| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-AOC 207 B KRISHANA DPATH AJMER ROAD JAIPUR | JAIPUR | RAJASTHAN | 302001 | ₹31.5 L | L1 | Accepted-AOC AOC |
| 2 | L2₹31.9 L+₹34,143.20 (1.08%)Rejected-Finance BANHI BAGNA ABAZIPEN 2 0 TAL STREDA LINK ROOD | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | ₹31.9 L+₹34,143.20 (1.08%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical NA | NA | NA | 121004 | - | - | Rejected-Technical reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical reject |
| Sl No | Description | Qty | Unit | M/s Singh Enterprises L2 | AMAR CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 225.2 | CUM | 45 ₹10,134 Lowest | 45 ₹10,134 Lowest |
| 2.00 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 38.45 | CUM | 5,940 ₹2,28,393 Lowest | 5,940 ₹2,28,393 Lowest |
| 3.00 | Cement Concrete in (1:2:4) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 169.85 | CUM | 6,320 ₹10,73,452 Lowest | 6,320 ₹10,73,452 Lowest |
| 4.00 | Cement Concrete in (1:1.5:3) M-20 mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 31.2 | CUM | 7,110 ₹2,21,832 Lowest | 7,110 ₹2,21,832 Lowest |
| 5.00 | Providing and laying of C.C. M-25 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material and T&p etc required for proper completion of work as directed by Engineer-in charge. | 18.35 | CUM | 7,310 ₹1,34,138.5 Lowest | 7,310 ₹1,34,138.5 Lowest |
| 6.00 | Steel reinforcement work in RCC including cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work | 5.2 | MT | 71,150 ₹3,69,980 Lowest | 71,150 ₹3,69,980 Lowest |
| 7.00 | Providing centering & shuttering for ordinary CC work as required including all cost of labour, material and & T&P etc complete required for proper completion of work as directed by Engineerin charge | 225 | SQM | 520 ₹1,17,000 Lowest | 520 ₹1,17,000 Lowest |
| 8.00 | Providing centering & shuttering for all R.C.C. work as required including all cost of labour material and T&P etc complete required for proper completion of work | 89.32 | SQM | 590 ₹52,698.8 Lowest | 590 ₹52,698.8 Lowest |
| 9.00 | Providing and laying of coarse sand in graded filter including all cost of labour, material and T&P etc. complete required including all cost of labour material and T&P etc complete required for proper completion of work. | 14.25 | cum | 1,990 ₹28,357.5 Lowest | 1,990 ₹28,357.5 Lowest |
| 10.00 | providing and laying of pea gravel in bed and graded filter sand in filter including all cost of labour material and T&P etc. complete required for proper completion of work or as per Directed by engineer in charge. | 8.24 | Cum | 2,350 ₹19,364 Lowest | 2,350 ₹19,364 Lowest |
Tender Value
₹33.2 L
EMD Value
₹66,400
Closing Date
6 Jun 2026, 5:00 pmClosed
EEMGCCD4 AMROHA
EEMGCCD4 AMROHA
Construction Of V.R.B cum fall At Km. 10.900 Of kundarki Dy. under Project M.G.C. Stage-II
2026_UPIDC_1156046_6
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹66,400
8 Sept 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
6 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 225.2 | CUM | - | - |
| 2 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 38.45 | CUM | - | - |
| 3 | Cement Concrete in (1:2:4) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 169.85 | CUM | - | - |
| 4 | Cement Concrete in (1:1.5:3) M-20 mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 31.2 | CUM | - | - |
| 5 | Providing and laying of C.C. M-25 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material and T&p etc required for proper completion of work as directed by Engineer-in charge. | 18.35 | CUM | - | - |
| 6 | Steel reinforcement work in RCC including cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work | 5.2 | MT | - | - |
| 7 | Providing centering & shuttering for ordinary CC work as required including all cost of labour, material and & T&P etc complete required for proper completion of work as directed by Engineerin charge | 225 | SQM | - | - |
| 8 | Providing centering & shuttering for all R.C.C. work as required including all cost of labour material and T&P etc complete required for proper completion of work | 89.32 | SQM | - | - |
| 9 | Providing and laying of coarse sand in graded filter including all cost of labour, material and T&P etc. complete required including all cost of labour material and T&P etc complete required for proper completion of work. | 14.25 | cum | - | - |
| 10 | providing and laying of pea gravel in bed and graded filter sand in filter including all cost of labour material and T&P etc. complete required for proper completion of work or as per Directed by engineer in charge. | 8.24 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.48 MB
TD03.pdf
Tender Documents • 2.70 MB
BOQ_2166003.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .