 sr No
3.11 While placing the order, the quantity distribution to each new
contractors / new firms shall be restricted up to 30 % of the
tender amount/Qty. for all such new bidders provided the price
of New contractor is lower than the regular/experienced
contractor. New contractor / new firm will be considered as a
regular contractor only after full filing experience criteria as
mentioned in Bidders qualifying criteria as per point no. 2 in
3.12 The new contractor will be asked to match the L-1 prices of the
new contractor only and the Regular contractor has to match
the L-1 price of the Regular/experienced contractor only.
But if there are no Regular contractor OR if the rate of Regular
contractor is very high, the above condition no. 2.11 shall be
suitably relaxed by PGVCL. L-1 regular contractor however will
get heavy weight age in order placement.
3.2 For laying of Under Ground Cable work:
3.21 While placing the order, the quantity distribution to each new
contractors / new firms , Section 1 sr No 2, shall be restricted up to
% of the tender amount/Qty. for all such new bidders provided the
price of New contractor is lower than the regular/experienced
contractor. New contractor / new firm will be considered as a regular
contractor only after full filing experience criteria as mentioned in
Bidders qualifying criteria as per point no. 2 in Section I.
3.22 The new contractor will be asked to match the L-1 prices of the new
contractor only and the Regular contractor has to match the L-1 price
of the Regular/experienced contractor only.
But if there are no Regular contractor OR if the rate of Regular contractor is very
high, the above condition no. 2.21 shall be suitably relaxed by PGVCL. L-1 regular
contractor however will get heavy weight age in order placement. The Contractors
who have confirmed /fulfilled pre eligibility criteria will only be considered for price
evaluation. PGVCL will not consider the price bid of any contractor who does not
confirm / fulfil the eligibility criteria. L-1 regular contractor however will get heavy
weight age in order placement.
4. IDENTIFICATION OF SITE:
Details of each location shall be made available through Executive Engineer of each
concerned Divisions under above locations. The planning for each location has to be
prepared in consultation of the Deputy Engineer of the concerned Sub Division under
whose control the work is allocated. The work must be carried out under Supervision
of concerned S/dn Head or Authorized Staff appointed by SDO.
5. ALLOTMENT OF MATERIAL AND ITS STORAGE
Required material for the work as per Schedule shall be allotted from any
store Centres of PGVCL jurisdiction and successful bidder has to take
delivery from these stores at his own only.
6. Contractor will be issued only 3 (Three) Sub work orders at a time. He will
be issued Fourth Sub Work Order only after the submission of Inventory
sheet with sketch and material account statement for any of the three
previously issued Sub Work Orders.
7. . TAKING DELIVERY AND INSURANCE:
7.1 The contractor has to keep all materials in safe custody and transport to
the respective sites and will be fully responsible for any damage to or loss
of all materials at any stage during transportation or erection till taking
7.2 The Contractor has to open site store/s (Maximum Two Nos.) and ensure
for safe custody of all the stored materials at his own cost. Material which
is to be allotted by PGVCL is to be carted, loaded and unloaded at
Bidder’s cost and risk from PGVCL’s respective Stores. PGVCL must
have access to such Store/s at any time of Day thought the contractual
period and Contractor will cooperate for verification of such store/s and
Inventory accounting. Failing to which actions may be initiated after
issuance of required Notice to the Contractor. Store address/s is to be
mentioned in the “General information about the Bidder” under Section I of
7.3 The Contractor shall have total responsibility for the entire materials
stored, loose, semi assembled and/or erected by him at site in his
custody. The Contractor shall make suitable security arrangements at
his own cost to ensure the protection of all materials, equipment and
works from theft, fire pilferage and any other damages and loss. It shall be
the responsibility of the contractor to arrange for security till the works are
finally taken over by the PGVCL
7.4 STORAGE-CUM-INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at
his cost to the extent of 100 % cost of materials, which are required to
complete the work. Contractor shall have to take comprehensive
insurance policy equivalent to the Order Value against any loss, damage,
theft, pilferage, fire etc. for the complete period of storage, erection and
commissioning up to the time of taking over by PGVCL. The Contractor
shall deal directly and pursue the claim with the Insurance Company and
shall be responsible in regard to maintenance of all insurance coverage as
well as for settlement of claim. The proof of insurance policy taken by the
successful Contractor shall be furnished to Engineer-In-Charge. In
absence of the above insurance policy, R.A. Bill payment will be withheld.
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will
be responsible to lodge, pursue and settle all the claims with the
Insurance Company for all items, materials and the PGVCL shall be kept
informed about it. Contractor shall replace the lost / damaged materials /
items promptly irrespective of the settlement of the claims by underwriter
and ensure that the work progress is as per agreed schedule. The loss, if
any, such replacement will have to be borne by the Contractor and
PGVCL will not entertain any claim / representation in this regard.
However it will be contractor's responsibility to insure the entire project is
taken over by the PGVCL.
8. Account of material issued
8.1 The successful bidder shall have to maintain accurate day to day item
wise account of use of issued materials which shall be got checked
from time to time by the Engineer In Charge of the Company. The
contractor will be responsible for custody and preserving the issued
materials till the work is hand over by the contractor after completion.
8.2 The successful bidder has to maintain site register, covering all the
daily details of material receipt and utilization, progress of work etc.
This register shall be checked and signed by Engineer In
Charge/Deputy /Executive Engineer, Concern Sdn./Division during the
site visit as per requirement and exigency of work if deem fit.
8.3 Material of one work should not be used in another work, except
only in exceptional circumstances with the approval of concern
Executive Engineer of respective division office.
8.4 After completion of the work against each Sub Work Order, all the
surplus materials issued by the PGVCL shall be returned by you to the
respective divisional /Regional stores only at contractor’s cost. Do not
credit this material in S/Dn store.
9. Work Completion Period:
9.1 In the event of placement of order, successful bidder shall have to
complete the ordered work within365 Days from the Date of issue of
9.2 Time limit of each sub work order should not be maximum up to 60 Days.
9.3 You shall have to complete the work as per the given time limit in sub order
and if any work order/sub work order is delayed beyond 120 days from the
eligible time limit mentioned. If you are failed to compete the work in this time
period then you/firm is not eligible for further orders till all allotted works are
The time will be extended as per provision laid dawn in Delegation of Powers
(Committee level) Clause no 5.0 Power relating to Contractors and sub
clause no 5.5 B as “Extension of time limit for works contract if applied
before or after the expiry of contract period with penalty”
9.4 WORKING DAYS: -
In case, it is not possible for the successful bidder to continue the work
either due to heavy rains or other reasonable causes, such facts should be
immediately brought to notice of the Engineer In Charge. If the reasons for
stopping the work are genuine the Engineer In Charge may ask the
successful bidder to start the work again as per condition. The period of
such stoppage will not be considered as a part of working days moreover the
successful bidder cannot claim compensation for such stoppage.
9.4 PROGRESS OF WORK
You will have to submit fortnightly progress report regularly in duplicate to
Engineer In Charge and Executive Engineer Rural Division-2, Junagadh. If
found that the work is unsatisfactory or not progressing as per schedule
then any action would be taken by the PGVCL as may deemed fit to see
that work is completed at the risk and cost of contractor. The completion
time allowed for each Sub work Order shall be strictly observed.
10. Time limit extension will be given, as per Clause No. 12of this section,
if material is not supplied in time and in any case of objection not
cleared in time. But if materials given in time and there is no any
objection, then no time limit extension will be granted and penalty with
applicable GST will be imposed as per rules.
11. CHANGE OF QUANTITY
11.1 During the execution of the Contract, the PGVCL reserves the right to
increase or decrease the quantities of items under the Contract but
without any change in unit price or other terms & conditions. Such
variations unless otherwise specified in the accompanying GCC
and/or Technical Specifications, shall not be subjected to any
limitation for the individual items but the total variations in all such
items under the Contract shall be limited to the extent of 30% (Thirty
Percentage) of the contract price by way of suitable amendment to the
11.2 The Contract price shall accordingly be adjusted based on the unit
rates available in the Contract for the change in quantities as above.
The base unit rates, as identified in the Contract shall however remain
constant during the currency of the Contract, In case the unit rates are
not available for the change in quantity, the same shall be subjected
to mutual agreement.
11.3 As this is an EPC contract, engineering work will be done by the
Contractor. Responsibility of material will be that of the contractor.
12. Penalty with GST:
12.1 Penalty with GST is levied on the time limit of Sub Work Orders. If
the work is not completed within the scheduled period as prescribed in
Sub Work Order, penalty + GST at the rate of 0.5 % per week or part
thereof on delayed portion subject to maximum up to 10 % of the sub
work order Value with GST as per applicable rate. This will be
deducted from the bills payable either against this contract or any bank
guarantee or any other amount payable under any other contract with
the PGVCL. For Penalty calculations or Time limit Extension, following
points are to be observed.
12.2 Start Date of Sub Work Order for Penalty Calculation will be the
Day/Date on which the first material is issued against the Sub
12.3 If material is not available in respective stores then “NO STOCK”
stamping by Store In-charge/Store Keeper must be taken against the
particular item by the contractor.
12.4 In Case of non-availability of Material, contractor must visit the
respective store every fortnight and no stock material details are to
be submitted to respective Executive Engineer and concerned SDO.
12.5 TLE of Sub work order can be granted on the basis of above such
documents produced by Contractor.
12.6 Time limit Extension must be given as per F &A Letter No.
PGVCL/F&A/5083/14-06-2017 and PGVCL/F&A/745/11-06-2018.
12.7 At the time of submission of Bill against SWO, all such Documents are
to be submitted by contractor for waiver of Penalty if applicable.
12.8 Time limit of Annual Work Order should be maximum up to 365 Days.
13. During the execution of Work, if Contractor/Labour are found violating OR
Braking the Safety rules and Regulations, then Engineer-in-Charge will serve
the warning Notice on first Instance. On second Instance the amount of
Fine will beRs. 500.00 or 0.1 % of amount of SWO (Whichever is high).
Even If after above two instances, still Contractor found breaking of Safety
Rules and Regulations then Procedures for Stop dealing must be initiated
against him as per rules and regulations.
14. Payment terms shall be as follows:
14.1 Payment will be made against Invoice value and shall be paid against actual
execution. The bills should be submitted in Duplicate to respective
Superintending/Executive Engineer, Circle/Division Office along with following
• Measurement Report of each site by PGVCL authorized inspection Officer (not
below the rank of Deputy Engineer)
• Material Accounting for work duly certified by Engineer-in-charge
• Work Completion Certificate duly signed by Contractor for which the Bill is
• Copy of Insurance Policy against the Material equivalent to the Order Value
as per Tender Condition No. No.7 under this Section.
• Contractor must submit the above documents within Fifteen (15) Days from
the actual date of completion of work to respective S/dn Office.
• DOP is to be followed for Payments against the Work Orders.
14.2 R.A. Bill shall be paid by the PGVCL, if it satisfy with the output of works
otherwise only final bill shall be paid.
14.3 The time limit for the work may be reduced and contractor should make
all his efforts to complete the work within stipulated time limit as may be
given by the Engineer In Charge depending upon emergency of work.
15.FORCE MAJEURE:
Force Majeure means any circumstances beyond the control of the parties
15.1War and other hostilities, (whether war be declared or not), invasion,
act of foreign enemies, mobilization, requisition or embargo;
15.2Rebellion, revolution, insurrection, military or usurped power and civil
15.3Ionizing radiation or contamination by radioactivity from any nuclear
fuel or from any nuclear waste from the combustion of nuclear fuel,
radioactive toxic explosive, or other hazardous properties of any
explosive nuclear assembly or nuclear components thereof;
15.4Riot, commotion or disorder, except where solely restricted to
employees of the Contractor.
15.5Neither party shall be considered to be in default or in breach of his
obligations under the Contract to the extent is that performance of
such obligations prevented by any circumstances of Force Majeure
that arise after the date of the Notification of Award.
15.6If either party considers that any circumstances of Force Majeure
have occurred which may affect performance of his obligations he
shall promptly notify the other party.
15.7Upon the occurrence of any circumstances of Force Majeure, the
Contractor shall endeavour to continue to perform his obligations
under the Contract so far as reasonably practicable. The Contractor
shall notify the Engineer-in-Charge of the steps he proposes to take
including any reasonable alternative means for performance, which
are not prevented by Force Majeure. The Contractor shall not take
any such steps unless directed so to do by the Engineer-in-Charge.
15.8 If circumstances of Force Majeure have occurred and shall continue
for a period of 180 days, notwithstanding, the Contractor may by
reason thereof, having been granted an extension of Time for
Completion of the Works, either party shall be entitled to serve upon
the other, 30 days’ notice to terminate the Contract. If at the expiry of
the period of 30 days Force Majeure shall continue, the Contract shall
16 TESTING & COMMISSIONING:
The successful bidder will ensure that completion of execution of work i.e. all
works connected with line having been completed correctly as per Indian
Electricity Rules & procedure. Any extra cost involved due to incompleteness
of work or bad workmanship found out subsequently shall be set right with
and by you at your own cost.
17 HANDING OVER OF ASSET
17.1 After successful completion of the lines and Transformers or any other
electrical equipment the entire newly created network is to be handed
over to the concern Deputy Engineer of PGVCL. The handing over
note covering the details of all the materials used and total work
executed must be signed jointly by the bidder and PGVCL Engineer.
Copy of handing over note must be attached along with bill.
17.2 The contractor shall arrange to hand over the complete work
immediately on completion of entire work.
If some material/Item is not installed/fixed for allotted work and as per SOR
by contractor due to non-availability of particular item/material for long
period of time and TLE cannot be approved for that work beyond certain
time limit Or such item if not required to be installed at particular location,
then Recovery is to be made as mentioned below for not carrying out that
work from SWO issued for that work.
Empty Wooden Drum (Assorted Sizes) : Rs. 325.00 per Drum
All work other than above must be completed by contractor and No
any other Recovery should be made other than above Work.
19. CONTRACT QUALITY ASSURANCE:
19.1 The Bidder shall include in his proposal the Quality Assurance Program
containing the overall quality management and procedures which he
proposes to follow in the performance of the Works during various phases as
detailed in relevant clause of the General Technical Conditions.
19.2 At the time of Award of Contract, the detailed Quality Assurance Program to
be followed for the execution of the Contract. PGVCL reserve the right to
inspect the work at any stage of contract i.e. during the execution and after
the execution of work.
19.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought
out items (if any) are being supplied. Such details shall be accompanied by
their list of previous supplies made performance reports etc. However, in
case of orders are placed, specific approval shall be obtained from the
PGVCL for the vendor supplied materials. The quality assurance program
shall be furnished for each material separately for approval.
20. TERMINATION OF CONTRACT ON PGVCL’S INITIATIVE
20.1 In case of any type of misappropriations, cheating or intention of cheating,
frauds, irregularities, malpractice, etc. the Managing Director PGVCL
reserves the right to cancel the order without giving reasons thereof and
forfeit the security deposit.
20.2 The PGVCL reserves the right to terminate the Contract either in part or in full
due to reasons other than those mentioned under clause entitled ‘Contractor’s
Default’. The PGVCL shall in such an event give fifteen (15) days’ notice in
writing to the Contractor of his decision to do so.
20.3 The Contractor upon receipt of such notice, as per point no.19.2 above, shall
discontinue the work on the date and to the extent specified in the notice,
make all reasonable efforts to obtain cancellation of all orders and Contracts
to the extent they are related to the work terminated and terms satisfactory to
the PGVCL, stop all further sub-contracting or purchasing activity related to
the work terminated, and assist PGVCL in maintenance, protection, and
disposition of the works acquired under the Contract by the PGVCL. In the
event of such a termination the Contractor shall be paid compensation,
equitable and reasonable, dictated by the circumstances prevalent at the
time of termination.
20.4 If the Contractor is an individual or a proprietary concern and the individual
or the proprietor dies and if the Contractor is a partnership concern and one
of the partners dies then unless the PGVCL is satisfied that the legal
representatives of the individual Contractor or of the proprietor of the
propriety concern and in the case of partnership, the surviving partners, are
capable of carrying out and completing the Contract the PGVCL shall be
entitled to cancel the Contract as to its in completed part without being in any
way liable to payment of any compensation to the estate of deceased
Contractor and/or to the surviving partners of the Contractor’s firm on
account of the cancellation of the Contract. The decision of the PGVCL that
the legal representatives of the deceased Contractor or surviving partners of
the Contractor’s firm cannot carry out and complete the Contract shall be
final and binding on the parties. In the event of such cancellation the PGVCL
shall not hold the estate of the deceased Contractor and/or the surviving
partners of the estate of the deceased Contractor and/or the surviving
partners of the Contractor’s firm liable to damages for not completing the
21. ARBITRATION:
Any question, dispute or difference whatsoever arises between PGVCL and
Bidder, in connection with this agreement except as to matters, the decision
for which has been specifically provided, either party may forthwith give to
the other notice in writing of existence of such questions, dispute, difference
and the same shall be referred to the sole arbitration of a person nominated
by Managing Director, PGVCL. This reference shall be governed by Indian
Arbitration Act prevailing at the time of dispute and the rules made there
under. The award in such arbitration shall be final and binding on all the
parties. Work under the agreement shall continue during the arbitration
proceedings unless the PGVCL or the Arbitrator directs otherwise.
The technical information, drawings, specifications and other related
documents forming part of the enquiry or Contract are property of PGVCL
and shall not be used for any other purpose, except for the execution of the
contract. All rights related to the technical specifications, drawings and
records are reserved by PGVCL only and no part or partial should be
reproduced, copied or alter without prior permission to PGVCL in writing. In
the event of the breach of this provision, PGVCL can claim the damages
caused by such events.
23.Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following
23.1 Has submitted fake, false or forged documents/certificates
23.2 Has revised/withdrawn price bid after opening of Techno:
commercial bid, until and unless it is sought for
23.3 Has refused to accept Letter of Acceptance/Purchase
Order/Work Order after the same is issued by the Company
within the validity period and as per agreed terms and
23.4 Has committed breach of contract or has failed to perform a
contract or has abandoned the contract
23.5 Has failed to provide suitable expertise for the work as per
prescheduled program
23.6 Has failed to submit all the necessary Test reports/documents
within time schedule / as per Company's time limit, as
mentioned in the LOA, if the Letter of Acceptance (LOA) is
placed subject to submission of type reports / documents to the
23.7 Has indulged in construction and erection of defective works.
23.8 Has substituted materials In lieu of materials supplied by the
Company or has not returned or has short returned or has
unauthorised disposed of materials/ documents/ drawings/
tools or plants or equipment supplied by the Company
23.9 Has involved in malpractices such as bribery, corruption, fraud,
canvassing and pilferage
23.10 Has unauthorised obtained official company information or
copies of documents, in relation to the Tender/Contract
23.11 Has failed to follow the stipulated mode of communication, if
specified by the tendering authority/ purchaser.
23.12 Any other ground for which in the opinion of the Company
makes it undesirable to deal with the Firm, and
23.13 In case the State Government directs the Company to place a
firm in stop dealing/ banned for business dealing/ blacklisting
23.14 The firm, stop deal and/or banned for business dealing and/ or
blacklist by GUVNL or any subsidiary Companies of GUVNL
shall be considered as a stop deal and/ or banned for business
dealing and/ or blacklisting for all Companies.
24. Effect of putting a proprietor/firm for Stop dealing/Banned for
business dealing are as below:
24.1 The proprietor/all the partners/directors of the stop deal/
banned for business dealing/ blacklisting firm shall also be
considered for stop deal/ banned for business dealing.
24.2 Once the name of the firm and/ or proprietor/ partner/ director
of the firm appears in the list of Stop dealing / Banned for
business dealing in any Company of GUVNL and its Subsidiary
(i)No enquiry shall be issued to a firm.
(ii) No bids / tender shall be considered for evaluation and
the bid submitted by the Firm shall be returned.
24.3 Action to be taken, when a Firm and/or proprietor/ partner/
director of the firm is put on Stop dealing/ Banned for business
dealing by GUVNL or any of its subsidiary Companies, during
tender process: -
(i) Before opening Technical bids, the bid submitted by the
Firm will be treated as “Disqualified Bid” and
automatically stand as “Rejected Bid” at the time of
scrutiny of Preliminary / Technical Bid.
(ii) After opening Technical bid but before opening the price
bid, the price bid of the Firm should not be opened and
the bid submitted by the Firm will be treated as
“Disqualified Bid” and automatically stand as “Rejected
Bid” at the time of scrutiny of Technical Bid.
(iii) After opening of price bid, the offer of the Firm should be
ignored and will not be further evaluated. The Firm will
not be considered for issue of order even if its price is
the lowest. In this situation, the next lowest bidder shall
be considered as L1.
(iv) The BG/EMD submitted by the Firm with tender should
be returned after obtaining confirmation from GUVNL
and its other subsidiary Companies that there are no
outstanding dues recoverable from the firm.
24.4 If a Firm is put on Stop dealing / Banned for business dealing in
one Company and is already executing work and/ or Letter of
Acceptance/ purchase order awarded to them by another
Company, then the firm should be allowed to complete such
awarded work / supply.
24.5 The amount of EMD/SD/ any payment against supply withheld
at the instance of GUVNL or any of its subsidiary Companies
shall be appropriated against the dues recoverable from the
firm by GUVNL or any of its subsidiary Companies. EMD/ SD/
PG in the form of bank Guarantee shall be en-cashed and
24.6 The Stop dealing/ Banned for business dealing shall be Firm-
specific and when a Firm is put on Stop dealing/ Banned for
business dealing, all the manufacturing works of the Firm shall
be on Stop dealing/ Banned for business dealing for GUVNL
and its Subsidiary Companies & for all Services of the Firm.
24.7 If the Firm placed on Stop Dealing/ Banned for business
dealing is a Proprietary Concern, then all the Concerns of the
same Proprietor shall also be considered to be on Stop
Dealing/ Banned for business dealing.
24.8 The Board of Directors of the concerned Company may
however, if he considers it to be in the interest of the Company,
remove the ban in respect of any specific Service from any
Contractor for that Company only.
25.Every bidder should, at the time of submission of bid, give a declaration
as per Annexure VI attached with this Tender, that bidder and/or proprietor/
partner/ director of the firm has not been placed on Stop dealing / Banned for
business dealing / blacklisting by GUVNL and it’s any Subsidiary Companies.
26. Conflict of interest among Bidders/ Agents
A bidder shall not have conflict of interest with other bidders for
particular quoted item. Such conflict of interest can lead to anti-
competitive practices to the detriment of Procuring Entity's interests.
The bidder found to have a conflict of interest shall be disqualified. A
bidder may be considered to have a conflict of interest with one or more
parties in this bidding process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any director indirect subsidy/ financial
stake from any of them; or
c) they have the same legal representative/ agent for purposes of this
d) they have relationship with each other, directly or through
common third parties, that puts them in a position to have access
to information about or influence on the bid of another bidder; or
e) bidder participates in more than one bid in this bidding process.
Participation by a bidder in more than one Bid will result in the
disqualification of all bids in which the parties are involved. However, this
does not limit the inclusion of the components/ sub-assembly/
assemblies from one bidding manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their
principal manufacturers, one agent cannot represent two
manufacturers or quote on their behalf in a particular tender enquiry.
One manufacturer can also authorise only one agent/ dealer. There can
be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent
on his behalf; and
2.Indian/ foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the
preparation of the design or technical specifications of the contract that
is the subject of the Bid;
h) in case of a holding company having more than one
independently manufacturing units, or more than one unit
having common business ownership/ management, only one
unit should quote. Similar restrictions would apply to closely
related sister companies. Bidders must proactively declare such
sister/ common business/ management units in same/ similar line
i ) Bidder shall not act in contravention/ violation to the provisions of
competition act, as amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration,
that bidder shall not have conflict of interest with other bidders for
particular quoted item, as above.
Annexures/BG/Agreement/Indemnity Bond
TIME SCHEDULE FOR COMPLETING THE WORK
(To be completely filled by the Bidder)
Name of the Bidder
Sr. No. Item Time required for work Mentioned in Tender
Details of work experience in last three years
(To be completely filled by the Bidder)
Sr. Name of the Work Description Ref. & Work Details of order
No. Company with full date of Order
address, phone, fax the order Value
• Copies of MAJOR Work orders along with Work completion certificates should be attached with
this information.
• If necessary, separate sheet may be used to submit the information
Vendor registration No: -_____________
Tender No: PGVCL/Tender ID-
Details of Pending Orders as on Bidding Date
(To be completely filled by the Bidder)
Reason for non-
Company with full Ref. & Work
Sr. completion with
address, phone, Work Description date of Order
No. Certification of Order
fax and name of the order Value
issuing Authority
• Copies of Resumes and appropriate certifications should be attached with this information.
• If necessary, separate sheet may be used to submit the information.
Tender No: PGVCL/Tender ID-
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. __________________________________, employee of PGVCL at
_______________________ (designation & name).
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives
employed or working with Paschim Gujarat VijCo.Ltd.at any of its offices or its parent Department
i.e. Energy & Petrochemicals Dept., Govt. of Gujarat.
Date: Sign. & Stamp of the Bidder
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified
below in this sheet. If there are no deviations offered, it should be clearly mentioned on this page.
Deviation offered to Chapter
No, Clause No. of the tender Deviation offered
List of Onsite Testing Facility (For the work of Laying of HT/LT Underground Cable)
(To be completely filled by the Bidder)
Sr. Name of equipment Date of purchase Date of calibration Utility
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
All bidders will have to furnish the following undertaking duly filled in signed and stamped for
each quoted item of the tender along with the Technical Bid.
M/s_________________________________________________ is not stop deal/black listed by
GUVNL and or any subsidiary companies viz. PGVCL/UGVCL/DGVCL/PGVCL/GSECL/GETCO for
the tendered item.
LIST OF TYPE TESTS REPORTS SUBMITTED WITH THE TECHNICAL BID
(For the work of Laying of HT/LT Underground Cable)
(Not Older than 7 Years)
Type Test Tests Carried Rating & Type / Results
Sr. No Report No. & out at (Name of Designation of Of the
Date Laboratory) Item / Equipment Tests.
List of Performance Certificate:
Name of the Authority by whom
Sr. No. Reference No. & Date Details of items
certificate is issued
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during Last Five Years
Sr. Type Of Accident Brief Reason for
Fatal/Nonfatal Affected
No. (Electrical/Mechanical) the Accident
Sign & Stamp of the Bidder
Sub: -UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR FRAUD OR
MISHANDALING OF MATERIAL
Ref: - Tender No: PGVCL/Tender ID -
M/s_____________________________________________ hereby declare we will provide
______ nos of labours to carry out this tenders scope of work. We are having Labour
Insurance Policy No.____________________ for ________ nos of our labours. We declare
that, as mention below table, we are having following safety gadgets of our own and they all
are in good condition.
List of Safety Gadget Unit owned by
2 Earthing Rod No
4 Safety Belt No
5 Hand Gloves for LT Pair
6 Hand Gloves for HT Pair
7 Other safety items
On Firm’s Letter Head
CERTIFICATE – “A”
I/We__________________________________________ authorized signatory of
M/s._________________________________________ is not related with other firms who
have submitted tenders for the same items under this inquiry / Tender.
• Seal of the Firm Signature of the Tenderer
• Place: With Designation
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.: Tender ID=
(Bank Guarantee on Non-Judicial Stamp Paper of Rs.100/-)
WHEREAS M/s. ____________________________________ (Name & Address of the Firm) having
their registered office at _____________________________________ (Address of the firms
Registered office) (hereinafter called the ‘Tenderer’) wish to participate in the tender No.
for____________________________________________ of (Supply/ Erection/Supply & Erection
Work) (Name of the material/equipment/Work) for Rural Division No-2, Junagadh, Paschim Gujarat
Vij Company Ltd. and WHEREAS a Bank Guarantee for (hereinafter called the “Beneficiary”)
Rs._____________ (Amount of EMD) valid till _________ (Mention here date of validity of this
Guarantee which will be 5 (FIVE) months beyond initial validity of Tender’s offer) which is required
to be submitted by the tenderer along with the tender.
We, __________________ (Name of the Bank and address of the Branch giving the Bank
Guarantee) having our registered office at ______________________ (Address of Bank’s registered
office) hereby give this Bank Guarantee No.________________ dated _________ and hereby agree
unequivocally and Unconditionally to pay immediately on demand in writing from the Paschim
Gujarat Vij Company Ltd. or any officer authorized by it in this behalf any amount not exceeding Rs.
to the said Paschim Gujarat Vij Company Ltd. on behalf of the Tenderer.
We ___________________________ (Name of the Bank) also agree that withdrawal of the tender
or part thereof by the Tenderer within its validity or Non submission of Security Deposit by the
Tenderer within one month from the date tender or a part thereof has been accepted by the
Paschim Gujarat Vij Company Ltd. would constitute a default on the part of the Tenderer and that
this Bank Guarantee is liable to be invoked and encashed within its validity by the Beneficiary in
case of any occurrence of a default on the part of the Tenderer and that the encashed amount is
liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of
____________________ (Mention here the date of validity of Bank) and shall not be terminable by
notice or by Guarantor change in the constitution of the Bank or the firm of Tenderer Or by any
reason whatsoever and our liability hereunder shall not be impaired or discharged by any extension
of time or variations or alternations made, given, conceded with or without our knowledge or
consent by or between the Tenderer and the PGVCL.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or
Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made only
by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is
restricted to Rs. __________ (Amt. of E.M.D.) (Rupees ____________________________________)
(In words). Our Guarantee shall remain in force till _________ (Date of validity of the Guarantee).
Unless demands or claims under this Bank Guarantee are made to us in writing on or
before_______ (Date of Validity of the Guarantee), all rights of Beneficiary under this Bank
Guarantee shall be forfeited and we shall be released and discharged from all liabilities there
Please Mention here Complete Postal Address Signature of the Bank’s Authorized Signatory
of the Bank with Branch Code, Telephone and with
Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are
(i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
FORM OF BANKER’S UNDERTAKING (For SD)
(Bank Guarantee on Non-Judicial Stamp Paper of .100/-)
We, Bank of ___________________________________ hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Paschim Gujarat Vij Company
Ltd. or any Officer authorized by it in this behalf any amount up to and not exceeding _______ (in
words) Rupees ___________________ to the said Paschim Gujarat Vij Company Ltd. on behalf of
M/s. _________________________________________________who have entered into a contract
for the supply/works specified below
This agreement shall be valid and binding on this Bank up to and inclusive of ______________ and
shall not be terminable by notice or by change in the constitution of the Bank or the firm of
Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made, given conceded
or agreed, with or without our knowledge or consent, by or between parties to the said within
written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or
Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made only
by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is
restricted to Rs.___________ (Rupees ___________________________ only). Our guarantee shall
remain in force until ____________________ (Date of validity of the Guarantee). Unless demands
or claims under this Bank Guarantee are made to us in writing on or before_______ (Date of
validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and
we shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Address Signature of the
of the Bank with Branch Code, Telephone and Bank’s Authorized Signatory with Official
Fax Nos. Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which
are (i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
This agreement is made at ___________the ___day of______month _______Year between the
Paschim Gujarat Vij Company Ltd. &__________________________ (hereinafter referred to as
“the Contractor “which expression shall unless excluded by or repugnant to the context included its
successors or permit assigns) of the one part and the Paschim Gujarat Vij Company Ltd. Having its
Regd. and Corporate Office at Laxminagar, Off Nanamava Road, Rajkot, 360004 (hereinafter called
“The Company” which expression shall unless excluded by or repugnant of the context include its
successors of assigns) of the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for the work
____________________, Dated ___________, hereinafter called “The works and more particularly
desorbed enumerated or referred to in the specifications, terms and
other letters and schedule of price which for the purpose of identification have been signed by The
Superintending Engineer/Executive Engineer,, Circle/Division, PGVCL on behalf of the Company, a
list where of is made out in the schedule here under written and all of which said documents are
deemed to form part of this contract and include in the expression “The works “wherever herein
used, upon the terms and subject to the conditions hereinafter mentioned.
And whereas the Company has accepted the tender of the contractors for the Maintenance &
Erection of HT / LT Line & T/C and Underground cable up on the terms and subject to the
conditions herein mentioned.
1.) The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein of therefore respectively or are reasonable
necessary for the completion of the works as mentioned and at the time in the manner and
subject to the terms conditions and stipulation contained in this contract and in
consideration of the due provision, executions, construction and completion of the works
agreed to by the contractors as aforesaid the company both hereby covenant with the
contractor to pay all the claims of money as and when they become due and payable to the
contractor under the provisions of the contract such payment to be made at such times in
such manner as is provided by the contract.
2.) The conditions and covenant stipulation here in before in this contract are subject to and
without prejudice to the right of the company to enforce for delay and or any other rights
whatever including the right to reject and cancel on default or breach by the contract of
the conditions and the covenant as stipulated in the general conditions specifications form
Or tender schedule drawing etc. attached with the Company LOA No.
3.) The Contractor will strictly follow the safety Rules and Regulations during the execution of
aforesaid work. The Contractor will also provide all required Safety Gadgets to his
Supervisors and labours to execute the work mentioned in Tender. On violating or breaking
the Safety Rules and Regulations, and if Supervisors/Labours are found without Safety
Gadgets, “The Company” reserves the right to take actions as per the terms and conditions
mentioned in Tender without any prejudice.
4.) The Company reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default’. The
PGVCL shall in such an event give fifteen (15) days’ notice in writing to the Contractor of his
decision to do so.
5.) The Contractor upon receipt of such notice shall discontinue the work on the date and to
the extent specified in the notice, make all reasonable efforts to obtain cancellation of all
orders and Contracts to the extent they are related to the work terminated and terms
satisfactory to the Company, stop all further sub-contracting or purchasing activity related
to the work terminated, and assist “The Company” in maintenance, protection, and
disposition of the works acquired under the Contract by the Company. In the event of such
a termination the Contractor shall be paid compensation, equitable and reasonable,
dictated by the circumstances prevalent at the time of termination.
6.) If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners dies
then unless “the Company” is satisfied that the legal representatives of the individual
Contractor or of the proprietor of the propriety concern and in the case of partnership, the
surviving partners, are capable of carrying out and completing the Contract “the Company”
shall be entitled to cancel the Contract as to its in completed part without being in any way
liable to payment of any compensation to the estate of deceased Contractor and/or to the
surviving partners of the Contractor’s firm on account of the cancellation of the Contract.
The decision of the Company that the legal representatives of the deceased Contractor or
surviving partners of the Contractor’s firm cannot carry out and complete the Contract
shall be final and binding on the parties. In the event of such cancellation the Company
shall not hold the estate of the deceased Contractor and/or the surviving partners of the
estate of the deceased Contractor and/or the surviving partners of the Contractor’s firm
liable to damages for not completing the Contract.
The contract value extent of supply delivery dates, specifications as other relevant matters may be
altered by mutual agreement and if so altered shall not be deemed or constructed to mean and to
effect or alter other terms and conditions of the contract and the contract so altered or revised
shall be and shall always be deemed to have been subject without prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month year first
1. Signed sealed and delivered by for and on
Behalf of the presence of name and address.
2. Signed sealed and delivered by for and on behalf
Of The Paschim Gujarat Vij Company Ltd
In consideration of the PASCHIM GUJARAT VIJ COMPANY LTD., herein after known as the
COMPANY having given contract for the work of _________________________________
__________________________, dated _______________ and all future contract that may be
awarded to me in the next one year and in terms of the condition in clause 33 of the COMPANY’s
tender and contract for work.
I residing at by this Bond bind myself responsible for and shall pay compensation to my workmen
payable under the workmen’s compensation ACT – 1923 (viii of 1923) hereinafter called the said
Act for death or injuries caused to the workmen engaged by this presents, if such compensation is
paid by the COMPANY as principal under such sub-section (1) of section 12 of the said Act on behalf
of me, to pay such amount of compensation on demand within 48 hours to the COMPANY that it
might have to spend as legal and other incidental charges in defending any suit or action arising out
of the death of injuries in regard to compensation paid to the workmen or heirs of the deceased
Now the condition of the above written Bond is such that any suit of action arising out of the death
or injuries to the workmen engaged by me. During the execution of work of said contract and all
future contracts that may be awarded to me in the next one year is filed by the worker against the
COMPANY, I shall imbrues to the COMPANY such sum that the COMPANY is required to spend as
legal and other incidental charges in defending such suit or action and also the amount that may be
ordered to be paid to the worker / or his heirs as compensation and that the above written bind
shall remain in full force and virtue till the COMPANY is required to defend such suit or action filed
by the workers and or heirs against the COMPANY. Further it is applicable on death of contractor
himself also. No any compensation will be claimed by legal heirs of contractor.
Signature of the Executant
Technical Specifications
TECHNICAL SPECIFICATIONS FOR THE WORK TO BE CARRIED OUT For erection work 11 KV and
L.T. Distribution lines and Transformer Centres
The work should be strictly as per specifications and approved designs of the PGVCL. The
inferior and unsatisfactory work is liable for rejection and to be rectified at the cost of contractor.
The work will have to be carried out as per programmed laid down by department and under the
entire instruction of engineer-in-Charge and contractor should employ supervisor who could
supervise the works through out and he should remain present on site. No tools & Tackles will be
supplied by the department.
(A)Erection of HT and LT Lines:
Site clearing and tree branches trimming which come in the way of line will be done by the
contractor at his cost. The Company will assist the contractor in getting necessary permission for
tree cutting etc. Any claim for compensation in above respect will have to be borne by
(B)Fixing: Pole Position:
The Points of pole structures, guys and earthing will be fixed by the department and will be
shown to the contractor. He should adhere to these locations in all circumstances unless
directed by the department to make any change.The Poles from One site to other site or at
proposed locations must be carted by loading on Tractor or Hand-Cart. The Poles shall not be
carted by toeing/Dragging with Tractor or Cart or with any other means.
(C)Pole setting:
Where poles are set in good solid ground the depth of pit shall be 1/6th of the height of the pole
and for grounds of any other nature. The pit must be size of 2 X 2 X 5 feet. The poles and guys
must not be set at the edge of cuts/at shore/embankment where the soil is liable to be washed
or eroded out of such setting should be avoided. While back filling, earth must be packed tight
and in no case earth be dumped to greater depth more than four inches without being rammed,
hard before the next layer is thrown in. Extra earth should be packed around the poles and
The cost of damage done to the pole during erection will be recoverable from the contractor.
No pole, which is out of plumb or out of alignment shall be accepted. The pole will be in his safe
custody till erected and he is liable to compensate to the Company the full cost of pole along
with supervision charges, if the pole is broken during erection, or stolen from his custody. He
should be able to render full account of the poles entrusted to him whenever the Supervising
Officer demands to scrutinizes the same.
(D)Erection of Complete single Pole Structure
Erection of single pole structure comprises of shifting of pole from the stacking place in the
village, excavation of pit, erection in position (with base plate where required), of 8/10 meter
PSC poles / 9 to 13 meter Steel Pole or any other suitable pole, fitting of clamps and cross arms
and fabricated materials, fixing of caution board, anti-climbing device etc. complete as per
drawing and specification inclusive of painting, numbering. Generally vertical formation will be
used on each pole. However horizontal formation will have to be used in special circumstances
as per instruction at Engineer in change.
(E)Double Pole (D. P.) Structure
Double poles structure such as for HT line tapping, Railway crossing, any other HT/LT or
telephone line crossing, terminal structure for distribution transformer centre comprises of
Excavation suitable pits and refilling of earth, erection in position of two Nos. of 8/10 meter PSC
poles / 9 to 13 meter Steel Pole or any other suitable pole, fitting of clamps, cross arms, bracing
cross arm bracing etc. as per drawing/ standards with mounting D.O. fuses/A.B. switches/HT
metering equipment’s etc., painting, Pole numbering, fixing of caution Board and anti-climbing
The D.P. must be properly aligned and must be in plumb. Special structure if included will be
erected as per drawing supplied. Each Shackle Points must have “D” type Jumpers only.
(F)Stringing of conductors
This includes stringing of stranded and solid bare conductor with fitting of necessary HT/LT pin
and strain insulators, binding on insulators, jumpers, the jointing in HT line will be done by
twisting sleeve joints as per standard practice. Care must be taken in handling the conductor to
protect against cuts, scratches or kinks. The conductor must not be drawn over rough or rocky
ground, when it is liable to be damaged. AAA/ACSR conductors must be drawn on wooden or
aluminium pulley only. Wastage and cutting should be avoided as far as possible. Not more than
3 % sag will be accepted in the materials account. The sag and spans will be maintained as per
drawing/standard. The cross arms insulators must be so fixed that neither tilts nor bands from
position. The sagging should be uniform for all conductors and uneven sagging will not be
allowed. The ground clearance to be maintained as per IE Rules 2010 Clause No. 58 as
mentioned below.
For lines of voltage not exceeding 650 Volts 5.8 Meters
Across a street For lines of voltage exceeding 650 Volts but not
exceeding 33 kV
For lines of voltage not exceeding 650 Volts 5.5 Meters
Along any street For lines of voltage exceeding 650 Volts but not
exceeding 33 kV
For lines of voltage up to and including 11,000 If bare - 4.6 Meter
Elsewhere than Volts If insulated- 4.0 Meter
along or across
any street For lines of voltage exceeding 11,000 Volts but
not exceeding 33 kV
An overhead line shall not cross over an existing building as far as possible and no building
shall be constructed under an existing overhead line.
Where an overhead line of voltage not exceeding 650 V passes above or adjacent to or
terminates on any building, the following minimum clearances as per IE Rules 2010 Clause
No. 60 from any accessible point, on the basis of maximum sag, shall be observed, namely:-
(i) for any flat roof, open balcony, varandah roof and lean-to-roof and Pitched Roof-
(a) when the line passes above the building a vertical clearance of highest part of building
immediately under such line 2.5 meters from the highest point,
(b) When the line passes adjacent to the building a horizontal clearance of 1.2 meters from
the nearest point
(ii) Where an overhead line of voltage exceeding 650 V passes above or adjacent to or
terminates on any building, the following minimum clearances as per IE Rules 2010 Clause
No. 61 from any accessible point, on the basis of maximum sag, shall be observed, namely:-
(a) when the line passes having voltage 650 V and up to and including 33000 V above the
building a vertical clearance of highest part of building immediately under such line
meters from the highest point,
(b) When the line having voltage 650 V and up to and including 11000 V passes adjacent to
the building a horizontal clearance between nearest Conductor and any part of such
building on the basis of maximum deflection of wind must be 1.2 meters
(iii) Minimum clearances in meters between lines crossing each other as per IE 2010 Clause No.
69 are as below.
1 Low and Medium 2.44 3.05 4.58 5.49
In case of illegal construction / structure on the line under erection, the same is to be put in
written notice to the Engineer-In-charge.
(G) Erection of Stay Set:
The erection of stay set comprises of anchor rod, turn buckle, eye bolt and excavation of
suitable pit size of 2 X 2 X 5 foot, fixing of stay clamp on pole, binding of GI stay wire. The stay
insulators must be inserted in the stay wire on all stays as per drawing. The wrapping of the
Guy wire strands at both ends the stay insulator must be even and must presents neat
appearance and good workmanship. No stay should be left loose but should be tight and
straight to withstand in say cyclone or sand storm, the item includes refilling of earth and
painting of fabrication material. If stays are not required to be concreted, a pre casted cement
concrete block will be supplied by the department from his division store which the contractor
will have to transport at his own cost to the site of work and will have to use for fixing of
anchor rod at site.
A pits of 2 X 2 X 5 foot is to be dig about 4 foot away from the pole on which earthing is
required to be carried out. The earthing pipe/earthing plate/earthing coil supplied by the
company shall be used as per specification and drawing. GI wire no. 8 SWG for earthing should
be bolted with earthing pipe/earthing plate/earthing coil. G. I. Wire must be passed through
PVC rigid Pipe which must be buried at least 0.5 Meter in ground and to be kept 2.0 Meters
above ground along the Pole. The earthing are to be done at place as indicted in the pole
schedule or as selected by the field Engineer. The coke and salt will have to be supplied by the
contractor at his cost. Erection of earthing should be carried out under the supervision of the
Engineer in charge or nominated Supervisors. At least 20 KG of salt and 20 KG of coal per earth
on alternate layers (as per drawing) will be used by contractor. No amount will be paid if the
work is not done in accordance with these specification.
The guarding will have to provide at crossing of lines, telephone line crossing, road crossing
and any accident prone places as indicated by the Engineer in Charge. The work comprises of
fixing of guard cross arms, eye bolts, guard cradle as per design, GI cross lacing wires
complete. Any special type of guarding if required will be designed by the department. Binding
cross arms must be used where the HT line crosses the road. The ground clearance, line to line
clearances etc. to be maintained as per IE Rules 2010 69 and 70. The poles for road crossing
may be concreted as instructions of the Engineer In-charge. The work has to be carried out as
instructions of the Engineer In-charge.
(J)Painting and Numbering:
Rail poles and girder poles shall be given one coat of approved red-lead paint and two coats of
approved aluminium paint. All fabricated material will also be painted with two coats of
approved aluminium paint and there should be sufficient interval between every coat of
painting in order to allow for drying. The bolts and must shall be dipped in anticorrosive oil
before insertion. The lower portion of steel poles up 3 foot above ground level shall be
cleaned of all dust and rust. This surface should be given a base coat of red lead and an
additional coat of black bituminous paint before inserting in the ground. The good quality
paint will be supplied by the contractor and should be of I.S.I mark and will be got approved
from Executive Engineer, prior to starting work.
Name of the feeder and pole number has to be written on all the poles in English/Gujarati as
per instruction of Engineer In-charge. The colour of back ground and name/number must be of
contras colour. Prior to apply Colour for Numbering on P.S.C poles, it should be properly
cleaned and all accumulations of earth, dirt etc. should be removed.
Unless Specified concreting is to be done for Girder Poles/Guys only. No any PSC Pole/Guys
to be concreted without any special reason. The Concreting of PSC Poles must be approved by
concerned Executive Engineer prior to executionas per Tender Condition mentioned under
Section III Clause No. 2 and sub clause No. 8. Certificates for special Reason and approvals
must be submitted with detail Bill.
Cement concrete for any pole / stay should be carried out as per specification given by
Engineer In-Charge as and where required. Concreting should be with one part of cement, two
part of specified quality sand and four parts of well burnt Brice bats (1:2:4). The mixture
should be prepared on GI sheet and should be free from the dust. Cement, river sand and
metal should be used by contractor at his own cost. The finishing coat of cement plaster shall
be applied on outer surface Concreting and boxing for smoothness.
The normal size of concreting of pole shall be 2 X 2 X 2 Feet (0.226 cmt) & that for stay 2 x 2x
Feet (0.113 cmt). In case of Boxing for pole, it shall be 18” dia. x 3 feet (h) (2’ above and 1'
below ground) (0.15 cmt).
(L)Distribution Transformer Centre:
The distribution transformer centre (10 KVA to 200 KVA) will be of outdoor type on two poles
structures as per standard drawing and 5 KVA Transformers are to be on Single Pole. This work
include erection of special two pole structure as per Item No. 2 and fixing of all fabricated
material for support of line, L.A., HG Fuse/AB Switch, Transformer, LT Dist. Box, cable wiring,
anti-climbing devices etc. The works includes of transportation and hoisting of transformer,
numbering and painting of all fabricated materials. For transformer having capacity of 100 KVA
and above MS channel shall be utilize which will be supplied by the company. Three Earthing
are to be provided on each Transformers.
1) Earthing of LA on One side.
2) Earthing of all Metal Parts from Top angle and Transformer Body and Dist. Box on other
3) For neutral, two separate Earth wire on both side of Transformer and to be common at
All three earthing are to be done as in Delta Formation as shown in the attached Drawing. All
earthing wires are to be connected by proper size of lug and bolted at each earthing points
properly. The Earthing of Transformer Body must be done with lug only. Looping or winding
with Earthing Bolt on Transformer Body is not allowed. Earthing wire Lugs are to be brought
by Contractors. No any extra cost will be paid for this material.
Extra payment for hard soil or rock is payable as per SOR as per committee report to be
formed to decide hard soil or rock which shall consists of Concerned SDO, Deputy Engineer
(Tech) and Executive Engineer.
The cost of damage done to the transformer while erection/Transportation is recoverable
from contractor.
Before starting the work(new, alteration or addition) and during the works the contractor
must obtain lineclear wherever necessary for the concernedofficer of this office of other
Office. For any damagedone to the Men, Materials and/or property due to non-observance of
rules, the contractor will be solely responsible.
SECTION IX: Drawings
Sign & Stamp of the Bidder
Sign & Stamp of the Bidder
Arrangement of Transformer
Sign & Stamp of the Bidder
Earthing Arrangement for Transformer Centre
Sign & Stamp of the Bidder
Arrangements of Guy
1. Guy Clamp 2. Turn Buckle and Eye Bolt 3. Guy Insulator
4. Guy Wire 5. Guy Rod 6. Guy Pit (2 X 2 X 5 ft.)
7. θ 30 to 40 Deg.
Sign & Stamp of the Bidder
Sign & Stamp of the Bidder
Sign & Stamp of the Bidder
Double Pole (D.P.) Structure
Sign & Stamp of the Bidder
Guarding under 11 KV Line
Sign & Stamp of the Bidder
Guarding under LT Line
Sign & Stamp of the Bidder
LT Line Horizontal Formation and Clearances (415 V)
Sign & Stamp of the Bidder
LT Line Vertical Formation and Clearances (415 V)
Sign & Stamp of the Bidder
LT Line Horizontal Formation and Clearances (230 V)
Sign & Stamp of the Bidder
LT Line Vertical Formation and Clearances (230 V)
Sign & Stamp of the Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Documents 285273.pdf
Download all tender documents and submit your bid