| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.3 LAccepted-AOC | 1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | 2₹17.6 L+₹28,123.95 (1.62%)Rejected-AOC | 2 | Rejected-AOC L1 AGREEMENT EXECUTED | |
| 3 | 3₹17.9 L+₹53,122.68 (3.07%)Rejected-Finance | 3 | Rejected-Finance REJECT | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
Tender Value
₹22.3 L
EMD Value
₹50,000
Closing Date
24 Feb 2020, 6:00 pmClosed
EXECUTIVE ENGINEERING
Office of the Executive Engineer, PWD Roads Division, Kasaragod
SLTF 2019 - 20 PROVIDING CC DRAINAGE AND CLEARING CHOCKED UP CULVERT PERLA KATTUKUKKE ROAD KM IN BETWEEN 0/000 TO 5/000
2020_PWD_344140_1
D2-TD/104/E-tender/2019-20
Open Tender
Civil Works - Roads
Item Rate
90 days
KASARAGOD
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
online
₹50,000
Yes
16 Jun 2020
17 Feb 2020
27 Feb 2020
17 Feb 2020
24 Feb 2020
17 Feb 2020
Amount
Reconstruction culvert.
2.4.2.A : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
10.11 : Removal of earth from the choked hill side drain and disposing it on the valley side manuallyRemoval of earth from the choked hill side drain and disposing it on the valley side manually
12.1.2.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.<br> Ordinary Rock (not requiring blasting ) - Depth up to 3 m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary Rock (not requiring blasting ) - Depth up to 3 m - Mechanical Means
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
3.24.A : Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)<br>Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
MEETHAL BUILDERS PRIVATE LIMITED
HASHIM M
Bidder Name
P AHAMMED SHERIEF
HASHIM M
MEETHAL BUILDERS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .