Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAccepted-AOC | ₹10.0 Cr | L1 | Accepted-AOC R1 |
| 2 | L2₹11.8 CrRejected-AOC A 216 217 218 CITI TOWER SECTOR 15 CBD BELAPUR NEW MUMBAI 400614 | NEW MUMBAI | THANE | MAHARASHTRA | 400614 | ₹11.8 Cr | L2 | Rejected-AOC R2 |
Tender Value
₹12.2 Cr
EMD Value
₹5 L
Closing Date
21 Dec 2021, 3:00 pmClosed
Superintending Engineer
P H Circle, KWA, Kalmandapam, Palakkad
Jal Jeevan Mission- 2020-21-Supplying, laying, testing, commissioning and maintenance of distribution system and providing FHTCs (2691 Nos) in Anakkara panchayath
2021_KWA_458584_1
18/21-22/SE/PHC/PKD
Open Tender
Civil Works - Others
180 days
Anakkara
As per NIT
3 documents required · 3 mandatory
₹16,800
₹5 L
P H Circle,KWA,Kalmandapam,Palakkad
22 Mar 2022
4 Dec 2021
24 Dec 2021
4 Dec 2021
21 Dec 2021
4 Dec 2021
4 Dec 2021 - 13 Dec 2021
13 Dec 2021
Amount
Jal Jeevan Mission - 2020-21 - WSS to Anakkara Panchayath in Palakkad district.
Supplying, laying, testing, commissioning and maintenance of distribution system and providing FHTCs (2691 Nos) in Anakkara panchayath., and all other works mentioned in NIT volume 2.(Scope of work). (It is the responsibility of the contractor to complete all works in the scope of work, successfully, trial run and commissioning and maintain the entire work done by him for the maintenance period of 12 months after commissioning and handing over the scheme to KWA. The defect liability period (guarantee period) is 24months from date of commissioning. The quoted amount shall be exclusive of 12 % GST etc. for completion of all works in scope of work as per site conditions)
HITECH CONSTRUCTION GROUP
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid