Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹26.8 L+₹1.6 L (6.43%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹28.4 L+₹3.2 L (12.6%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹28.6 L+₹3.4 L (13.5%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹29.3 L+₹4.0 L (16.0%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | RAMLAL T G L4 | Reji Mathew L1 | Sreehari R L5 | SAJAN MOHANAN L2 | ANILKUMAR, ASWATHY CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Pumping main and Distribution lines | ||||||||
| 1.00 | 100.98.234:Supply of PVC Pipe, 10kg/cm2, 63mm Dia. | 200 | metre | 99 ₹19,800 Lowest | 121.37 ₹24,274 | 101.5 ₹20,300 | 110 ₹22,000 | 110 ₹22,000 |
| 1.00 | 100.98.236:Supply of PVC Pipe, 10kg/cm2, 90mm Dia. | 1,400 | metre | 124 ₹1,73,600 Lowest | 175 ₹2,45,000 | 126.5 ₹1,77,100 | 137 ₹1,91,800 | 137 ₹1,91,800 |
| 1.00 | 100.98.440:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm. | 2 | no | 1,897 ₹3,794 | 1,500 ₹3,000 Lowest | 1,936 ₹3,872 | 1,581 ₹3,162 | 1,500 ₹3,000 Lowest |
| 1.00 | 100.98.457:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm. | 5 | no | 4,478 ₹22,390 | 4,971.22 ₹24,856.1 | 4,573 ₹22,865 | 3,734 ₹18,670 Lowest | 4,500 ₹22,500 |
| 1.00 | OD278918/2023-2024:Cost of supplying PVC specials for laying of 200m, 63 mm pvc pipe | 1 | L.S | 768.91 ₹768.91 | 768.91 ₹768.91 | 707 ₹707 | 577 ₹577 Lowest | 750 ₹750 |
| 1.01 | OD173791/2025-2026:Cost of supplying PVC specials for laying of 1400m, 90 mm pvc pipe | 1 | L.S | 6,023 ₹6,023 | 6,685.59 ₹6,685.59 | 6,151 ₹6,151 | 5,021 ₹5,021 | 4,000 ₹4,000 Lowest |
| 1.01 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 27 | cum | 2,267 ₹61,209 | 1,850 ₹49,950 Lowest | 2,316 ₹62,532 | 1,890 ₹51,030 | 2,000 ₹54,000 |
| 1.01 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 45 | sqm | 399 ₹17,955 | 302.5 ₹13,612.5 Lowest | 408 ₹18,360 | 333 ₹14,985 | 350 ₹15,750 |
| 1.01 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 640 | cum | 650 ₹4,16,000 | 425 ₹2,72,000 Lowest | 600 ₹3,84,000 | 600 ₹3,84,000 | 590 ₹3,77,600 |
Tender Value
₹31.8 L
EMD Value
₹50,000
Closing Date
17 Oct 2025, 2:00 pmClosed
EXECUTIVE ENGINEER
P H DIVISION KOTTARAKKARA
DEPOSIT-Kollam District Panchayath-Augmentation of water supply to Cherukunnam area in Kallikkad ward of Chadayamangalam Panchayath
2025_KWA_808402_1
WRD/KWA-CE(SR)/TR/14037/5
Open Tender
Civil Works - Water Works
Item Rate
120 days
Chadayamangalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
26 Dec 2025
10 Oct 2025
18 Oct 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1347981.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .