Tender Value
₹10 Cr
EMD Value
₹20 L
Closing Date
14 Dec 2026, 4:15 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer , Road Project Department, VADODARA MUNICIPAL CORPORATION
Annual Rate contract for construction of r.c.c road through Public Participation in North zone.
357061
510/26-27
Open
Civil Works - Roads
Works
Vadodara
1 document required · 1 mandatory
₹20,000
Municipal commissioner ,Vadodara municipal corporation
₹20 L
14 Dec 2026
19 Oct 2026
16 Dec 2026
19 Oct 2026
3 Nov 2026
19 Oct 2026
120 days
time of work. Any modifications or additions in the item of works or in any
other part of the tender made by the Tenderer will not be accepted.
5. The VADODARA MUNICIPAL CORPORATION shall have the right to
reject all or any of the tenders without assigning any reason for such
6. Measurements for all the works shall be taken by standard measures
available with the VADODARA MUNICIPAL CORPORATION and practice
and rules framed by the VADODARA MUNICIPAL CORPORATION from
7. The tenderers are required to quote only firm rates and any condition
attached to the rates quoted by them is likely to disqualify the tender for
evaluation and consideration for award of the work.
8. The tenderers are advised to send their tender by Registered / Speed post
so that tender reaches to VADODARA MUNICIPAL CORPORATION on or
before the due date. Any tender received after due date shall not be
9. Tender not accompanied by Earnest Money in the manner provided in the
tender notice shall not be considered. Amount of earnest money
shall not bear any interest and will be refundable to the Tenderer, if tender
is not accepted.
10. Tender shall be filled in and signed only by the duly authorized person or
persons of the Tenderer. If at any item during security and finalisation of
the tenders, it is found that any tender or tenders are signed by the persons
who are not duly authorized then the earnest money received with such
tender shall stand forfeited.
11. Tenderer shall have to pay Security Deposit in the time and manner
prescribed under Clause 1 of the General Conditions of Contract.
12. Successful Tenderer shall keep all documents ready for signing
“Agreement with the VADODARA MUNICIPAL CORPORATION”.
Tenderer will have to make himself/itself available at fifteen days notice for
executing such Agreement. The tenderers are advised to carefully study
the various conditions of he contract, work specification, site conditions,
VADODARA MUNICIPAL CORPORATION’s rules and regulations with
regards to safety and security, etc.
13. The prices in tender shall be filled in English with neat handwriting and all
the figures and words shall be legible. No overwriting shall be done. In
case any cancellation or correction is required, the figure or word shall be
wholly crossed and re-written and authenticated under with initial/s of the
Tenderer. Rate shall be written for each item and the total amount for each
Tenderer. Rate shall be written for each item and the total amount for each
item shall be properly calculated and clearly mentioned in the relevant
columns. All such amounts shall be signed by the Tenderer.
14. Tenderer shall submit along with the tender a list of equipment which he
proposes to use for this work.
15. Tendered rates shall include all the material, taxes, labour and
requirements of plants, machinery, equipment, supervision, handling,
cleaning, testing etc. (whether mentioned in the item or specifications etc.
or not) which is required and necessary to complete the item.
16. The tenderers are advised to read together with the specifications including
materials and drawings, as specifications are complimentary part of the
item. Items for which details are not given or are given inadequately
reference will be taken from ISI specifications or MORTH or PWD
handbook. Such details shall be deemed to have been included in the item
and the rates quoted shall be all inclusive. Whether mentioned in the item
or not material test as may be required by the City Engineer of Vadodara
Municipal Corporation shall be provided and no extra payment will be made
for that purpose.
17. Specifications are given for certain numbers of items only. However, the
items for which the specifications are not prescribed but which are relevant
to these specifications shall also be executed in accordance with such
specifications.
18. Suitable number of photographs and negatives shall be supplied free of
cost to the Vadodara Municipal Corporation every month for the progress
of various stages of the works.
19. Tenders are required to quote separate prices of different items of work
change in format is acceptable. Quoting for all items is also mandatory.
20. Validity of tenderer’s proposal shall be 120 days from Last Date Of
Submission Of Online Tender.
21. ALL PAGES TO BE INITIALED
All signature in Tender documents shall be dated as well as pages of all
sections of Tender documents shall be initialed at the lower right hand
corner or signed wherever required in the Tender papers by the Tenderer
or by any person holding power of Attorney authorizing him to sign on
behalf of the Tenderer before submission of Tender.
22. RATES TO BE IN FIGURES AND WORDS
The Tenderer shall quote the rates in English both in figures as well as in
words and the rates and amounts tendered by him in the schedule of
quantities as per proforma in Appendix II. The item wise tendered amount
for the work shall be entered in the abstract of estimate and duly signed by
23. EVALUATION OF TENDER’S PRICE BID
Any error in quantity or amount in Price bid of tender form showing items of
works to be carried out shall be adjusted in accordance with the following
i) In the event of a discrepancy between description in words and
figures quoted by a Tenderer in the rates column, the description in
word shall prevail.
ii) In the event of an error occurring in the amount column of the
Schedule B of Tender Form showing items of work as a result of
wrong multiplication of the rate and quantity, the unit shall be
regarded, as firm and multiplication shall be amended on the rate.
iii) All errors in totally in the amount and carrying forward totals shall be
iv) Any rounding off of amounts against items or in totals shall be
v) For any item in price bid, the bidder has not quoted the rates (or left
blank), it is treated as ‘zero rate’ and all such item shall be considered
as executed free of cost.
The tendered sum so altered shall, for the purpose of the tenders be
submitted for the sum originally tendered and considered for acceptance.
24. CORRECTIONS AND ERASURES
All corrections and Alterations in the entries of tender papers will be signed
in full by the Tenderer with date. No erasures or over writings are
25. SIGNATURE OF TENDERER
The tenderer shall contain the name, residence and place of business of
person or persons making the Tender and shall be signed by the Tenderer
with his usual signature. Partnership firms shall furnish the full names of all
the partners in the Tender. It should be signed in the Partnership’s name
by all partners or, by duly authorized representative followed by the name
and designation of the person signing. Tender by a firm shall be signed by
an authorized representatives and a power of Attorney in that behalf shall
accompany, the Tender. A copy of the constitution of the firm with names
of all partners shall be furnished.
Witness and sureties shall be persons of status and property and their
names, occupations and address shall be stated below their signature.
27. DETAILS OF EXPERIENCE
The Tenderer should enclose documents to show that he has previous
experience in having successfully completed in the recent past work of this
nature together with the name of Owner’s location of sites and value of
28. ENGINEER OF CONTRACTOR
The contractor, on or after award of the work, shall name and depute a
qualified Engineer having sufficient experience in carrying out works of
similar nature, to whom the equipments, materials, if any shall be issued
and instructions for construction/execution shall be given.
29. TRANSFER OF TENDER DOCUMENTS
Transfer of Tender documents purchased by one intending tenderer to
another is not permissible.
30. TIME LIMIT – PERIOD OF COMPLETION
The period of completion shall be calculated from the date of issue of any
notice to proceed with the work i.e. issue of work order. Any extension of
time limit demanded by contractor for their reason, shall not entitle for any
price escalation/delay compensation or liquidity damages.
Addenda to the Tender documents may be issued prior to the date of
opening of Tenders to clarify documents or to reflect modifications in the
design or contract terms.
Each addendum issued by the Engineer in charge will be distributed in
duplicate to each person or organization to whom a set of Tender
documents has been issued.
Each recipient will retain one copy of each addendum for submission along
with his tender and return one singed copy to the Engineer-in-charge shall
become part of Tender documents.
32. RIGHT OF OWNER TO ACCEPT OR REJECT TENDER
The acceptance of Tender will rest with the Owner. The Owner however,
does not bind itself to accept the loWest tender and reserves to itself the
authority to reject any or all the Tenders received without assigning any
reason whatsoever. The whole work may be split up between two or more
contractors or accepted in part and not entirely, if considered expedient.
Tender in which any of the particulars and prescribed informations are
missing or are incomplete in any respect and/or the prescribed conditions
are not fulfilled are liable to be rejected.
Canvassing in connection with tender is strictly prohibited and
tenders submitted by the tenderers, who resort to canvassing will be liable
33 In the event of progress of work by the contractor, without executing the
contract agreement, the responsibility with all risk and cost shall be of
34 The successful Tenderer will be required to sign the contract agreement on
a stamp paper of the value as per prevailing norms of Vadodara Municipal
Corporation. Alternatively, if the Tenderer wishes to sign the agreement,
the same be adjudicated by the State Level Authority competent to do so.
35 It is responsibility of tenderer to get authorized copy of tender documents,
map etc so that during the time of execution of work contractor can proceed
with work and all time the details of work is known to the contractor.
36 The bidder shall have to submit resource/activity chart of whole work
divided in minimum 10 activities justifying the timely completion of work. In
case the bidder do not submit the schedule of work progress, it is
mandatory to follow the progress of work as decided by Vadodara
Municipal Corporation during execution.
VADODARA MUNICIPAL CORPORATION
General Conditions
GENERAL CONDITIONS OF CONTRACT
DEFINITION OF TERMS :-
In the Contract documents as hereinafter defined the following words &
expression shall have the meanings hereby assigned to them except where the
context otherwise requires :-
1. “The Owner or Employer”, means the Municipal
Commissioner Vadodara Municipal Corporation, Vadodara which may
abbreviated as “VADODARA MUNICIPAL CORPORATION” and includes
the Owner’s or Municipal Commissioner, VADODARA MUNICIPAL
CORPORATION’s authorized representatives or successors.
2. The abbreviation VADODARA MUNICIPAL CORPORATION wherever
used in contract shall mean Vadodara Municipal Corporation and term
shall be used to in place of authorized person or persons who will be
operating this contract as VADODARA MUNICIPAL CORPORATION’s
representative and will include namely Municipal Commissioner, City
Engineer and Executive Engineer or their authorized representatives.
3. The “City Engineer”, shall means the City Engineer of Vadodara
Municipal Corporation and shall include those who are expressly
authorized by him to act on his behalf.
4. The “Executive Engineer”, shall means the Executive Engineer of
Vadodara Municipal Corporation, who is incharge of the project and shall
include those who are expressly authorized him to act for and on his behalf.
5. The “Engineer in charge”, shall means the Deputy Executive Engineer of
Vadodara Municipal Corporation, who is incharge of the project and shall
include those who are expressly authorized him to act for and on his behalf.
6. “The Contractor”, means the person or persons, firm or Company whose
tender has been accepted by the Owner and include the Contractor’s legal
representatives, his successor and permitted assignees.
7. The term “Work or Works” of the contract shall mean all of the various
classes of works to be executed in accordance with the contract, whether
temporary or permanent, and include all labour and material, machinery,
instruments, construction equipment, plant, plant operation and
maintenance, all tools and all other items required for the completion of the
construction. It shall also mean the place of working, where the context so
8. “Contract”, shall mean the Agreement between the Vadodara Municipal
Corporation and the contractor for the execution of works including therein
all contract documents like Condition of Contract, Specification, Drawings,
Prices Bill, Schedule of quantities, Schedule of rates and prices (if any),
work order and all tender .
9. The “Contract Price”, means the sum named in the Tender subject to
such additional there to or deduction there from as may be under the
provisions hereinafter the contained.
10. “Construction Plant”, means all machinery, tools, appliances or thing of
whatsoever nature required for the execution, completion or maintenance
of the works or temporary works (as hereinafter defined) but does not
include materials or other things form or forming part to the permanent
11. “Temporary Works”, means all temporary works of every kind required in
or about the execution, completion or maintenance of the works. The cost
of such work associated with tender is included .
12. “Drawings”, means the drawings referred to in the Specification and any
modification such drawings approved in writing by the City Engineer /
Executive Engineer, Consultant and such other drawings, diagrams, or
sketches as may from time to time be furnished or approved in writing by
the City Engineer / Executive Engineer.
13. “Site”, means the land and other places on under in or through which the
permanent works are to be executed or carried out & any other land or
places provided by the Owner for purpose of the contract.
14. Words importing the singular number only also include the plural and vice
versa where the context requires.
15. ”Contract Documents”, means collectively the Tender documents,
Designs, Drawings, Specifications agreed variations if any, contract such
other documents constituting the Tender and acceptances thereof.
16. “The Specification”, shall mean the various technical specifications
attached and referred to in the Tender documents. It shall also include the
latest edition of relevant Indian Standard Specification published before
entering into contract. Further in absence of any specific reference in I.S.S.
the standards and specifications of P.W.D.H.B. or GWSSB as the case
may be will be followed as per the consent of city engineer.
17. The “Tender”, means the tender submitted by the contractor for
acceptances by the Owner.
18. The “Alternation Order”, means the order given in writing by the
Engineer-in-charge to effect to or deleting from and alternations in the
19. The “Completion Certificates”, shall mean the certificate to be issued by
the City Engineer, when the works have been completed to his satisfaction.
CLAUSE 1 : COMPENSATION OF DELAY AND PENALTY DELAY
The time allowed for carrying out the work as entered in the tender shall be
strictly observed by the contractor and shall be reckoned from the date of which
the order to commence work is given to the contractor. The work shall
throughout the stipulated period of the contract be proceeded with, with all due
diligence (time being deemed to be of the essence of the contract on the part of
the contract) and the contractor shall pay as compensation and or penalty for
delay. Further contractor shall to ensure good progress during the execution of
the work. The work shall be completed stage wise as per the schedule given at
the time of tender submission (Refer qualification criteria) before award of the job
to contractor, and which will form the part of the contract, failing which
intermediate compensation shall be levied. In case contractor have not
submitted it is confirmation the schedule of work progress, on part of contractor
follow the schedule of work decided by VADODARA MUNICIPAL
In the event of the contractor failing to comply with these conditions of Contract is
liable to be terminated at any stage and / or an amount equal to one half percent
of contract amount of whole work over stipulated time limit shall be levied as a
penalty for every day that the delay or penalty provided always that the total
amount of compensation to be paid under the provision of this clause shall not
exceed 10% of the contract value of the work.
The decision of City Engineer will be final for all such delay compensation.
CLAUSE 2: ACTION WHEN WHOLE OF SECURITYDEPOSIT IS
In any case in which under any clause of this contract, the contractor shall
have rendered himself liable to pay compensation amounting to the whole
of his Security Deposit (Whether paid in one sum or deducted by
installment) or in the case of abandonment of the work owing to serious
illness or death of the contractor or any other cause, the city Engineer, on
behalf of Vadodara Municipal Corporation shall have power to adopt any of
the following courses as man, deemed best suited to the interest of
Vadodara Municipal Corporation.
a) To rescinded the contract (of which recession notice in writing to the
contractor under the hand of the executive Engineer shall be conclusive
evidence) and in that case, the Security deposit of the contractor shall
stand forfeited and be absolutely at the disposal of the Vadodara Municipal
b) To employ labour paid the Vadodara Municipal Corporation and to supply
materials to carry out the work, or any part of the works, debiting the
contractor with the cost of the labour and price of materials as to the
correctness of which cost and price the certificate of the City Engineer shall
be final and conclusive against Contractor and crediting him with the value
of the work done, in all respect in the manner and at the same rate as if it
had been carried out by the contractor under the terms of this contract and
in that case the certificates of the Executive Engineer as to the value of the
work done shall be final and conclusive against the contractor.
c) To order that the work of the contractor be measured up and to take such
part thereof as shall be unexecuted out of his hands, and to give it to
another contractor to complete, in which case, any expenses which may be
incurred in excess of the sum which would have been executed by him (as
to the amount of which expenses the certificate in writing of the City
Engineer shall be final and conclusive) shall be borne and paid by the
original contractor and shall be deducted from any money due to him by the
Vadodara Municipal Corporation under the contractor or otherwise or from
his security deposit or the proceeds of sale thereof, of a sufficient part
thereof. In the event of any of the above courses being adopted by the City
Engineer the contractor shall have no claim to compensation for any loss
sustained by him by reason of his having purchased, or prepared any
materials, or entered into any engagements, or made any advances on
account of or with a view to execution of the work or the performance of the
contract. And in case of the contract shall be rescinded under the provision
aforesaid, the contractor shall not be entitled to recover or be paid any
sum, for any work therefore actually performed by him under this contract
unless and until the Executive Engineer shall have certified in writing the
performance of such work and the amount payable to him in respect
thereof and he shall only be entitled to be paid the amount so certified.
CLAUSE 3 : ACTION WHEN THE PROGRESS OF ANY PARTICULAR
PORTION OF THE WORK IS UNSATISFACTORY
If the progress of any particular portion of the work is unsatisfactory the City
Engineer / Executive Engineer shall, not withstanding that the general
progress of the work is satisfactory in accordance with Clause 2, be entitled
to take action under clause 3(b) after giving the contractor 10 days notice in
writing and the contractor shall have no claim for compensation for any loss
sustained by him owing to such action.
CLAUSE 4: CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION, IF
ACTION NOT TAKEN UNDER CLAUSE 3 POWER TO TAKE
POSSESSION OF OR REQUIRE OF OR SELL
CONTRACTOR PLANT AND MATERIAL
In any case in which any of powers conferred upon the City Engineer by
Clause 3 and 4 hereof shall have become exercisable and the same not
have been exercised, the non-exercise thereof and such powers shall not
constitute a waiver of any of the conditions thereof and such powers shall
not withstanding be exercisable in any future case of default by the
contractor for which by any clause or clauses thereof he is declared liable
to pay compensation amounting to the whole of his security deposit and the
liability of the contractor for past and future compensation shall remain
unaffected. In the event of the City Engineer taking action under sub
clause (a) or (c) of Clause 3, he may, if he so desires, take possessions of
all or any tools, plant, materials and stores in upon the works or the site
thereof of belonging to the contractor or procured by him and intended to
be used for the execution of the work or any part thereof paying or allowing
for the same in the account of the contract rates or in the case of contract
rates not beings applicable at current market rates, to be certified by the
Executive Engineer whose certificates thereof shall be final. In the
alternative the City Engineer may be notice in writing to the contractor of
his works foreman or other authorized agent require him to remove such
tools plants, materials or stores from his premises within a time to be
specified in such notice and in the event of the contractor failing to comply
with any such requisition, the City Engineer may remove them at the
contractor’s expense or sell them by auction or private sale at the risk and
cost of the contractor in all respect, and the certificate of the Executive
Engineer as to the expense of any such removal, and the amount of the
proceeds and expenses of any such sale shall be final and conclusive
against the contractor.
CLAUSE 5: FINAL CERTIFICATE
On completion of the work the contractor shall be furnished with a
certificate by the City Engineer of such completion but no such certificate
shall be given or considered to be complete until the contractor shall have
removed from the premises on which the work shall have been executed all
scaffolding, surplus materials and rubbish and shall have cleaned off the
dirt from site or any rubies or such other parts, etc.
CLAUSE 6 : PAYMENT OF REDUCED RATES ON ACCOUNT OF ITEMS
OF WORKS NOT ACCEPTED AS COMPLETED TO BE AT
THE DISCRETION OF THE EXECUTIVE ENGINEER.
The rates for several items of works estimated to cost more that Rs. 1,000/-
agreed to within, shall be valid only when the item concerned is accepted
as having been completed fully in accordance with the sanctioned
specifications. In cases where the items of work are not accepted as so
completed the Executive Engineer may make payments on account of such
items at such reduced rates as he may consider reasonable in the
preparation of final or on account bills.
CLAUSE 7 : BILLS TO BE ON PRESCRIBED FORM
The contractor shall submit all bills on the prescribed forms to engineer in
charge. The charges to be made in the bills shall always be entered at the
rates specified in the tender or in the case of any extra work ordered in
pursuance of these conditions, and not mentioned or provided for in the
tender, at the rates herein after proved for such work.
CLAUSE 8: WORKS TO BE EXECUTED IN ACCORDANCE WITH
SPECIFICATIONS, DRAWINGS, ORDERS, ETC.
The contract shall execute the whole and every part of the work in the most
substantial and workman like manner, and both as regards materials and in
every other respect in strict accordance with the specifications. The
contractor shall also confirm exactly full and faithfully to the designs, and
instructions in writing relating to work signed by the Executive Engineer
And lodge in his office and to which the contractor shall be entitled to have
access for the purpose of inspection of such office or on the site of the work
during the office hours and the contractors shall if he so requires, be
entitled at his own expenses to make or cause to be made copies of the
specifications and of all such designs, drawings or instruction aforesaid.
CLAUSE 09 : ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT
TO BE INVALIDATE CONTRACTS. RATES FOR WOKS NOT
ENTERED OR SCHEDULE RATE.
The City Engineer shall have power to make any alteration in or addition to
the original specifications, drawings and instructions that may appear to
him to be necessary or advisable during the progress of the work and the
contractor shall be bound to carry out the work in accordance with any
instruction in this connection which may be given to him in writing signed by
the City Engineer / Executive Engineer and such alteration shall not
invalidate contract. Any additional work which the contractor may be
directed to do in the manner above specified as part of the work shall be
carried out by the contractor on the same conditions in all respect on which
he agreed to do the main work, and at the same rates as are specified in
the tender for the main work. And if the additional and altered in the tender
for the work, and if the additional and altered work includes any class of
works for which no rate is specified in this contract, then such class of
works shall be carried out at the rates entered in the Scheduled Rates or at
the calculated rates whichever are lower. If the additional or altered work
for which no rate is entered in the Schedule of Rates in ordered to be
carried out before the rates are agreed upon then contractors shall within
seven days of the date of receipt by him of the order to carry out the work,
inform the Executive Engineer of the rate which he is intention to charge for
such class of work, and to arrange to carry out in such manner as he may
consider advisable provided always that if the contractor shall commence
work or incurred any expenditure in regard there to before the rates shall
have been determined as lastly here in before mentioned then in such
cases, he shall only be entitled to be paid in respect of the work carried out
or expenditure incurred by him prior to such date of the determination of the
rate as aforesaid according to such rates as shall be fixed by the Executive
Engineer, in the event of a dispute, the decision of the City Engineer will be
final. Where however, the work is to be executed according the designs,
drawings and specifications recommended by the contractor and accepted
by VADODARA MUNICIPAL CORPORATION, the alteration above
referred shall be within the scope of such design, drawings and
specifications appended to the tender. The time limit for completion of
works shall be extended in the proportion that the increase in cost
occasioned by alterations or additions bears to the cost of the original
contract work, and the certificate of the Executive Engineer as such
proportion shall be conclusive.
CLAUSE 10 : NO COMPENSATION FOR ALTERATION OR RESTRICTION
If at any time after execution of the contract documents, the City Engineer
shall, for any reason what so ever, require the whole or any part of the
work, as specified in the tender, to be stopped for any period or shall not
require the whole or part of the work to be carried out at all or to be carried
out by the contractor, he shall give notice in writing of the fact to the
contractor, who shall there upon suspend or stop the work totally or
partially, as the case may be. In any such case, except as provided here
under, the contractor shall have no claim to any payment or compensation
what so ever on account of any profit or advantage which he might have
derived from the execution of the work in full but which he did not so derive
in consequence of the full amount of the work not having been carried out,
or on account of any loss that he may be put on account of materials
purchased or agreed to be purchased, or for unemployment of labour
recruited by him. He shall not have also any claim for compensation by
reason of any alteration having been made in the original specifications,
drawings, designs and instructions which may involve any curtailment of
the work as originally contemplated. Where however, materials have
already been purchased or agreed to be purchased by the contractor
before receipt by him of the said notice, the contractor shall be paid for
such materials at the rates determined by the Executive Engineer provided
they are not in excess of requirements and are of approved quality and / or
shall be compensated for the loss if any, that he may be put to, in respect
of materials agreed to be purchased by him, the amount of such
compensation to be determined by the Executive Engineer whose decision
shall be final. If the contractor suffers any loss on account of his having to
pay labour charges during the period during which the stoppage of work
has been ordered under this clause, the contractor shall, on application be
entitled to any compensation on account of labour charge as the Executive
Engineer, whose decision shall be final may consider reasonable.
Provided that the contractor shall not be entitled to any compensation on
account of labour charges if, in the opinion of Executive Engineer, the
labour could have been employed by the contractor elsewhere for the
whole or part of the period during which the stoppage of the work has been
ordered as aforesaid.
CLAUSE 11 : NO CLAIM TO COMPENSATION ON ACCOUNT OF LOSS
DUE TO DELAY IN SUPPLY OF MATERIALS BY THE
VADODARA MUNICIPAL CORPORATION OR
PROCUREMENT OF MATERIAL FROM MARKET.
The contractor shall not be entitled to claim any compensation from the
VADODARA MUNICIPAL CORPORATION for the loss suffered by him on
account of delay by the VADODARA MUNICIPAL CORPORATION in the
supply of materials or entered in the Schedule A, or procurement of
material from market by contractor where such delay is caused by
1. Force Majeure
3. Act of enemies of the State or any other reasonable cause beyond
the control of Vadodara Municipal Corporation.
CLAUSE 12 : ACTION AND COMPENSATION PAYABLE IN CASE OF BAD
If at any time before the performance Gerrantee is refunded to the
contractor, it shall appear to the City Engineer or his subordinate in charge
of the work that any work has been executed with unsound, imperfect or
unskilled workmanship or with materials of inferior quality, or that any
materials or articles provided by him for the execution of the work are
unsound or of a quality inferior to that contracted for, or are otherwise not in
accordance with the contract, it shall be lawful for the City Engineer to
intimate this fact in writing to the contractor and then not with standing the
fact that the work materials or articles complained of may have been
inadvertently passed, certified and paid for the contractor shall be bound
forthwith to rectify or remove and reconstruct the work so specified in whole
of or in part as the case may require, or if he is required, shall remove the
material or articles so specified and provided other proper and suitable
materials or articles at his own charge and cost; and in the event of his
failing to do so within a period to be specified by the City Engineer in the
written intimation aforesaid the contractor shall be liable to pay
compensation at the rate of one per cent on the amount of the contract sum
for every day not exceeding ten days, during which the failure so continues,
and in the event of any such failure as aforesaid the City Engineer may
rectify or remove and re-execute the work or remove and replace the
materials or articles as complained of as the case may be at the risk and
expense in all respect of the contractor. If the City Engineer consider that
any such inferior work or materials as described above may be accepted or
made use of, it shall be within his discretion to accept the same at such
reduced rates as he may fix here fore.
CLAUSE – 13: WORKS TO BE OPEN TO INSPECTION. CONTRACTOR OR
REASONABLE AGENT TO BE PRESENT
All works under or in course of execution in pursuance of the contract shall
at all times be open to the inspection and supervision of the City Engineer
and his subordinates or agents appointed by Vadodara Municipal
Corporation and the contractor shall at all times during the usual working
hours and at all other times at which reasonable notice of the intention of
the City Engineer or his subordinate or agents appointed by Vadodara
Municipal Corporation to visit the works shall have been given to included.
In the specification or other documents forming part of the contract referred
to in these conditions or not and which may be necessary for the purpose
of satisfying or complying with the requirements of the City Engineer as to
any matter on which under these conditions he is entitled to be satisfied or
which he is entitles require together with carriage, therefore, to and for the
The contractor shall also supply without charge the requisite number of
persons with the means and materials necessary for the purpose of setting
out works, and counting, weighing and assisting in the measurement or
examination at any time of the work or materials, failing this the same may
be provided by the Executive Engineer at the expense of the contractor and
the expense may be deducted from any money due to the contractor under
the contract or from his Security Deposit. The contractor shall provide all
necessary fencing and lights required to protect the public from accident
and shall also be bound to bear the expense of defence of every suit,
action or other legal proceedings, at law, that may be brought by any
person for injury sustained owing to neglect of the above precautions, and
to pay any damages and costs which may be awarded in any such suit,
action or proceedings to any such persons or which may be with the
consent of the contractor be paid in compromising any claim by any such
Clause-14 Deleted.
CLAUSE 15 : HOISTING APPLIANCES ETC.
The contractor shall comply with the following regulations as regards the
Hoisting Appliances to be used by him :
a. Hoisting machines and tackle : including their attachments,
anchorages and supports, shall
(I) e of good mechanical construction, sound material and
adequate strength and free patent defect; and
(II) be kept in good repair and in good working order.
b. Every rope used in hoisting or lowering materials or as a means or
suspension shall be of suitable quality and adequate strength and
free from patent defect.
c. Hoisting machines and tackle shall be examined and adequately
tested after erection on the site and be reexamined in position at
intervals to be prescribed by VADODARA MUNICIPAL
d. Every chain, ring, hook, shackle, swing and pulley block used in
hoisting or lowering materials or as means of suspension shall be
periodically examined.
e. Every crane driver or hoisting appliance operator shall be properly
f. No person who is below the age of 20 years shall be in control of any
hoisting machine including any winch or give signals to the operator.
g. In the case of every hoisting machine and of every chain, ring, hook,
shackle, swivel and pulley used in hoisting or lowering or as a means
of suspension the safe working load shall be ascertained by adequate
h. Every hoisting machine and all gear referred to in the preceding
regulation be plainly marked with the safe working load.
i. In the case of hoisting machine having a variable safe working load
each safe working load and the conditions under which it is applicable
shall be clearly indicated.
j. No part of any hoisting machine or any gear referred to in regulation
above shall be loaded beyond the safe working load except of the
purpose of testing.
k. Motors, gearings, transmissions, electric wiring and other dangerous
parts of hoisting appliances shall be provided with efficient
l. Hoisting appliances shall be provided with such means as will reduce
to a minimum the risk of the accident descent of the load.
m. Adequate precautions shall be taken to reduce to a minimum risk of
any part of a suspended load becoming accidentally displaced.
CLAUSE 16 : MEASURES FOR PREVENTION OF FIRE
The Contractors shall not set fire to any standing jungle, trees brushwood
or grass without a written permit from the City Engineer. When such permit
is given and also in all cases when destroying out of a dug up trees,
brushwood, grass etc. by fire, the contractor shall take necessary
measures to prevent such fire spreading to or other wise damaging
surrounding property.
CLAUSE 17 : LIABILITY OF CONTRACTOR FOR ANY DAMAGE DONE IN
OR OUTSIDE WORK AREA
Compensation for all damage done intentionally or unintentionally by
contractor’s laborer whether in or beyond the limits of the work site
including any damages caused by the spreading of Fire mentioned in
clause 18 shall be estimated by the Executive Engineer or such other
officer as the Vadodara Municipal Corporation may appoint and the
estimates of the Vadodara Municipal Corporation shall be final and the
contractor shall have to pay the amount of the assessed compensation on
demand failing which the same will be recovered from the contractor as
damages in the manner prescribed in clause 1 or deducted
By the City engineer from any sums that may be due to or become due
from the Vadodara Municipal Corporation to the contractor under this
contract or otherwise. The contractor shall bear the expenses of defending
any action or other legal proceedings that may be brought by any person
for injury sustained by him owing to neglect of precautions to prevent the
spread of Fire and shall be also pay any damage and cost that may be the
court in consequence. However in any case Vadodara Municipal
Corporation can not be suit under any circumstances.
CLAUSE 18 : WORKS NOT TO BE SUBLET
The contractor shall not be assigned or subleted without approval of the
City Engineer and if the contractor shall assign or sublet his contract or
attempt to do so or become insolvent or commence any proceedings to the
adjudicated an insolvent or make any compensation with his creditors or
attempt to do so, the City Engineer may by notice in writing, rescind the
contract. Also if any bribe, gratuity, gift, loan, prerequisite reward or
advantage pecuniary or otherwise shall either directly or indirectly be given,
promised or offered by the contractor or any of his servants or agents to
any public officer or person in the employment of or authorized by the
VADODARA MUNICIPAL CORPORATION in any way relating to his office
or employment, if any such officer or person shall become in any directly or
indirectly interested in the contract, the Vadodara Municipal Corporation
may, by notice in writing rescind the contract.
In the event of a contract being rescinded, the Security Deposit of the
contractor shall thereupon stand forfeited and be absolutely at, the disposal
of the VADODARA MUNICIPAL CORPORATION and the same
consequence shall ensure as if the contract had been rescinded under
clause 3 hereof and in addition the contractor shall not be entitled to
recover or be paid for any work therefore actually performed under the
CLAUSE 19: SUM PAYABLE BY WAY OF COMPENSATION TO BE
CONSIDERED AS REASONABLE COMPENSATION
WITHOUT REFERENCE TO ACTUAL LOSS.
All sums payable by contractor by way of compensation under any of these
conditions shall be considered as reasonable compensation on be applied
to the use of the VADODARA MUNICIPAL CORPORATION without any
reference to be actual loss or damage sustained and whether any damages
had not been sustained.
CLAUSE 20 : EXECUTION OF WORKS
All works to be executed under the direction and subject to the approval in
all respect of the Executive Engineer for the time being, who shall be
entitled to direct at what point or points and in what manner they are to be
commenced and from time to time carried on.
CLAUSE 21 : DECISION OF THE VADODARA MUNICIPAL
CORPORATION TO BE FINAL
Except where otherwise specified in the contract and subject to the powers
delegated to the Engineer-in-charge by the VADODARA MUNICIPAL
CORPORATION, the decision of the City Engineer for the time being shall
be final conclusive and binding on all parties to the contract upon all
question relating to the meaning of the specifications, designs, drawings
and instruction herein before mentioned and as to the quality of
workmanship or material used on the work or as to any other question,
claim, right, matter or thing whatsoever, in anyway arising out of or relating
to the contract designs, drawings, specifications estimates, instructions,
orders or these conditions or otherwise concerning the works or the
execution of failure to execute the same, whether arising during the
progress of the work or after completion of abandonment thereof.
CLAUSE 22 : WORK ON SUNDAY
No work shall be done on Sunday or Holiday without written permission of
Executive Engineer.
CLAUSE 23 : LUMP SUMS IN TENDER
When the estimate on which a tender is made includes lump sums in
respect of parts of the work, the contractor shall be entitled to payment in
respect of the items of work involved or the part of the work in question is
not in the opinion of the Executive Engineer capable of measurement, the
Executive Engineer may at his discretion pay the lump sum amount
entered in the contract and the certificate in writing of the Executive
Engineer shall be final and conclusive against the contract with regard to
any sum or sums payable to him under the provisions of this clause.
CLAUSE 24 : ACTION WHERE NO SPECIFICATIONS ARE AVAILABLE
In the case of work for which there is no such specification, work shall be
carried out in accordance with the P.W.D. or I.S.I. specifications and in the
event of there being no P.W.D. or I.S.I. specifications the work shall be
carried out in all respects in accordance with the instructions and
requirements of the Executive Engineer.
CLAUSE 25 : DEFINITION OF WORK
The expressions “Work” or “Works” whenever used in these conditions
shall unless, there be something in the subject or context repugnant to
such construction be constructed to mean the work or the works contracted
to the executed under or by virtue of the contract, where temporary or
permanent and whether original altered substituted or additions.
CLAUE 26 : QUERRY FEES AND ROYALTIES, ETC.
All query fee, royalties, octroi dues and ground rent for stacking materials, if
any should be paid by the contractor.
CLAUSE 27 {A}: ACCIDENT OR INJURY TO WORKMAN
1. The contractor to Indemnify the VADODARA MUNICIPAL
The VADODARA MUNICIPAL CORPORATION shall not be liable for
or in respect of any damages or compensation payable by law in
respect or in consequence of any accident of injury to any workman
or other person in the employment of the contractor or his any sub-
contractor and contractor shall indemnify the VADODARA
MUNICIPAL CORPORATION against such damages and
compensation and against all claims, demands, proceedings, costs,
charges, expenses whatsoever in respect thereof or in relation
2. Payments of Claims and Damages :
Vadodara Municipal Corporation have to pay any money in respect
of such claims or demands as aforesaid the amount so paid and the
costs incurred by the Vadodara Municipal Corporation shall be
charged to and paid by the contractor and the contractor shall not be
at liberty to dispute or question the right of the Vadodara Municipal
Corporation to make such payments not with standing the same may
have been made without his consent or authority or in law or
otherwise to the contrary.
CLAUSE 27 {B} COMPENSATION UNDER WORKMAN’S
COMPENSATION ACT.
The contractor shall be responsible for and shall pay any
compensation to his workers payable under the Workman’s
compensation Act 1923, VII of 1923. hereinafter called the said Act
for injuries caused to the workers. If such compensation is paid by
the VADODARA MUNICIPAL CORPORATION as principle under sub
– section (I) of section 12 of the said Act on behalf of the contractor, it
shall be recoverable by the VADODARA MUNICIPAL
CORPORATION from the contractor under sub – section (2) of the
section. Such compensation shall be recovered in the manner laid
down in the Clause I above.
CLAUSE 28 : MEDICAL AID TO LABOUR
The contractor shall be responsible for and shall pay the expenses of
providing medical aid to any workman who may suffer a bodily injury as a result
of an accident. If such expenses are incurred by the VADODARA MUNICIPAL
CORPORATION the same shall be recoverable from the contractor forthwith
and be deducted without prejudiced to any other remedy of the Vadodara
Municipal Corporation from any amount due or that may become due to the
CLAUSE 29 : SAFETY MEASURES
The contractor shall provide all necessary personal safety equipment and
first aid apparatus available for the use of the persons employed on the
site, shall maintain the following regulations in connection therewith.
a. The workers shall be required to use the equipment so provided by the
contractor and the contractor shall take adequate steps to ensure proper
use of the equipment by those concerned.
b. When work is carried on in proximity to any palce where there is a risk of
drawing all necessary equipment shall be provided and kept ready for
use and all necessary steps shall be taken for the prompt rescue of any
person in danger.
c. Adequate provision shall be made for prompt first aid treatment of all
injuries likely to be sustained during the course of the work.
CLAUSE 30 : CLAIM FOR QUANTITIES OF WORK ENTERED IN THE
Quantity shown in the tender are approximate and no claim shall be
entertained for quantity of work executed being either more or less than
those entered in the tender or estimate.
CLAUSE 31 : NO CLAIM FOR COMPENSATION FOR DELAY IN
STARTING THE WORK
No compensation shall be allowed for any delay caused in the starting of
the work on account of any problem related to acquisition of land delay in
administrative clearance of work. And for any delay in according sanction
CLAUSE 32 : CLAIM FOR COMPENSATION FOR DELAYING THE
EXECUTION OF WORK
No compensation shall be allowed for any delay in execution of the work on
account of water standing in borrow pits or compartments. The rates ate
inclusive for hard or cracked soil excavation in mud sub-soil water, or water
standing in borrow pits and no claim for an extra rate shall be entertained
unless otherwise specified.
CLAUSE 33 : ENTERING UPON OR COMMENCING ANY PORTION OF
The contractor shall not enter upon or commence any portion of work
except with the written authority and instruction of the Executive Engineer
or of his sub ordinate in charge of the work. Failing such authority the
contractor shall have no claim to ask measurements oR payment for work.
CLAUSE 34 : LABOUR LAWS AND SAFETY REGULATIONS
i. No contractors shall employ any person who is under the age of
ii. No contractor shall employ donkeys or other animals with breaching of
string or thin rope. The breaching must be at lWest three inches wide and
should be of tape (Nawar).
iii. No animal suffering from soves, lameness or emaciation or
which immature shall be employed on the work.
iv. The Executive Engineer or his agent is authorized to remove any person or
animal found working which does not satisfy those conditions and no
responsibility shall be accepted by the Vadodara Municipal Corporation for
any delay caused in the completion of the work by such removal.
v. The contractor shall pay fair and reasonable wages to the workmen
employed by him in the contract undertaken by him. In the event of any
dispute arising between the contractor and his workmen on the grounds
that the wages paid are not fair and reasonable the dispute shall be
referred without delay to the Executive Engineer, who shall decide the
same. The decision of the Executive Engineer shall be conclusive and
binding on the contractor, but such decision shall not in any way affect the
condition in the contract regarding the payment to be made by the
Vadodara Municipal Corporation at the sanctioned tender rates.
CLAUSE 35 : ACCEPTANCE OF CONDITIONS BEFORE TENDERING THE
Any contractor who does not accept these conditions shall not be allowed
to tender for works.
CLAUSE 36 : Taxes, Duties, etc.
The rates to be quoted by the contractor must be inclusive of excise, sales
tax,Insurance and all other taxes Excluding GST etc. present & future taxes be
included. No extra payments onthis account will be made to the contractor. GST
WILL BE PAID SEPARATELY AS PER GOVT.NORMS.
CLAUSE 37 : Defect Liability Period
The defect liability period shall be Five 5 year as per work from the date of
final completion and acceptance of work by Vadodara Municipal
Corporation. Contractor shall submit performance guarantee bond of 5%
amount of total work for period as prescribed format by Vadodara
Municipal Corporation. The bank guarantee of Nationalized bank shall be
given for full defect liability period at a time. During defect liability period,
contractor shall make good any defect whatsoever nature observed in
different works, equipment, or in part of work,plant or equipment by
modifying/replacing/repairing of such defective units or parts there at his
own cost within a period of three days on hearing from owner about such
defect during liability period. In case Vadodara Municipal Corporation may
feel fit to repair/rectify/modify such work without intimation incase of
emergency/ importance of circumstances, the contractor is liable to pay all
expences incurred by Vadodara Municipal Corporation. In case if
contractor’s failure to do so, it will be got done by owner and entire cost
shall be recovered from contractor’s performance guarantee bond in the
form of bank guarantee or other dues with the company.
CLAUSE 38 : ERRORS AND OMMISSIONS
The contractor should take no advantage of any apparent error or omission
in drawings or specifications and the City Engineer should be permitted to
make such corrections and interpretations as necessary to fulfill the intent
of the plans and specifications. Alterations, omissions or correction in the
drawings, diagrams or sketches or specifications shall not constitute a case
for a claim of extra payment or extension of time by the contractor.
CLAUSE 39: INSURANCE AGAINST ACCIDENT ETC. TO WORKMEN
The contractor shall at his own expense carry and maintain insurance with
reputable Insurance Companies to his satisfaction but in no case Vadodara
Municipal Corporation will be responsible for any claim arise due to
inadequate amount and or improper provisions of insurance by the
contractor under the employees State Insurance Act, 1949. Workmen’s
compensation and Employer’s liability insurance, Contractor’s protective
liability insurance and any other insurance required under law or
regulations from time to time for this contract.
CLAUSE 40 : ADDITIONAL SAFETY CODE
The contractor shall provide all necessary safety provisions as indicated in
safety code given along with this tender.
CLAUSE 41 : FOSSILS ETC.
All fossils, coins, articles or value of antiquity and structure and other
remains or things of geological or archeological interest discovered on the
site shall as between the Vadodara Municipal Corporation and the
contractor be deemed to be absolute property of the Vadodara Municipal
CLAUSE 42 : PROGRAMME
The time allowed for execution of works shall be the essence of the
contract. The contract period shall commence from date of notice of
intimation to proceed. The tenderer at the time of submitting his tender
shall indicate to the construction schedule his program of execution of work
commensurate with the total time specified. The contractor shall provide
the Engineer-in-charge a detailed program of the time schedule for
execution of the works in accordance with the specifications and the
completion date, the entire program to be finalized by the contractor, has to
confirm the execution period mentioned along with the bill of quantities in
the tender documents. The Engineer-in-charge upon scrutiny of such
submitted program by contractor, shall examine suitability of it to the
requirement of contract and suggest modifications, if found necessary.
CLAUSE 43 : ALTERATION IN SPECIFICATION AND DESIGN AND
A) The Engineer-in-charge shall have power to make any alteration in,
omission from, addition to, substitution for, the schedule of rates, the
original specifications, drawings, designs and instructions that may appear
to him to be necessary or advisable during the progress of work and the
contractor shall be bound to carry out such altered/extra/new items of work
in accordance with any instructions which may be given to him in writing
signed by Engineer-in-charge and such alteration omission, additions or
substitution shall not invalidate contract and any altered, addition or
substituted work shall be carried out by the contractor on the same
conditions of contract. The time for completion may be extended by
Engineer-in-charge as may be considered just and reasonable by him. The
rates for such addition, altered or substituted work shall be worked out as
a) If the rates for addition, altered or substituted work are specified in the
contract for work, the contractor is bound to carry out such work at the
same rates as specified in the contract.
b) If the rates for additional, altered or substituted work are not specifically
provided in the contract for the work, the rates will be derived from the rates
of similar items or works in the contract of work. The opinion of Engineer-
in-charge as to whether the rates can be reasonably so derived from the
item of contract will be final and binding to the contractor.
c) If the rates of altered, addition or substituted work can not be determined
as specified in (a) or (b) above, the rates shall be paid as per S.O.R. of
VADODARA MUNICIPAL CORPORATION/PWD in the same of order
preference. In absence of S.O.R., rate analysis approved by the City
Engineer shall be final.
d) If the rates of altered, addition or substituted work can not be determined
as specified in (a) or (b) or (c) above, the contractor shall within seven days
of the receipt of order to carry out the work inform the Engineer-in-charge
of the rate which he intends to charge for
such work supported by rate analysis and the Engineer-in-charge will
determine the rate on the basis of prevailing market rates of materials,
labour cost at schedule of labour plus 10% thereon as contractor’s
supervision overhead and profits. The opinion of Engineer-in-charge as to
market rate of materials and the quantity of labour involved per unit of
measurement will be final and binding on contractor.
But under no circumstances, the contractor suspends work on the plea of
non settlement of items falling under this clause.
CLAUSE 44 : TESTS FOR QUALITY OF WORK
1. The contractor shall be required to give satisfactory tests wherever required
and shall rectify the defects, if any free of cost. The necessary water,
power, labour etc. required for the h tests shall also be arranged by the
contractor at his own cost.
2. All workmanship shall be of the best kind described in the contract
documents and in accordance with the instructions of Engineer-in-charge
and shall be subjected from time to time to such tests at contractor cost as
the Engineer-in-charge may direct at the place of manufacture or
fabrication or on the site or at any such place. Contractor shall provide
assistance, instruments, labour and materials as are normally required for
examining, measuring and testing of any work or workmanship as may be
selected and required by Engineer-in-charge.
3. All tests necessary in connection with the execution of work as decided by
Engineer-in-charge shall be carried out at an approval laboratory at
contractor’s cost.
4. Contractor shall furnish the Engineer-in-charge for approval when
requested or if required by the specification, adequate samples of all
materials and furnished goods to be used in work sufficiently in advance to
permit tests and examination thereof. All materials furnished and finished
goods applied in work shall be exactly as per approved samples.
CLAUSE 45 : PROCEDURE FOR MEASUREMENT OF WORK IN
1. All measurements shall be in metric system. All the work in progress will
be jointly measured by the representative of Engineer-in-charge and
contractor’s authorized agent. Such arrangements will be got recorder in
the measurements book by the Engineer-in-charge or his authorized
representative and signed by the contractor or his authorized
representative and signed by the contractor or his authorized agent in
token of acceptance. If the contractor or his authorized agent fails to be
present whenever required by the Engineer-in-charge for taking
measurements for any reasons whatsoever, the measurement will be taken
by the Engineer-in-charge or his authorized representative not withstanding
the absence of contractor and these measurements will be deemed to be
correct and binding on the contractor.
2. Contractor will submit a bill in approved proforma in duplicate to the
Engineer-in-charge of the work giving abstract and detail measurements of
various items executed during a months as mutually agreed. The
Engineer-in-charge shall verify the bill and the claim, as far as admissible.
CLAUSE 46 : TAXES, DUTIES ETC.
1. Contractor agrees to and does hereby accept full and exclusive
liability for the payment of any and all taxes including sales-tax, duties,
octroi or entry tax etc. not or herein after imposed, increased or modified
from time to time in respect of work and materials and all contributions and
taxes for unemployment, compensation, insurance and old age pension or
annuities now or hereinafter imposed by the central or State Government
authorities with respect to or covered by the wages, salaries or other
compensation paid to the persons employed by contractor.
2. Contractor shall be responsible for compliance with all obligations
and restrictions imposed by the labour law or any other law affecting
employed-employee relationship.
3. Contractor further agree to comply and to secure the compliance of all sub-
contractor with applicable central, state, municipal and local laws and
regulations and requirement. Contractor also agrees to depend indemnify
and hold harmless the owner from any liability or penalty which may be
imposed by central, state or local authority by reasons any violation by
contractor or subcontractor of such laws, regulations or requirements and
also from all claims, suits or proceedings that may be brought against
owner arising under growing out of or by reasons of work provided
for by this contract by third parties or by central or State Government
authority or any administrative sub-division thereof.
4. At present there is no sales tax on work contract. Even if at later stage
same is imposed by Govt. the sales tax on work contract shall be borne by
5. The contractor shall pay royalty tax as per the rate decided by Government.
6. The contractor shall pay all taxes like sales, income tax, VAT, Service tax
or any other tax which are in force time to time. Vadodara Municipal
Corporation may not be any way hold responsible for any such taxes.
However Vadodara Municipal Corporation can ask to produce the tax
payment on the request from detail concern departments of Govt. or
Vadodara Municipal Corporation.
(A) In respect of all labour, directly or indirectly employed in the work for the
performance of contractor’s part of this agreement, the contractor shall at
his own expense arrange for all the safety provision as per safety code of
P.W.D. and hand book on construction safety practice SP-70-2001 and
building & other construction workers.
(Regulation of Employment & Condition of Services) Act 1996. The
contractor shall serve and abide by all fire and safety security rules and
regulations of the VADODARA MUNICIPAL CORPORATION.
(B) First Aid and Injuries
1. Contractor shall maintain first aid facilities to his employees and those of
his sub-contractors.
2. Contractor shall make outside arrangement for ambulance service and for
the treatment of injuries. Names of those providing these services shall be
furnished to VADODARA MUNICIPAL CORPORATION prior to start of
construction and their telephone numbers shall be prominently displayed in
contractor’s field office.
3. All critical injuries shall be reported promptly to VADODARA MUNICIPAL
CORPORATION and copy of contractors report covering each personal
injury requiring the attention of a physician shall be furnished to
VADODARA MUNICIPAL CORPORATION.
( C ) Contractor’s Barricades
1. Contractor shall erect and maintain barricades required in connection with
his operation to guard or protect.
b) Hoisting Areas
c) Areas adjudged hazardous by contractor’s or VADODARA MUNICIPAL
CORPORATION’s inspectors.
1. VADODARA MUNICIPAL CORPORATION’s existing property
subjected to damage by ontractor’s operations.
2. Rail road unloading spot.
3. Contractor’s employees and those of his sub-contractors
shall become acquainted with VADODARA MUNICIPAL
CORPORATION’s barricading practice and shall respect the
provisions thereof.
3. Barricades and hazardous areas adjacent to but not located in normal
routes of travel shall be marked by red lanterns.
5. Contractor shall have to make all the arrangement to cover and
protect the equipments and panels stored at work site or installed
and which are likely to be damaged due to this work.
The contractor shall provide suitable scaffolds and working platforms,
gangways and stairways as per required.
All necessary personal safety equipments as considered adequate by the
Executive Engineer should be kept available for the use of persons
employed on the site and maintained in a condition suitable for immediate
use and the contractor should take adequate steps to ensure proper use of
equipment by those concerned as per the clause (30) of General
Conditions of the Contract. To ensure effectively enforcement of the rules
and regulations relating to safety precautions, the arrangements made by
the contractor shall be opened to inspection by the welfare officer, Safety
Engineer or Executive Engineer of the VADODARA MUNICIPAL
CORPORATION or their representatives.
VADODARA MUNICIPAL CORPORATION
Special Conditions
SPECIAL CONDITIONS OF CONTRACT
(A) Special conditions of contract shall be read in conjunction with General
Conditions of Contract Material and job Specifications, Drawings and other
documents forming part of this contract.
1. No remedy for action taken under this clause :
No action taken by the VADODARA MUNICIPAL CORPORATION
under the clause shall receive the contractor or any of his liabilities
under the contractor or give rise to any right to compensation,
extension of time or otherwise, failing which the owner shall have the
right to remove such sub-contactors from the site.
2. Inconvenience to the Public :
The contractor shall not deposit materials on any site which will cause
seriously inconvenience to the public. The Executive Engineer may
require the contractor to remove any material which are considered
by him to be a danger or inconvenience to the public or cause them
to be removed at the Contractor’s cost.
3. Approach Roads :
Contractors will be permitted to use the existing roads in the areas for
the purpose of transporting labourers and materials etc. The
VADODARA MUNICIPAL CORPORATION, however, will not
undertake to provide any approach road to the site of works. It shall
be entirely the
responsibility of the contractor to provide and maintain such
temporary roads at his own cost for the purpose of movement of men,
materials, and equipment. Layout of such approach roads shall be
submitted to the Executive Engineer for his approval before
undertaking the construction of the same.
4. Supply of Materials :
The contractor is required to keep himself in touch with the Deputy
Executive Engineer for the day-to-day position of supply of materials
to be supplied by owner, so as to adjust the program of work
accordingly in advance to avoid his labour remaining idle on account
of non-receipt of materials. No claim of extra payment due to or
arising form delay in supplying the materials by the Owner shall be
entertained, but a reasonable extension of period of contractor may
be considered if found justified. This is specified in clause no. (14) of
General Conditions.
5. Water Supply to Contractors:
The contractors shall make his own arrangement of water required for
construction, site office and labour camp. Contractor shall make
arrangement for receiving, storage and distribution of water as per
established norms and practice. VADODARA MUNICIPAL
CORPORATION shall not entertain any claim of contractor for delays
resulting on account of inadequate or irregular water supply.
Certified plumbers should be employed by the contractor on the work
for all the temporary sanitary and plumbing works.
6. Contractors Stores and Site Office :
Suitable area near the site of work shall be allocated free of rent to
the contractor for storing his equipment plant, materials, etc. and for
his site office. If suitable site near site of work is not available, the
contractor should prepare its site office away from the site of the work
as per the direction of the Executive Engineer.
7. Supply of Plant and Equipment Materials and Labour
The contractor shall make his own arrangements to produce all
construction plant and equipment for his work. He shall also forward
along with tender a list of type and number of the equipment with their
capacities in good working condition which he will use at site to
ensure completion of the work in specified time.
All materials, construction plants and equipments, etc. once brought
by the contractor on the site are not to be removed from there without
the written authority from the Executive Engineer. Also, the
contractor shall have adequate stock of spare parts for the equipment
on the site and work shall not be delayed on this account. Similarly
all enabling work built by the contractor for the main construction
undertaken by him are not be dismantled and removed without the
written authority from the Executive Engineer. Thus contractor shall
at his own expenses supply and provide all the construction plant,
temporary works materials both for temporary and for permanent
works, labour (including the supervision thereof), transport to or from
the site and in and about the works and other things of every kind
required for the construction, completion and maintenance of the
08. Rubbish and Clearance of Site :
The contractor shall clean away all rubbish, vegetation, roots, sods
etc. and dump them in the area indicated by the Executive Engineer
and to his satisfaction. No separate rate shall be allowed for the
above. After the work is completed and a group of structures handed
over, the contractor shall clear the area surrounding the work of all
hutments, temporary structure and excess stores and remnants of
building materials such as brickbats, sand, kapachi, timber, steel etc.
at no extra cost the VADODARA MUNICIPAL CORPORATION and
land brought to its original conditions.
09. Bench Marks
The contractor shall protect surveyor’s bench marks line marks and
base line marks from damage of movement during the work.
The contractors shall inspect the site of work and ascertain site
conditions and the nature of soil to be excavated.
11.Execution of Works :
The contractor is responsible for the correct execution of his work in
accordance with the drawings provided to him and for all mistakes
due to working to wrong levels or center lines. When levels, center
lines and bench marks of reference have been once given to him by
the Deputy Executive Engineer in writing, it is his responsibility to
record, protect and maintain the said marks, and to work to the same,
and no complains can afterwards be attended to for excess work
done inconsequence of such levels not having been kept up and
maintained by the Contractor.
12. The contractor shall obtain the permission of the Executive Engineer
before installation of fixed construction machineries, connections from
pipelines, locations of temporary buildings including labour camps and
storage materials, points of tapping electricity supply of connection. Also
the contractor shall not energize any approval of the Executive Engineer.
13. The work shall be carried out in such a manner as not to interfere with or
affect, retard or disturb the progress of other works being executes by
other agencies.
14. The contractor shall submit to the Executive Engineer periodically as
required, information regarding the progress of work being carried out by
15. The contractor shall provide at his own cost adequate closets and
sanitary accommodation for all his workman employed on the site. These
shall be in accordance with the rules and regulations of the owner. The
lavatories and sanitary accommodation shall be maintained in good
sanitary, working and disinfected conditions.
16. The contractor shall not allow any visitors on the works except with the
approval of the owner.
17. If the headquarters of the tenderer are elsewhere than in Baroda, he shall
have a duly authorized agent at site from the commencement of work until
completion of the building work as specified. Such agent shall be
authorized to act on behalf of the contractor, to accept services of notices
under the contract and agree to extra, omissions and varied items of work
and rates for the same. Such agent shall maintain on his staff a qualified
engineer and such other personnel as may be required for the efficient
execution of the work. Any notice under the contract shall be deemed to
have been serviced on the contractor is served upon such agent. The
contractor to carry out any rectification under the terms of the contractor
after the work is completed. The contractor shall have the same or another
duly authorized are using carried out. This is specified in clause no. (11) of
General Conditions.
18. The successful tenderer shall send a duly authorized competent
representative at his expenses to meet the City Engineer at his office
whenever called upon in writing to do so by the City Engineer and any
instructions, directions or explanations given by the City Engineer to such
representatives shall be held to have been given to the successful
19. The contractor shall afford facilities to the Executive Engineer for a
physical check of such materials in stock in his godowns or at the site of
work, as and when desired by doing so the Executive Engineer.
20. During the progress of the construction work, if in the drawings, diagrams
and the sketches issued if any to the contractor for the purpose of
execution of work any omissions or inaccuracies are found by the
contractor, he shall bring the same forthwith to the notice of the Executive
Engineer and get them clarified immediately.
21. Metal,Brick bats,Sand,Yellow earth,stone dust, cement, steel, water,
machine/equipment man-power and any other material required for
construction shall be produced by contractor from open market. Contractor
shall identify potential sources of material and shall make arrangements for
adequate and time bound supply of these items. Contractor shall have to
get the supply sources and material approved by Deputy Executive
Engineer before bringing material to site. No extension of time shall be
granted for completion of work on account of delays resulting due to non-
availability of material, work, electricity etc. at site.
22. Use of animals is prohibited.
23. Construction must keep on competent and experienced and qualified Civil
Engineer with experience or as directed by the City Engineer to get best
workmanship and day-to-day progress.
24. All the materials and the workmanship shall be the respective kind
described in the contract and in accordance with the Executive Engineer
instructions and shall be subjected from time to time, such tests as the
Executive Engineer may direct. The costs of such tests shall be borne by
the contractor. No extra claim will be entertained for the materials,
transport, labour, curing, preservation and supply of test samples of
interests and size and shape as directed by the Executive Engineer.
25. The contractor shall maintain an uptodate record register of the materials
issued to him, if any. One other register may also be kept showing the
quantum of work executed day-to-day together with materials particularly
cement used against each item.
26. A work order register which will also be called site instruction book will be
kept and maintained at site by contractor wherein the day-to-day
instruction may be noted down by the Dy.Executive Engineer or his
subordinate in charge of work. The violation of the instructions written by
the Dy. Executive Engineer or his subordinate in charge of the work will be
severely viewed. The obedience and strictly followed up of the instructions
will be obligatory on the part of the contractor.
27. The VADODARA MUNICIPAL CORPORATION shall also deduct from
running bills submitted by the contractor an amount equivalent as
applicable from time to time of the total amount of each of such running
applicable from time to time of the total amount of each of such running
bills towards income tax at source under the relevant provisions of Income
28. The contractor shall indemnify the The contractor shall provide at his own
cost adequate closets and sanitary accommodation for all his workman
employed on the site. These shall be in accordance with the rules and
regulations of the owner. The lavatories and sanitary accommodation shall
be maintained in good sanitary, working and disinfected conditions.
29. and every member and officer and employees of the VADODARA
MUNICIPAL CORPORATION against all the actions, claims, demands,
costs and expenses whatsoever arising out of or in connection with the
matter referred to in the above clause. The contractor shall be liable to
reimburse the VADODARA MUNICIPAL CORPORATION and keep
indemnify the employer in respect of all actions, claims, procedures,
demands, cost expenses which the VADODARA MUNICIPAL
CORPORATION may have to incure on account of default of the contractor
under the above clause.
30. The VADODARA MUNICIPAL CORPORATION will be entitled to deduct
from the bills to be paid to the contractor any sum or sums payable by the
contractors and which sum the VADODARA MUNICIPAL CORPORATION
in required to pay as a principle employer on account of default of the
contractor in respect of all liabilities referred to in above clause.
31. Force Majure
If the performance of the agreement arising out of the acceptance of
the tenderer, quotation of the tenderer by the VADODARA
MUNICIPAL CORPORATION, is prevented or delayed or interfered
with by any act of nature, wars, act of enemy, blockades, embargo,
insurrections, riots, political or commotions, strikes, lockouts, acts of
Government or other industrial disturbance, explosions or any
other cause whether enumerated or otherwise not within the
reasonable control of the tenderer or VADODARA MUNICIPAL
CORPORATION, all of which by the exercise of due diligence is
unable to foresee or overcome the Tenderer or the VADODARA
MUNICIPAL CORPORATION shall not be held responsible for the
non-performance of such agreement or prevention, delay interference
or suspension in the performance of such agreement any thereof
should bone or both the parties to such agreement be prevented from
fulfilling the contractual obligation by a state of force Majeure lasting
continuously for a period of three months, both the parties shall
consult with other regarding the future implementation of such
For the force Majeure that lasts for less than three months, the
agreement shall remain as it is and suitable period equipment to time
of force Majeure shall be added in to total time limit for performance
of the contract.
33. Sole Arbitrator
Municipal Commissioner, VADODARA MUNICIPAL CORPORATION
shall be the sole Arbitrator. For any disputes & differences of any
kind arising out of or in connection with the contractor or the carrying
out of the works during the progress of the works or after their
completion shall be referred to & settled by Municipal Commissioner,
VADODARA MUNICIPAL CORPORATION. The decision of the
Municipal Commissioner shall be final & binding to both parties.
The contractor shall take full responsibility for loss damages and the
care plant and works until it is delivered to site, erected,
commissioned and taken over by the owner. Without limiting such
responsibility, the contractor shall, in the joint names of the contractor
and the owner, to protect himself and the interest of the owner, insure
the plant and each part thereof for their full value until they have
been taken over. The contractor alone
has to bear the premium / other expenditure for such insurance.
Such insurance shall cover the equipment against loss, damages or
destruction by fire, lighting, earthquake, thefts, perils of the sea of by
any cause whatsoever, throughout the duration of the contract. The
contractor shall deposit the policy or policies and receipts for the
premium paid with the owner. All money received under any policy
shall be applied in or towards the replacement and repair of the loss
or damage. The insurance must include provision for payment of
foreign currency as may be necessary in respect of any claim.
The work specified in the Tender for works expires taking into
consideration the extension of time, if any, for completion of the work,
granted under the relevant clause of the conditions of the contract in
cases other than those where such extension as necessitated on
account of default of the contractor. The decision of the City
Engineer as regards the Operative period of the contract, shall be
final and binding on the contractor.
VADODARA MUNICIPAL CORPORATION
TECHNICAL SPECIFICATION
…Û†¤ø¾Û ¶Û×¼ÛÁõ :3 : ÍÛ¼Û•Ûó¦é ø ¸ÛÁõ ÁõÛÅé Ûá•Û ÈÛÛ餸Áõá•Û કÁõà 40 ¾Ûà.¾Ûà. ¬Ûà 25 ¾Ûà.¾Ûà. ÍÛÛ†¡ö¶ÛÛ ¾Û餸ÅÛ È−ùÛÁõÛ WBM
Is Sieve (mm) Cumulative percent Passing by weight of total aggregate.
4. Specification for RCC Road with trimix .
This work shall consist of furnishing and placing cement concrete M-250 for trimix road surface
flooring of the shape and dimensions shown on the drawings and conforming to these
Specifications or as approved by the Engineer in charge.
Prior to the start construction the contractor shall design the mix and submit to the Engineer in
charge for approval the proportions of materials.
Weigh Batch Machine of appropriate capacity shall be used continuously during the entire
process of execution of this item
In the designation of a concrete mix, letter "M" refers to the mix and the number the specified
days works cube compressive strength of that mix on 150 mm. cubes expressed in kg./cm2
1.1 Water shall not be salty brackish and shall be clean reasonably clear and free objectionable
quantities of silt and traces of oil j\injurious alkalis salts organic matter and other deleterious
material which will either weaken the mortar of concrete or cause efflorescence or attack the steel
in R C C container for transport storage and huddling of water shall be clean, Water shall confirm
to the standard specified in I S 455 -1978
1.2 If required by the Engineer in charge it shall be tested by comparison with distilled water
compression shall be made by means of standard cement tests for soundness time of setting and
mortar strength as specified in I S 269-1976 Any indication of unsoundness charge in time of
setting by 30 minutes or more or decrease of more than 10 percent strength of mortar prepared
with distilled water sample when compared with the result obtained with mortar prepared with
distilled water shall be sufficient cause for rejection of water under test.
1.3 Water for curing mortar concrete or masonry should not be too acidic or too alkaline
1.4 It shall be free of elements which significantly affect the hydration reaction or otherwise interface
with the hardening of mortar or concrete during curing or those which produce objectionable stains
or other unsightly deposits on concrete or mortar surfaces
1.5 Hard and bitter water shall not be used for curing
1.6 Potable water will generally found suitable for curing mortar or concrete
2.1 Cement shall be ordinary Portland cement (OPC) confirming to IS: 12269(Latest edition)
2.2 Cement shall be stored above the ground level in perfectly dry and water tight sheds. Wherever
bulk storage containers are used, their capacity should be sufficient to cater to the requirements at
site and should be cleaned at lWest once every 3 to 4 months. The aggregate shall be stored in
such a way as to prevent admixture of foreign materials. Different size of fine or coarse aggregate
shall be stored in separate stock-piles sufficiently away from the each other to prevent intermixing
3.1 Sand shall be natural sand, clean well graded, hard strong durable and gritty particular free from
immures amounts of dust, clay, kankar modules, soft: or flaky particles shall alkali salts, organic
matter, learn mica or other deleterious substance and shall be got approved from the Engineer-in-
charge. The sand shall not contain more than 8 percent of slit as determined by field test. if
necessary the sand.
Coarse Sand: The fineness modules of coarse sand shall not be less than 2.5 and shall not exceed
3.0. The sieve analysis of coarse sand be as under:
I. S. Sieve Designation % by wt. passing
3.2 Fine Sand: The fineness module shall not exceed 1.0 the sieve analysis of fine sand be as under:
IS. Sieve Designation % by wt. passing
4.0 STONE COARSE AGGREGATE FOR MIX CONCRETE:
4.1 Coarse aggregate shall be machine crushed stone of black trap and hard, strong, dense, durable,
clean and free from disintegrated pieces, organic and other deleterious matter.
3.2 The aggregate shall be generally be cubical in shape unless special stones of particular quarries
are mentioned. Aggregate shall be machine crushed from the best black trap. Aggregate shall
have no deleterious reaction with cement. The size of the coarse aggregate for plain cement
concrete and ordinary reinforced cement shall generally as per the table given below
IS Sieve % passing for single sized aggregate of nominal size
IS Sieve % passing for single sized aggregate of nominal size
Note: This percentage may be varied some what by the Engineer-in-charge when considered
necessary containing better and strength of concrete.
4.3 The grading test shall be taken in the beginning and at the change of source of material as
indicated in I.S. 383-1970 and I.S. 456-1978. Aggregate shall be stored separately and handled in
such a manner so as to prevent the intermixing diff aggregate if the aggregate are covered with
dust, they shall be washed with water to make them clean.
4.4 All materials shall be stored as to prevent their deterioration of their quality and fitness for the work.
Any material which has deteriorated or has been damaged or is otherwise considered defective by
the Engineer-in-charge shall not be used in the work. The aggregate shall be stored in such a way
as to prevent admixture of foreign materials. Different size of fine or coarse aggregate shall be
stored in separate stock-piles sufficiently away from the each other to prevent intermixing the
5.0 WORKMANSHIP
5.1 Prior to the start construction the contractor shall design the mix and submit to the Engineer in
charge for approval the proportions of materials including admixtures to be used water reducing
admixtures Before stating concrete the bed of foundation trenches shall be cleared of all loose
materials leveled watered and rammed as directed.
5.2 Mix shall be used including making c channel 75 mm x 75 mm required to level and slope and
thickness of the concrete road leveling of placed concrete with surface vibrator and finishing with
power floater shall be done Floater and trowel light booming the surface shall be done
Expansions joints shall be cut as directed
5.3 For sub base shall be leveled up prior to start the Trimix concrete.
The channel shall be placed on both side and shall be check by plumb & to spirit level in true
level and longitudinal slope and gradient and camber.
FOR MASS CONCRETE WORK. :
6.1 Dry coarse and fine aggregate and cement shall then be mixed thoroughly by turning over to get a
mixture of uniform colour.
6.2 Enough water shall then be added gradually and the mass turned over till a mix of required
consistency is obtained. The quantity of water shall be just sufficient to produce a dense concrete
of required workability for the purpose.
6.3 The concrete shall be mixed in a mechanical mixer. Mixers which have been out of use for more
than 30 minutes shall be thoroughly cleaned before putting in a new batch. Unless otherwise
agreed to be the Engineer in-charge, the first batch of concrete from the mixer shall contain only two
thirds of normal quantity of coarse aggregate. Mixing plant shall be thoroughly cleaned before
changing from one type of cement to another.
6.4 The method of transporting and placing concrete shall be approved by the Engineer-in charge.
Concrete shall be so transported and placed so that no contamination, segregations or loss of its
constituent material takes place. All form work and reinforcement contained in it shall be cleaned
and made free from standing water, dust, snow or ice immediately before placing of concrete. No
concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge
has been obtained.
6.7 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place
from a height exceeding 2 meters. When chutes are used they shall be kept clean and used in
such a way as to avoid segregation. When concreting has to be resumed on a surface which has
hardened, it shall be roughened, kept clean, thoroughly wetted, and covered with a 13 mm. thick
layer of mortar composed of cement and sand in the same ratio as in the concrete mix itself. This
13 mm. layer of mortar shall be freshly mixed and placed immediately before placing of new
concrete. Where concrete has not fully hardened, all laitance shall be removed by scrubbing the
wet surface with wire or bristle brushes, care being taken to avoid dislodgement of any particles of
coarse aggregate. The Surface shall then be thoroughly wetted, all free water removed, and the
coated with neat cement grout. The first layer of concrete to be placed on this surface shall not
exceed 150 mm. in thickness, and shall be well rammed against old work particular attention being
given to corners arid Close spots.
6.8 If concreting is not started within 24 hours of the approval being given, it shall have to be obtained
again from the Engineer-in-charge. Concreting being given, t shall proceed continuously over the
Area between construction joints. Fresh concrete shall not be placed against concrete which has
been in position for more than 30 minutes unless a proper construction joint is formed. Concrete
shall be compacted in its final position within 30 minutes of its discharge from the mixer unless
carried in properly design agitators, operating continuously, when this time shall be within 2 hours
of the addition of cement to the mix and within 30 minutes of its discharge from the agitator. Except
where otherwise agreed to be the Engineer-in-charge, concrete shall be deposited in horizontal
layers to a compacted depth of not more than 0.4-S-metre when internal vibrators are used and
not exceeding 0.30 meter in all other cases
6.9 In the case of reinforced concrete work workability shall be such that the concrete surrounds and
properly grips all reinforcement. The slump for pavement is maximum 50 MM and minimum
7.0 Providing and laying 125 micron thick standerd polythene film over entire W.B.M.base .
8.0 Segregation
8.1 When concreting has to be resumed on a surface which has hardened, it shall be roughened,
swept, clean, thoroughly wetted and covered with a 13 mm. thick layer of mortar shall be freshly
mixed and placed immediately before placing of' new concrete. Where concrete has not fully
hardened, allegiance shall be removed by scrubbing the well surface with wire or bristle brushes,
care : being taken to avoid dislodgement of any particles of coarse aggregate. The surface shall
then be thoroughly wetted, with neat cement grout. The first layer of concrete to be placed on the
Is surface shall not exceed 150mm.in thickness, and shall be well rammed against old work
particular attention being given to corners and close spots.
9.0 Transporting & Placing the Concrete:
9.1 The concrete shall be handed from the place of mixing to the final position in not more than
minutes by the method as directed and shall be placed into its final position compacted and
finished within 30 minutes of mixing with water i.e. before the setting commences.
9.2 The concrete shall be laid in required depth.
9.3 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of
vibrators, unless otherwise permitted by the Engineer-in-charge for exceptional cases, such as
concreting under water, where vibrators can not be used sufficient vibrators in serviceable
condition shall be kept at site so that spare equipment is always available in the event of break
9.4 After Placing
The mechanical vibrator shall be installed on channel and it shall be run in forwarded direction
of concrete placing. The vibrator shall be start and shall be use as per instruction of Engineer-in-
The water shall be suck by dewaterization equipment by spreading vaccum sheet on concrete
after sufficient vibrator the floating water shall be sufficiently suck from concrete so that the sufficient
strength of concrete shall be achieved.
The mechanical trowel shall be start after dewatering from concrete. The trowel shall be run in
such a way that the required finish top surface of concrete shall be achieved mat finish or glossy finish.
10.1 Immediately after compaction, concrete shall. be protected against harmful effects of weather,
including rain, running water, shocks, vibration, traffic, rapid temperature charges, frost and
driving out process shall be covered with wet jute bags or the similar absorbent material approved
by the Engineer-in-charge soon after the initial set, and shall be kept continuously wet for a period
of not less than 14 days from the date of placement. Masonry work over the foundation concrete
may be started after 48 hours of its laying but the curing of concrete shall be continued for a
minimum period of 14 days.
10.2 After the final set, the concrete shall be kept continuously wet if required by pounding for a period
of not less then 7 days form the date of placement. Hard and bitter water shall not be used for
curing. If curing is not possible by water then curing compound shall be used as per
11.0 Mode of Measurement & Payment :
11.1 The payment will be made on Cum. basis of the finished work.
11.2 In reinforced concrete the volume occupied by reinforcement shall not be deducted. The slab shall
be measured as running continuously through and the beam as the portion below the slab.
11.3 All necessary labour, materials Equipment, etc for sampling, preparing test cubes, curing etc.
shall be provided by the Contractor. Testing of the materials and concrete may be arranged by the
Engineer in charge in an approved laboratory at the cost of the contractor
11.4 The unit rate concrete shall include the cost of all materials, tools and plant required for mixing,
placing in position, compacting, and cost Water recuding concrete ad mixture at 100 ml per bag of
cement and making channel 75 mm x 75 mm required to level and slope and thickness of the
concrete road leveling of placed concrete with surface vibrator and finishing with power floater
and trowel light booming the surface and cutting Expansions joints by machine as directed by The
Engineer in charge and finishing as per direction of the Engineer-in-charge, curing and all other
incidental expenses for producing concrete of specified strength to complete the structure or its
components as shown on the drawings and according to these specifications. They shall also
include the cost of making, fixing and removing of all centering and forms required for the work.
11.5 The concrete shall be measured for its length breadth limiting dimensions to those specified on
plan or as directed.
11.6 The rate shall be for a unit of One Cum.
12.0 The contractor must bring mix design for M25 grade concrete before commencing the work.
Item No.: 8 Bitumen Filler Material and Contraction Joint as per direction :
The bitumen shall be paving bitumen of viscocity grade complying with Indian Standard specifications for ‘paving
bitumen’ I.S.: 73:2006.Guidance on the selection of an appropriate grade of bitumen is given in the manual for
construction and supervision of bituminous works.
Providing & Fixing Bitumen filler of 25mm thick as Expansion Joint.& Contraction Joint as per direction by
Engineer In Charge.
High Yield Strength Steel Deformed Bars.
9.1. High yield strength steel deformed bars shall be either cold twisted or rolled and shall conform to I.S. 1786-
1966 and I.S. 1139-1966 respectively. And ISI Mark is compulsory .
The, Tmt. steel reinforcement to be used in the structures shall be tested according to the standard
specifications and test results shall have to be submitted. The diameters and the length of the bars
shall be according to the design and shall be free from any rust or color on it. The item includes
cutting , bending, binding and tying using binding wires after arranging as shown in the drawing. The
reinforcement shall be got approved from the Engineer in charge.
The rate shall be per Kilogram weight of reinforcement.
The mild steel, Tor steel reinforcement to be used in the structures shall be tested according to the standard
specifications. The diameters and the length of the bars shall be according to the design and shall be free
from any rust or colour on it. The bars shall be cut to sizes, and tied using binding wires after arranging as
shown in the drawing. The reinforcement shall be got approved from the Engineer in charge.
2 Specification for TMT bars reinforcement
Scope of work :
The scope of work consists of providing and laying mild steel reinforcement and TMT Fe-415 reinforcement
for RCC works of various components of the structure. This may be approved manufacturer branch and
confirming to IS – 1786 approved by the Engineer-in-charge. This includes cuttings, bending, binding,
placing, with all equipments and labour required for the work as directed by the Engineer-in-charge and all
operations covered within the intent and purpose of the specification.
Bending of Reinforcement :
Reinforcing steel shall conform accurately to the dimensions shown on relevant drawings and conforming to
the relevant IS codes (latest revision)
Bars shall be bent cold to the specified shape and dimensions or as directed by the Engineer-in-charge using a
proper bar bender, operated by hand or power to attain proper radii of bends.
Bars shall not be bent or strainghened in a manner that will cause injury to the material.
Bars bent during transport or handling shall be straightened before being used on work; they shall not be heated to
facilitate bending.
The bending of the TMT Fe – 415 bars shall be carried out as per the following :
Sr. No. Operation Size TMT Fe-415
1 Bend Upto 22 mm dia. 3d
Over 22 mm dia. 4d
2 Rebend Upto 10 mm dia. 4d
Over 10 mm dia. 5d
Placing of Reinforcement :
All reinforcing bars shall be accurately placed in the exact position shown on the drawings, and shall be securely
held in position during placing of concrete by annealed binding wire not less than 1 mm. in size and conforming to IS :
and by using stays blocks or metal chairs, spacer, metal hangers, supporting wires or other approved devices at sufficiently
close intervals. Bars will not be allowed to sag between supports nor displaced during concreting or any other operation over
the work. All devices used for positioning shall be of noncorrodible material. Wooden and metal supports will not extend to
the surface of concrete, except where shown on the drawings, Placing bars on layers of freshly laid concrete as the work
progresses for adjusting bar spacing will not be allowed. Pieces of broken stone, brick or wooden blocks shall not be used.
Layers of bars shall be separated by spacer bars, precast mortar blocks or other approved devices.
Reinforcement after being placed in position shall be maintained in a clean condition untill completely embedded in concrete.
Special care shall be exercised to prevent any displacement of reinforcement in concrete already placed.
To protect reinforcement from corrosion, concrete cover shall be provided as indicated on the drawings. All bars protruding
from concrete to which other bars are to be spliced and which are likely to be exposed for an indefinite period shall be
protected by a thick coat of neat cement grout.
In the case of columns and walls, vertical bars shall be kept in normal position with timber templates having slots accurately
cut in for bar position. Such templates shall be removed after the concreting has progressed upto a level just below them.
Bars crossing each other, where required, shall be secured by binding wire (annealed) of size not less than 1 mm and
conforming to IS : 280 in such a manner that they do not slip over each other at the time of fixing and concreting. As far as
possible, bars of full length shall be used. In case this is not possible, overlapping of bars shall be done as directed by the
Engineer-in-charge. When practicable, overlapping bars shall not touch each other, but be kept apart by 25 mm or 1 1/4 times
the maximum size of the coarse aggregates whichever is greater, by concrete between them. Where this is not feasible,
overlapping bars shall be bound with annealed steel wire, not less than 1mm thickness twisted tight in eight shape around the
lapped bars. The overlaps shall be staggered for different bars and located at fixed locations only along the span where
neither shear nor bending moment is maximum.
Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings, joints of reinforcement bars shall be butt welded
so as to transmit their full strength. Welded joints shall preferably be located at points where steel will not be subject to more
than 75 percent of the maximum permissible stresses and welds so staggered that at any one section, not more than 33 per
cent of the rods are welded. No pre-warming or post heat treatment is necessary. Interpass temperature should be limited to
200oC with low heat input and equivalent strength low hydrogen type electrode. Suitable means shall be provided for
holding the bars securely in position during welding. It must be ensured that no voids are left in welding and when welding is
done in 2 or 3 stages, previous surface shall be cleaned property. Ends of the bars shall be cleaned of all loose scale, rust.
grease, paint and other foreign matter before welding. Only competent welders shall be employed on the work. Welded
pieces of reinforcement shall be tested. Specimens shall be taken from the actual site and their number and frequency of tests
shall be as directed by the VADODARA MAHANAGARPALIKA Engineer in charge.
The TMT Fe-415 bars shall be tested for any or all of the following tests as directed by the Engineer-in-
(i) Alternate immersion test
(ii) Salt spray test
(iii) Atmospheric exposure test
(iv) Sulphur dioxide test
(v) Potentio dynamic test
Measurements for payment
Reinforcement shall be measured in lengths separately for different diameters as actually used in the work including
overlaps/ From the length so measured the weight of reinforcements shall be calculated in tonnes as per IS : 1732 lengths
shall include hooks at ends, wastage, avoidable overlaps, couplis and welded joints, spaced bars and annealed steel wire for
binding shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement
Reinforcement shall be measured in lengths separately for different diameters as actually used in the work including overlaps/
From the length so measured the weight of reinforcements shall be calculated in tonnes as per IS : 1732 lengths shall include
hooks at ends, wastage, avoidable overlaps, couplis and welded joints, spaced bars and annealed steel wire for binding shall
not be measured and cost of these items shall be deemed to be included in the rates for reinforcement
Rate for reinforcement shall include cost of all steel including procurement, cost of bending, placing, binding and
fixing in position as shown on the drawings and as directed by the Engineer in charge. It shall also include cost of all devices
for keeping reinforcement in approved position, cost of jointing as per approved method, and all wastage, overlaps and spacer
Note: Mild steel/tor steel reinforcement to be tested in compression (chemical and physical test) which shall
not be paid extra and has to be included in the tender by the contractor.
The rates shall be in Kilogram weight of reinforcement.
As Per Morth Table No.
Sr. No Type work Max.lab.Dry.Unit weight when tested as per
IS:2720 (part 8)
1 Embankments up to 3 meter height not subjected Not less than 15.2 Kn/cu.m
2 Embankments exceeding 3 meter height or Not less than 16.0 Kn/cu.m
Embankments of any height subject to long
period of inundation
3 Sub grade ad earthen shoulder/verges/backfill Not less than 17.5 Kn/cu.m
Sr. Name of Test Frequency
1 Grain size Analysis 2 test per 3000m3 of soil
IS 2720 (Part 4)(1995 RA)
2 Plasticity Test 2 test per 3000m3 of soil
IS 2720 (Part 5) (1995 RA)
3 Standard compaction 1-2 test per every 8000m m3 of soil
IS 2720 (Part 7) 1992 and (Part 8)1983
ઈલડર ફઅમળ. ૩૯: ૮૨ ઑર.ઑર.ણીઉફી ઉ#ડળવ્ગ6ઙ બૉષળ Fવ્ગ (ળમળ ર્Gણ) M-40 GRADE
Pૉણફી ણૂટીઉફફી મફીષષીફી ળઽૉ સ.ૉ ઞૉફૂ ગ્Q*ૉસૂષ ડBૉ ધ ફૂજૉ ઞથી%લી રૃઞમફૂ ળઽૉ સ.ૉ (AS PER
DOC: CED)6064/ November 2003 of Bureau of Indian Standards.
Compressive Strength requirements of concrete paver blocks.
(Clauses 6.2.5.2 and 9.1.4 of Ref.Doc.)
Sr.NO Grade of Paver Minimum Average days Minimum
Block Compressive Strength Compressive Strength
(N/mm2) of Individiual Paver
૯) ડૉ ડLઙફૂ ગીલ$ષીઽૂ નળ ૪૭૨૨૨ ફઅઙ બૉષળ cવ્ગ ૩ ડૉ ડ (૫ ફઅઙ) *રીથૉ ગળષીફૂ ળઽૉ સ.ૉ (AS PER
CEDS (6064) NOVEMBER-2003 Of Bureau of Indian Standards Clause 8.2 & 8.5)
૱) Material Shoule be confirmed IS 15658 manufactured must have ISI
ગષ્વૂડૂફીIS Specification ફી પ્ળથ રૃઞમફી વીષષીફી ળઽૉ સ.ૉ
Specification ફી પ્ળથ રૃઞમફી વીષષીફી ળઽૉ સ.ૉ
ઈલડર ફઅમળ. ૪૬: ૮૨ ઑર.ઑર.ણીઉફી ષીઉP્ સ્ડ Fવી*ડૉ ણ બૉષળ Fવ્ગ M-40 grade ફી વીષૂ
wearing layer ષીશી ઼ળૉ ળીસ ૮% ષપૃ Water Absorption ફ ઽ્લ . વઅમીઉ દધી બઽશીઉરીઅ
(M-40) Pૉણફી વષષીફી ળઽૉ સ.ૉ Conforming to IS-15658:2006
૮૨.૨ રૂ.રૂ ,ણીઉફી M 40 Pૉણફી ણૂટીઉફફી ષીબળષીફી ળઽૉ સ.ૉ CONFORMING IS. ઞૉફૂ
ગ્Q*ૉસૂષ ડBૉ ધ ફૂજૉ ઞથી%લી રૃઞમફૂ ળઽૉ સ.ૉ (AS PER DOC: CED)6064/ November 2003 of Bureau of
Indian Standards.
Compressive Strength requirements of concrete paver blocks.
(Clauses 6.2.5.2 and 9.1.4 of Ref.Doc.)
Grade of Paver Block Minimum Average 28 days CompressiveMinimum Compressive Strength of
Strength (N/mm2) Individiual Paver Block
૭) ટ* %ટEગની કાય$વાહ! દર ૨૫૦૦૦ નંગ પેવર Dલોક ૧ ટ* %ટ (૩ નંગ) Kમાણે કરવાની રહ*શ.ે (AS PER DOC: CEDS (6064)
NOVEMBER-2003 Of Bureau of Indian Standards Clause 8.2 & 8.5)
૯. Material should be confirmed IS 15658 manufactured must have ISI.
(6064)/November 2003 of Bureau of Indian Standards
Compressive strength requirements of concrete paver blocks.
(Clauses 6.2.5.2 and 9.1.4 of Ref. Doc.)
Sr.NO. Grade of Paver Block Minimum Average 28 days Minimum Compressive Strength of
Compressive Strength Individiual Paver Block (N/mm2)
૱. ડૉ ડLઙફૂ ગીલ$ષીઽૂ નળ ૪૭૨૨૨ ફઅઙ બૉષળ cવ્ગ ૩ ડૉ ડ (૫ ફઅઙ) *રીથૉ ગળષીફૂ ળઽૉ સૉ. (AS PER DOC:
(6064)/November 2003 of Bureau of Indian Standards.Clause 8.2 & 8.5).
૯. Material should be confirmed IS 15658 manufactured must have ISI.
Material should be confirmed IS 15658 manufactured must have ISI.
જણા`યા Pુજબની રહ*શ.ે (AS PER DOC: CED)6064/ November 2003 of Bureau of Indian Standards.
Compressive Strength requirements of concrete paver blocks.
(Clauses 6.2.5.2 and 9.1.4 of Ref.Doc.)
Sr.NO Grade of Paver Minimum Average 28 days Minimum Compressive
Block Compressive Strength Strength of Individiual
(N/mm2) Paver Block (N/mm2)
$ ાહ! દર ૨૫૦૦૦ નંગ પેવર Dલોક ૧ ટ*%ટ (૩ નંગ) Kમાણે કરવાની રહ*શ.ે (AS PER
DOC: CEDS (6064) NOVEMBER-2003 Of Bureau of Indian Standards Clause 8.2 & 8.5)
૮ ) Material Shoule be confirmed IS 15658 manufactured must have ISI.
wearing layer M (> 6% O ' Water Absorption / . 01; JI M;0 +-
(M-૨૫) |ેડના લાવવાના રહ*શ.ે Conforming to IS-15658:2006.
રહ*શ.ે CONFORMING IS. kની કોoKેશીવ %C*3થ નીચે જણા`યા Pુજબની રહ*શ.ે (AS PER DOC: CED)
6064/ November 2003 of Bureau of Indian Standards.
a. Compressive Strength requirements of concrete paver blocks.
b. (Clauses 6.2.5.2 and 9.1.4 of Ref.Doc.)
Sr.NO Grade of Paver Minimum Average 28 days Minimum Compressive
Block Compressive Strength Strength of Individiual
(N/mm2) Paver Block (N/mm2)
$ ાહ! દર ૨૫૦૦૦ નંગ પેવર Dલોક ૧ ટ*%ટ (૩ નંગ) Kમાણે કરવાની રહ*શ.ે (AS PER DOC:
CEDS (6064) NOVEMBER-2003 Of Bureau of Indian Standards Clause 8.2 & 8.5)
8 ) Material Shoule be confirmed IS 15658 manufactured must have ISI
0 .28 :Providing and fixing in position redymade Water Drain channel ( 600 x 300 x
100) of M250 grade of concrete including all labour and material charge as per instruction of
engineer in charge.
Schedule for testing of Materials
Sr. Material Prescription of test which shall be Frequency @ which test shall
No. carried out be carried out
1 Kapchi - Gradation test CMT 1 to 100- 1 test
- Water absorption. 100 to 500 – 3 test
- Impact Value 500 to 1500- 5 test
- Flakiness Index of aggregaat 1500 to 5000- 7 test.
2. Sand - Fineness Modulus 150 CMt.-1 test
3. 25 to 40 M.M.size metal. 1. •Ûó¦é éøÉÛ¶Û ¤éøÍ¤ø 100 µÛ.¾Ûà. -1 ¤éøÍ¤ø
4. Cement -Consistency 1 Test @ 10.0 M.T.,
- Setting Time As per manual of Quality
- Compressive Strength Controal
5. Steel -Tensile Strength 40 M.Ton -1 test. Or atlWest
- Yield Stress one test for single work.
- Elongation Whichever is less.
- Bend - Rebend. & all Chmecial
6. C.C. Cube test - Compressive Strength 1 to 5 Cum. 1 No.
6 to 15 Cum. 2 Nos.
16 to 20 Cum. 3 Nos.
21 to 50 Cum. 4 Nos.
50 & Above Cum.-4 + Every
(1 Sample-6 cube)
7 Quarry Dust - Gradation 150 CMt.-1 test
- Plasticiy Index
8 All grade Rubber Mould Paver - Compressive 1 Test Per 25000 Nos.(In one test
Block/ and vibro short blasted Strength 3 samples are required ) Or
paver block atlWest one test for single work.
Whichever is less.
SCADA AUTOMATION SYSTEM:-
#Quality Reports
The contractor shall provide web application to record the quality reports to related to material acceptance by
agency. The system shall have intelligent forms that will record the observations and generate quality reports &
upload them to VMC’s e-governance web application dashboard.
#Web Connectivity
The contractor shall provide the connectivity to all above monitoring system. Web connectivity shall have
minimum 1 MBPS internet speed & 100% availability. Software should be intelligent. In case of connectivity failure
it should maintain the pending files and send them as soon as it is connected. The contractor shall make sure that
the entire software and hardware solution is virus free.
VMC may appoint a consultant/ Third party audit for quality/quantity audit, during execution period. The contractor
will extend all help in carrying out any survey, test etc. as directed and adverse decision there of including
rectification shall be carried out by the contractor at their cost.
(12) †›÷ÛÁõ−ùÛÁéõ ›÷é ©Ûé કÛ¾Û ÉÛÄõ õકÁõ©ÛÛ× ¸ÛÐéüÅÛÛ× M-25 •Ûó¦é ø¶ÛÛ કÛê’õà¤ø¶Ûà ¾Ûà“Û ¦øà¡öÛ†¶Û GERI …¬ÛÈÛÛ ÍÛÁõકõÛÁõ ¾ÛÛ¶¿Û
(13) †›÷ÛÁ−ùõùÛÁéõ કÁéõÅÛ ©Û¾ÛÛ¾Û કÛ¾ÛÛé¾ÛÛ× ÍÛÁકõÛÁõ/ÈÛà.…é¾Û.…éÍÛ.…éÍÛ.¾ÛÛ¶¿Û ÍÛ×ͬÛÛ …¬ÛÈÛÛ RITES/CEIL/GERI ÜÈÛ•ÛéÁõé ¾ÛÛ׬Ûà
(15) ›÷é ©Ûé કÛ¾Û¶ÛÛ Í¬ÛÇé¬Ûà †›÷ÛÁõ−ùÛÁõ¶ÛÛ,VMC ¶ÛÛ ©Û¬ÛÛ TPI ¶ÛÛ ¸ÛóÜ©ÛܶÛܵ۶Ûà ÐüÛ›÷Áõà¾ÛÛ× Áéõ¶¦ø¾ÛÅÛà કÛéÁõ કÅÛéકõ¤ø કÁõà
(22) ›÷é ©Ûé કÛ¾Û¾ÛÛ× ÈÛÛ¸ÛÁõÈÛÛ¶ÛÛ× ¬Û©ÛÛ× ¾Û¤øàÁõà¿ÛÅÛ/…Û†¤ø¾Û †›÷ÛÁõ−ùÛÁõ ›÷¿ÛÛ׬Ûà ÅÛÛÈÛÈÛÛ¶ÛÛ ÐüÛ¿é Û ©Ûé ‘ÍÛÛéÍÛÙ’ ¾ÛÛ¤éø ÍÛ×¼Û×ÜµÛ©Û TPI
ળઽસૉ. Minimum Wages Act, ઼ૉભડૂ ઑ ડ ગૉ ષઘદ્ ષઘદ રઽીફઙળ ઼ૉષી઼નફ. ગૉ ઼ળગીળ _ીળી વીઙૃ
ઉ5ળનીળ બી઼ૉધૂ ગળૂ સગસૉ ઇફૉ ઈ ઋબળીઅદ ઉ5ળનીળફૉ ગીશૂ લીનૂરીઅ રૃગૂ સગસૉ. /TERMINATE ગળૂ
ઑ઼. >બૉ઼ૂભૂગૉ સફ દધી P.W.D. MANNUALs રૃઞમ ગળષીફૂ ળઽૉ સ.ૉ
૩૮. ઉ5ળનીળૉ ગીરફી >ધશૉ MOVING ડZ ીભૂગ દૉરઞ ળીઽનીળૂકફૂ ઼વીરદૂ રીડૉ ઞWળૂ દરીર ઼અમુપદ બઙવી
(Ref. Clause of general condition of contract)
PERFORMANCE GUARANTEE BOND
(FOR R.C.C Road & Paver Block)
Where as MIS.___________________________________have been awarded a Contract dated
________________for the R.C.C Road Work of ________________road as
specified in the tender by the Vadodara Municipal Coporation and
Where as the said M/S. _______________________________has appointed us,__________
Bank to provide a PERFORMANCE GUARANTEE bond to the VADODARA
MAHANAGARPALIKAfor the work undertaken by MIS. _______________________ and
Where as we, the _____________________Bank have agreed to provide such a
PERFORMANCE GUARANTEE bond.
Now THEREFORE we the _____________________________Bank provide the following
Performance Bank Guarantee by way of this bond to the VADODARA MAHANAGARPALIKA.
1. The contract value of the contract prbvided M/S.____________________by the
VADODARA MAHANAGARPALIKA is Rs.___________________This guarantee in the
nature ofPERFORMANCE GUARANTEE is provided so as be ensure and indemnify the
VADODARA MAHANAGARPALIKA for the full and proper performance of the contract
by M/S._____________ the __________________bank hereby indemnify the
VADODARA MAHANAGARPALIKA for all losses and/or damages to the Road surface
which would be constructed by M/S.___________________ and such PERFORMANCE
GUARANTEE would include any damage to R.C.C road surface which may be suffered
by the VADODARA MAHANAGARPALIKA, as a result of poor workmanship, or at all. By
way of this bond.
We the ________________________bank agree and promises that in the
eventuality of the contractors M/S. _____________________not repairing or
remeding the problem, loss or damage to the Road, surface, we shall indemnify and pay
the VADODARA MAHANAGARPALIKA. such expenses, losses and damages that may
be incurred by the VADODARA MAHANAGARPALIKA., as a result of the VADODARA
MAHANAGARPALIKA getting the work done itself or from other source.
2. WE ____________________Bank agree and undrestand that the decision as to whether
any losses or damages to the road surfaces have taken place or not and/or whether the
work suffers from poor workmanship or not will be taken by the commissioner of
VADODARA MAHANAGARPALIKA. and on the Commissioner’s deciion regarding such
losses or damage or defect whatsoever being so notified by the VADODARA
MAHANAGARPALIKA. to us. We shall immediately taken steps and ensure that
M/S._____________ faithfully and diligently carry out the necessary remedial steps to
the full satsifaction of the commissioner of VADODARA MAHANAGARPALIKA..The
opionion of the Commissioner as to whether full and complete remedial steps, to the full
satisfaction of the Commissioner of VADODARA MAHANAGARPALIKA. has been
takenor not will be that the Commissioner of VADODARA MAHANAGARPALIKA.. For
the purpose of arriving at such decision as aforesaid, it will be open to the Commissioner
of VADODARA MAHANAGARPALIKA.to take assistance of such technical popel as may
be available and it will be also open to the Commissioner of VADODARA
MAHANAGARPALIKA. in case he so desires, to delegate this poer to a subordinate, like
the City Engineer, to take appropriate decision and the decisions referred to above will
be deemed to be properly taken and as if taken by the Commissioner of VADODARA
MAHANAGARPALIKA... In the eventuality of M/S. ______________ not taking remedial
action to the atmost satisfaction of the Commissioner of VADODARA
MAHANAGARPALIKA.the VADODARA MAHANAGARPALIKA., will be entitled to get
the work done itself or from other sources. On the Commissioner of VADODARA
MAHANAGARPALIKA. notifying to us the total expenses incurred for the purpose we
hereby expressly undertake the pay to VADODARA MAHANAGARPALIKA. the- said
amount forthewith and in any case not later than 7 days from such intimation. We shall
accept as final and binding the amount indicated by the Commissioner of VADODARA
MAHANAGARPALIKA. and our obligation to pay such amount will be a continuing
obligation irrespective of any dispute or difference that may arise between us and M/S.
_________________________of between VADODARA MAHANAGARPALIKA and
3. The contract value is Rs. ___________________This PERFORMANCE GUARANTEE
is limited to 5% of the said contract value and accordingly it comes to Rs.
______________ our liability will in all cases be limited to Rs. _________________.
4. We agree and undertake that this PERFORMANCE GUARANTEE will be valid for a
period of 5 years from the date of issuance of completion certificate to M/S.
_____________________or the commissioner of VADODARA MAHANAGARPALIKA.
will notify such completion date to us. In case no such completion date is notified, this
PERFORMANCE GUARANTEE will be valid for 5 years from the date of execution of
this document. This PERFORMANCE GUARANTEE will come into effect from such
completion date. In case however, the contract consist of several parts it will be open to
the Commissioner to indicate separate completion dates for separate parts, and to
simultaneously indicate a break up of the contract value equivalent to the separate parts
in, which case the PERFORMANCE GUARANTEE to the extent of the different contract
values will come into operation on such different completions date. It is expressly
understood on that in considering this period of 5 years, the date by which the
Corporation intimates the Bank about the losses, damages or problem as the case may
be, shall be considered and as long as such intimation is within a period of 5 years from
the completion date, we the _______________Bank will be liable irrespective of whether
the remedial actions or lack there of has taken place after the period of 5 years.
5. We ______________Bank agree that the PERFORMANCE GUARANTEE which is a
continuing guarantee, will be binding and enforeceable against us irrespective of any
difference or dispute between VADODARA MAHANAGARPALIKA and M/S.
_________________ or between us and
M/S.__________________________________and irrespective of any change or
variation or extension oftime or any for bearance or waiver made or granted by
VADODARA MAHANAGARPALIKA to M/S. ___________________________.
6. In case any disputes arises as to the interpretation or implementation of this
PERFORMANCE GUARANTEE THE MATTER shall be referred to the sole arbitration of
the commissioner of VADODARA MAHANAGARPALIKA, whose decision in the matter
will be final. In case any recourse to any court .of law is necessitated. the appropriate
Civil Court at Vadodara alone will have jurisdiction.
Date: Sign of Contractor.
Not to be typed:
NAME OF WORK :- Annual Rate contract for construction of r.c.c
road through Public Participation in North
SUMMERY OF THE WORK
NAME OF WORK :-
PART NAME OF WORK AMOUNT
Annual Rate contract for \૦.0 crore
construction of r.c.c road
through Public Participation
TOTAL AMOUNT 1૦.0 crore
TOTAL AMOUNT 1૦.0 crore
AMOUNT IN WORDS
Declaration : 1. I/We have visited the site of work and I/we fully
conversent with nature of work to be executed on the
2.I/We have studied all the detail specifications and I am bound to do
the work as per specification.
Contractor’s Sign.
(Name & Authority)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER RCC NORTH.pdf
SBD north RCC.pdf
Amendment north RCC janbhagidari.pdf
CORRIGENDUM
City Engineer Paripatra.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .