Tender Value
₹4.3 Cr
EMD Value
₹8.5 L
Closing Date
20 Jul 2026, 4:00 pm
Similar tender results from the same govt authority in the past 3 years.
Office of The Executive Engineer RnB Division Patt
Office of The Executive Engineer RnB Division Pattan
Construction 1x45 mtr Spam Bridge on Gundari Nallaha Hurcheck
2026_PWDJK_313480_1
NIT 27 of RnB Pattan 2026-27
Open Tender
Civil Works
180 days
Office of The Executive Engineer RnB Division Patt
Please refer Tender documents.
12 documents required · 12 mandatory
₹5,500
Executive Engineer RnB Division Pattan
₹8.5 L
office of Superintending Engineer PWD R n B Circle
24 Jun 2026
24 Jun 2026
21 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Main Bridge Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 600 | Cum | 187.3 | ₹1,12,380 |
| 2 | Boring, providing and installing bored cast-in-situ reinforced cement concrete pile of specified grade concrete mix, diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embeded in the pile cap etc. all complete including removal of excavated earth with all lifts and leads(Length of pile for payment Shall be measured from top of shoe to the bottom of pile cap)1200 mm dia piles | 352 | Rm | 14,437.25 | ₹50,81,912 |
| 3 | Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor pile method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer-in-chargeInitial test (Test Load 2.5 times the safe capacity) | 1 | NO | 1,59,533 | ₹1,59,533 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 20.92 | Cum | 6,198.6 | ₹1,29,674.71 |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improveworkability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately.All works upto plinth level | 467.59 | Cum | 8,486.1 | ₹39,68,015.5 |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improveworkability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately.All works above plinth level upto floor V level | 190.07 | Cum | 9,877.05 | ₹18,77,330.89 |
| 7 | Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. | 657.66 | Cum | 98.8 | ₹64,976.81 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete | 418.48 | Sqm | 286.35 | ₹1,19,831.75 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:columns, pillars, piers, abutments, posts and struts. | 546.1 | Sqm | 742.55 | ₹4,05,506.56 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 73,757.5 | Kgs | 123.2 | ₹90,86,924 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_1014739.xls
BOQ • 0.31 MB
sbd.pdf
Other Document • 2.07 MB
Download all tender documents and submit your bid