| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 Cr+₹12.3 L (8.51%)Rejected-AOC | ₹1.6 Cr+₹12.3 L (8.51%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.7 Cr+₹26.7 L (18.5%)Rejected-AOC | ₹1.7 Cr+₹26.7 L (18.5%) | L3 | Rejected-AOC L3 |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
31 Jan 2024, 11:30 amClosed
SUPERINTENDING ENGINEER
O/O THE SUPERINTENDING ENGINEER,BUILDINGS CENTRAL CIRCLE THRISSUR
FRAMED STRUCTURE AND PILE FOUNDATION
2024_PWD_647497_1
PWD/BLDG/TR/1124/2023
Open Tender
Civil Works - Buildings
Item Rate
365 days
KADANGOUR
Please refer Tender documents.
13 documents required · 13 mandatory
₹6,508
Yes
₹50,000
Yes
18 Apr 2024
20 Jan 2024
2 Feb 2024
20 Jan 2024
31 Jan 2024
20 Jan 2024
Amount
Super structure (GF and stair room)
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
OD217796/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge -- Minimum cement content considered for this item is 340kg/m3. (Note:- cement content obtained as per mix design shall be used by the contractor at the site to obtain the required strength. Excess cement used as per mix design is not payable separately as per circular no.CE/BL/GL/6541/2015 dated 30.08.2017 of the Chief Engineer, PWD Buildings ) - All work above plinth level up to floor V level
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
50.6.1.4:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete
50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
OD217797/2023-2024:Supplying and fixing Pressed steel door of standard pattern with frame as per profile of IS 4351 of section 105x60mm using 18G (1.2mm TATA GALVANO) sheet and shutter made of section 75x30cm using 20G (1.0mmGALVANO) sheet outer styles and horizontal members and then inserted with enclosed and stiffened sheet as per specification with Zinc cromate primer coat ,SS handle ,SS aldrop SS but hinges etc.including labour charges,conveyance etc Complete
13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
OD217798/2023-2024:Supplying and fixing inauguration stone.
sub structure up to plinth level
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
OD217795/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge - Minimum cement content considered for this item is 340kg/m3. (Note:- cement content obtained as per mix design shall be used by the contractor at the site to obtain the required strength. Excess cement used as per mix design is not payable separately as per circular no.CE/BL/GL/6541/2015 dated 30.08.2017 of the Chief Engineer, PWD Buildings ) - All work up to Plinth level
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.1.4:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Pile foundation
OD217799/2023-2024:Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-30 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap) including removal of concrete from ground level to cut off level- 600 mm dia piles note ; - Minimum cement content considered for this item is 340kg/m3. (Note:- cement content obtained as per mix design shall be used by the contractor at the site to obtain the required strength. Excess cement used as per mix design is not payable separately as per circular no.CE/BL/GL/6541/2015 dated 30.08.2017 of the Chief Engineer, PWD Buildings )
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
20.6.2.1:Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 50 tonne and upto 100 tonne capacityInitial test
20.6.2.2:Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge. Single pile above 50 tonne and upto 100 tonne capacityRoutine test
SAJAN P C
M.D.BABY
Bidder Name
PYNADATH VARGHESE STEPHEN
M.D.BABY
SAJAN P C
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_993039.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .