| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance | -2.51% | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.8 CrAdmitted-Finance | -0.22% | ₹2.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.8 CrAdmitted-Finance | -0.10% | ₹2.8 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
1 Jun 2026, 5:00 pmClosed
SM (WC-2) Sector 19 Noida
SM (WC-2) Sector 19 Noida
D/o Village ( D/o Old Community Center in Village Nithar) Noida
2026_NOIDA_1149952_1
06/GM/SM(WC-2)/CB/ET/2026-27
Open Tender
Civil Works - Others
365 days
Noida
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
Yes
Noida
₹5.6 L
Yes
1 Jul 2026
18 May 2026
2 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechnical means ( hydraulic excavatory)/ manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. All kinds of soil , the contractor has to defect different y= utilities like sewer line water supply line, electrical cable, gas pipe line extra using utility detecting machine before start the excavation only after getting permission of engineer in charge. | 906 | Cum | 144.93 | ₹1,31,306.58 |
| 0.0 | Filling available excavated earth ( excluding rock ) in trenches, plinth sides of foundations etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering, lead upto 50 M & lift up to 1.5m. | 906 | Cum | 93 | ₹84,258 |
| 0.0 | Earth work in embankment in ordinary soil , embankment to be done in 20 cm layers,breaking clods,watering,rolling each layer with 1/2 tone roller or wooden roller or steel rammer and rolling every therd and top most layer power roller or minimum 8 tonne inluding 1.5 Mts. lift and all lead including cartage of earth by machanical transportation and all T & P Labour etcrequired proper completion of work . (Earth sall be arranged by the conctor at his own cost from out of Noida.) | 636 | Cum | 363.04 | ₹2,30,893.44 |
| 0.0 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 61 | Cum | 460 | ₹28,060 |
| 0.0 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stoneaggregate 40 mm nominal size) | 60 | Cum | 5,746.88 | ₹3,44,812.8 |
| 0.0 | Providing and laying damp-proof course 40mm thick with cementconcrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived fromnatural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 832 | Sqm | 307.76 | ₹2,56,056.32 |
| 0.0 | Extra for providing and mixing water proofing material in cement concrete Per 50 Kg work in doses by weight ofcement as per manufacturer's specification. | 117 | Per 50 kg cement | 49.11 | ₹5,745.87 |
| 0.0 | Providing and laying in position ready mixed M-25 grade cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland / Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttring, finishing and reinforcement as per direction of the engineer-in-charge, for thr following grades of concrete upto Plinth Level Concrete of M25 grade with minimum cement content of 330 Kg/cum. | 174 | Cum | 7,912.32 | ₹13,76,743.68 |
| 0.0 | Providing and laying in position ready mixed M-25 grade cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland / Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttring, finishing and reinforcement as per direction of the engineer-in-charge, for thr following grades of concrete above Plinth level concrete of M25 grade with minimum cement content of 330 kg/cum. | 248 | Cum | 8,654.76 | ₹21,46,380.48 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars. | 54,516.57 | kg | 82.81 | ₹45,14,517.16 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
C06.xls
Additional Documents • 0.05 MB
TD06.pdf
Tender Documents • 9.39 MB
BOQ_2153148.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid