Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.9 LAccepted-AOC | 1 | Accepted-AOC LOWEST | |
| 2 | 2₹18.3 L+₹1.3 L (7.99%)Rejected-Finance | 2 | Rejected-Finance L2 |
Tender Value
₹16.9 L
EMD Value
₹42,257
Closing Date
17 Mar 2025, 5:30 pmClosed
Assistant engineer LID EW tanur municipality
Office of the ,Assistant engineer LID EW tanur municipality
Construction of Mukkola sub centre road footbridge and approach road D-2-Pno 721/25-PCP 2024-25- of Tanur Municipality under Annual plan 2024-25
2025_LSGD_748233_11
07/AE/ET/LID EW/2024-25
Open Tender
Civil Works - Others
Item Rate
300 days
Tanu municipality
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹42,257
Yes
19 May 2025
10 Mar 2025
18 Mar 2025
10 Mar 2025
17 Mar 2025
10 Mar 2025
Amount
FOOT BRIDGE
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD458089/2024-2025:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.(MODIFIED od 60.1.2)
OD458092/2024-2025: Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.(Modified DAR 60.64.1)
OD458091/2024-2025: Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end(60.64.4)
OD458090/2024-2025: Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m(Modified DAR 60.64.6)
OD458093/2024-2025:0.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
OD460634/2024-2025:Filling with Quarry Muck, Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD462054/2024-2025:DR PACKING -Rough stone dry packing with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site(Modified DAR 60.7.4)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD462862/2024-2025:Providing and fixing Granite of any colour and shade for Name board, of required size laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all, levels, including lettering &amp; fixing
KUNHAMMUDU P. (BID ID -2159417)
Bidder Name
P. ANIL KUMAR
KUNHAMMUDU P.
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1209784.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .