Loading…
Loading…
Tender Value
₹15.0 L
EMD Value
₹15,000
Closing Date
1 Sept 2026, 6:00 pm3d left
Dy.Minicipal Commissioner - West Zone
Construction of Ganesh kund at Sabarmati River front at Sahitya Parisad in navrangpura ward at west zone. (Re-Tender)
337018
2/26-27 (T.N.18)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹15,000
20 Aug 2026
20 Aug 2026
20 Aug 2026
1 Sept 2026
20 Aug 2026
2. Tender Estimated Cost
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.15,000.00)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.900.00
6. Time-Limit 1 months
7. Validity Period 120 Days
8 Eligibility Criteria Register “E-2” class in PWD in Govt. R&B/CPWD/AMC or
equivalent registration with any other state Govt. or
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
10 Date of Opening Dt.02-09--2026, 15:00 PM
Submission of EMD. Tender fee and other Documents during office
Place of Submission & Opening of
11. hours: On date: 02-09-2026 &12:00 pm West Zone, 2nd Floor,
Tender A.M. Office, Dr. Ramanbhai Patel Bhavan,
Usmanpura.Ahmedabad Municipal Corporation, W.Z. Office,
Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
12 Penalty Due to Delay of work
Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
13 Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or major
of part thereof of any amount, the contractor shall be bound to start the
Time permitted to start parts of
14 works within 48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation as
above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500
per day (for tenders amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make contractor
responsible to be black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of
The staff of the contractor shall wear safety jackets,
hoes, helmets etc. while on duty and any violation will attract
fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
he works without proper precautions/safety measures as
equired will attract a fine of Rs. 5,000/- for each incident.
16 Defect &Liability Period The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards
the expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the
certified date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period
shall be 12 months from the certified date of completion which
should include one monsoon.
(d) For building works, the period specified in (a), (b) or (c) above
OR elapse of monsoon period following the certified date of
completion, whichever is later. For the purpose of deciding the
monsoon period, the 30th September may be treated as the last
17 Time permitted to start parts of Whenever a work is allotted by Engineering staff, whether minor
work or major of part thereof of any amount, the contractor shall be
bound to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in 48 hours of
intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above
Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of
last notice of penalty.
18 Compensation for Delay 10% of Remaining work (As per Circular)
19 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
Of Tender And The Same As to be Attached Along With The Tender
20 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
21 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Contractor's Sign Addl.C.E.(west zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
(WEST ZONE) TENDER FORM
Name of Work :- Construction of Ganesh kund at Sabarmati River front at Sahitya Parisad
in navrangpura ward at west zone. (Re-Tender)
Sr.No. Quantity Item Description Per Amount in Rs.
Excavation for foundation up to1.5 m depth
including sorting out and stacking of useful
materials and disposing of theexcavated stuff 115.92 Cmt
upto 50 Meter lead.(A) Loose or soft soil (Sor
Year 2023-24. Item No. 04001A)
1.5 to 3.0 mt.depth (Sor Year 2023-24. Item No.
Conveyance charge of lime murrum building
rubbish earth manure or sludge & execavated rock
1,773.00 and rubbish [Earth]. Upto 0.5 Km Lead (Sor Year
Rent for provide j.c.b Machine for Refilling Work
and Levelling the site as Directed.Rate also
includes all necessary Operating like Diesel, tools 600.00 hrs
and Driver expences etc. comp. ( Based on
Previously approved rate by C E sir )
Providing and supplying of labour for necessary
manual excavation, cleaning, Shifting of Material
4 Or any other, or for any other work as directed by
Engineer In charge. The Rate includes Handcart
Labour charges - Mazdoor (Male) (Day/Night) (Sor
115.00 Year 2023-24.Item No. L022)
Labour charges - Supervision for Machinery (Sor
10.00 Year 2023-24.Item No. L029)
Providing arrengement for double layer Baricating
for protection of site avoid accident by using
160.00 bericating rolls, bamboo, teka , kathi with all
labours etc. Comp. ( Approved Rate )
Providing and laying cement concrete1:4:8
(1-Cement: 4- coarses and:8-hand broken
stone aggregates 40mm nominal size) and
70.00 curing complete excluding cost of formworkin
(A) Foundation and Plinth (upto 10 ton). (Sor Year
P/F good qualitity HDPE plastic cover of requried
size by jointing the pices of cover by special
sewing & using chemical adhesvies to retain water 250.00 smt
in kund. Rate also incl. labour work for setting
cover in situ. ( Approved Rate )
Providing and fixing of 2mm Aluminium/4mm ACP
sheeting fixed with Type-4 Class B High Intensity
Grade Sheeting as per IRC 67:2012 reflective 3,955.08 Smt
sheeting of size including lettering and signs as
applicable.(Sor Year 2023-24.Item No.M1048)
Providing and operation dewatering Pump
including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each
1.00 Pump Set, No payment should be allowed for non
working condition of machinery ) ( Based on
Previously approved rate by C E sir )
Contractor's Sign Addl.C.E.
Mobil No: - (west zone)
AHMEDABAD MUNICIPAL CORPORATION ENGINEER DEPARTMENT
NAVRANGPURA WARD
TECHNICAL SPECIFICATION
Name of Work :- Construction of Ganesh kund at Sabarmati River front at Sahitya Parisad in
navrangpura ward at west zone. (Re-Tender)
General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
Item No 1 Excavation for foundation upto1.5m depth including sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead. (A)Loose or soft soil
Excavationforfoundationupto1.5m depth including sorting out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead. (A)Loose or soft soil. The Work Should be done as per instruction of Engg.Incharge.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any such ordinary excavating
implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls under this category. For materials and
workmanship for earthwork and excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be followed.
The depth of the excavation shall be as per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all obstructions, loose stones,
materials and rubbish of all kind, bush; wood and all type trees shall be removed, as directed. The materials so
obtained shall be the property of the Client and shall be conveyed and stacked as directed, within 50-m. lead.
The roots of the trees coming in the sides of the trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority / Municipal
Commissioner, before cutting shall be cut after obtaining such permission from them. It shall be the Client's
responsibility to obtain such permission from the respective authorities.
The rate of site clearance is deemed to be included in the rate of earthwork, for which no extra will be paid.
After cleaning the site, the centerline of the central verge & other constructions will be given by the Engineer-
in-charge. The Contractor shall assume full responsibility for alignment, elevation and dimension of each and
all parts of the work. Contractor shall supply labours, materials, etc. required for setting out the reference
marks and bench marks made of MS angle iron and embedded in 1:2:4 CC.
They shall maintain the same as long as required and directed.
The excavation shall be carried out in true line and level and shall have the width and depth, as shown in the
drawings or as directed. The Contractor shall do the necessary shoring and strutting or shall provide
necessary slopes to a safe angle or steps, as required or directed, at his own cost.
No extra payment shall be made for such precautionary measures, taken.
The bottom of the excavated area shall be leveled both longitudinally and transversely, as directed, by
removing excess soil and watering, as required. No earth filling will be allowed for bringing it to level, if by
mistake or any other reason, excavation is made deeper or wider than shown on the drawings or as directed.
The extra depth or width shall be made up with sand filling, as specified for the bottom level of the subsequent
finishing at the cost of the Contractor or as directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of supporting all utility
services, lighting the excavated areas, separating and stacking serviceable materials neatly, shoring,
timbering, strutting, bailing out water either sub-soil or rainwater, including pumping at any stage of the work.
Excavated areas shall be kept free of water while masonry or concrete or relevant base works are in progress
and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas wherever required
inlayers, including ramming and watering, ensuring proper compaction etc. complete. The Contractor shall
remove the balance of the excavated quantity from the site of work, to a place, as directed and for all lift.
The lead is the shortest practical route and not necessarily the route actually taken. The decision of Engineer-
In-charge shall be final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the sections shown on the
drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to stepping and sloping back as found necessary, on
account of conditions of soil and requirements of safety. The rate shall include for clearing the site, surface
dressing, making layout for road, fixing permanent grid points with MS iron posts, embedded in C.C. 1:2:4,
placed sufficiently away from the existing traffic lines and establishing bench marks etc.
The rates shall include for necessary shoring, timbering and strutting for protection of sides of the excavated
area, pumping out rain or surface water at any stage of construction so as to keep the excavated area dry, to
the satisfaction of the /Engineer-in-charge. The rate shall include leveling and ramming the bottoms of
excavations to receive concrete, etc. including trimming to slope wherever necessary etc. complete. In filling
clods bigger than 50 mm. shall not be allowed. Only consolidated measurements of filling shall be paid.
Consolidation to be done by mechanical compactor as per relevant item. The rate shall be for a unit of one m3.
Item No 1(A) Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful
materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful
materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil. The Work Should be
done as per instruction of Engg.Incharge.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any such ordinary
excavating implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls under this category. For
materials and workmanship for earthwork and excavation, relevant specification IS: 3764 & IS 1200 (Part I)
shall be followed.
The depth of the excavation shall be as per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all obstructions, loose stones,
materials and rubbish of all kind, bush; wood and all type trees shall be removed, as directed. The materials so
obtained shall be the property of the Client and shall be conveyed and stacked as directed, within 50-m. lead.
The roots of the trees coming in the sides of the trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority / Municipal
Commissioner, before cutting shall be cut after obtaining such permission from them. It shall be the Client's
responsibility to obtain such permission from the respective authorities.
The rate of site clearance is deemed to be included in the rate of earthwork, for which no extra will be paid.
After cleaning the site, the centerline of the central verge & other constructions will be given by the Engineer-
in-charge. The Contractor shall assume full responsibility for alignment, elevation and dimension of each and
all parts of the work. Contractor shall supply labours, materials, etc. required for setting out the reference
marks and bench marks made of MS angle iron and embedded in 1:2:4 CC.
They shall maintain the same as long as required and directed.
The excavation shall be carried out in true line and level and shall have the width and depth, as shown in the
drawings or as directed. The Contractor shall do the necessary shoring and strutting or shall provide
necessary slopes to a safe angle or steps, as required or directed, at his own cost.
No extra payment shall be made for such precautionary measures, taken.
The bottom of the excavated area shall be leveled both longitudinally and transversely, as directed, by
removing excess soil and watering, as required. No earth filling will be allowed for bringing it to level, if by
mistake or any other reason, excavation is made deeper or wider than shown on the drawings or as directed.
The extra depth or width shall be made up with sand filling, as specified for the bottom level of the subsequent
finishing at the cost of the Contractor or as directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of supporting all utility
services, lighting the excavated areas, separating and stacking serviceable materials neatly, shoring,
timbering, strutting, bailing out water either sub-soil or rainwater, including pumping at any stage of the work.
Excavated areas shall be kept free of water while masonry or concrete or relevant base works are in progress
and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas wherever required
inlayers, including ramming and watering, ensuring proper compaction etc. complete. The Contractor shall
remove the balance of the excavated quantity from the site of work, to a place, as directed and for all lift.
The lead is the shortest practical route and not necessarily the route actually taken. The decision of Engineer-
In-charge shall be final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the sections shown on the
drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to stepping and sloping back as found necessary, on
account of conditions of soil and requirements of safety. The rate shall include for clearing the site, surface
dressing, making layout for road, fixing permanent grid points with MS iron posts, embedded in C.C. 1:2:4,
placed sufficiently away from the existing traffic lines and establishing bench marks etc.
The rates shall include for necessary shoring, timbering and strutting for protection of sides of the excavated
area, pumping out rain or surface water at any stage of construction so as to keep the excavated area dry, to
the satisfaction of the /Engineer-in-charge. The rate shall include leveling and ramming the bottoms of
excavations to receive concrete, etc. including trimming to slope wherever necessary etc. complete. In filling
clods bigger than 50 mm. shall not be allowed. Only consolidated measurements of filling shall be paid.
Consolidation to be done by mechanical compactor as per relevant item. The rate shall be for a unit of one m3.
Item No 2 Conveyance charge of earth ,lime, murrum, building rubbish,manual garbage, sludge, excavated
rock ,fly ash, aggregate of any kind etc. comp.up to 5.0 Km. lead.
All the surplus earth & debris remaining on site after sufficient watering shall be carried away immediately
from site of work. to the place within 5 km. distance as directed by the Engineer in charge, so as not to cause
any inconvenience to the public or traffic.
If the instructions of Engineer in charge of work are not followed within 7 days from the site, the work shall be
carried out by the Municipal Corporation at the risk & cost of the contractor & any claim dispute will not be
entertained in the respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be
carried out by the contractor without asking any extra rate. The contractor shall have to cart the surplus earth
after the trenches we will watered and refilled with the sand. The rate of carting including carting of brick bats,
metal, rubble vegetable and garbage, if necessary to clear the road surface.
Mode of measurement shall be for Cmt. Basis
Item No.3 Rent for providing JCB Machine for refilling work and levelling the site as directed. Rate also
includes all necessary operating like diesel, tools and driver expences etc. comp.
The Operator of J.C.B should be wel trained and no breakdown of machinery will be allowed at the time of
work. During breakdown of machinery it the contractor responsibility to immediate repair the machine, or
should be replaced by another machinery within one hour. The Insurance of Vehicle with labour is
compulsory. The Unit Will be considered on Hourly basis. Only Running Condition of J.C.B. will be
considered at the time of billing. No Payment will be made for J.C.B in standby Condition. The rate shall
be for a unit of one Hr. basis.
Item No 4 Supplying ,labour for excavation of all types of soil, levelling work and Security Work to avoid an
accident during Visarjan by pilgrims etc. comp.
Supplying, labour for excavation of all types of soil ,levelling work and securty work to avoid an accident
during visarjan by pilgrims etc com.The Labour at site will be considered for 8 Hours Shift, on Daily basis at
the time of Ganesh Visarjan. It is the whole contractor responsibility that no one public should enter the
ganesh kund premises. Special Labour with security guard should be there at site Near Protection Area, so
to avoid any fatal accident in the pit. The Labours shoud be well trained for visarjan of Ganeshji Murti in
Ganesh Visarjan Kund.
Mode of measurement: The rate shall be for a unit of no basis
Item No 5 Providing arrengement for double layer berricating for protection of site avoid accident by using
bericating rolls, bamboo, teka , kathi with all labours etc. Comp.
Providing arrengement for double layer berricating for protection of site avoid accident by using bericating rolls,
bamboo, teka , kathi with all labours etc. Comp. The Work Should be done as per instruction of Engg.incharge
Mode of measurement: The rate shall be for a unit of rmt basis
Item No 6 : Providing and laying cement concrete1:4:8 (1-Cement: 4- coarses and:8-hand broken
stone aggregates 40mm nominal size) and curing complete excluding cost of formworkin
(A) Foundation and Plinth (upto 10 ton).
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6, Grit shall
conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to M-12.
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the concrete mix shall be
1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm nominal size) by volume. Concrete work shall
have exposed concrete surface or as specified in the item.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond approximately to 1:3:6,
1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by volume respectively.
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by weight (0.0342 Cu. M)
for different proportions of mix shall be as under:
Grade of Total quantity of dry Proportion of fine Quantity of
concrete aggregate by volume aggregate to coarse water per
per 50 Kgs, of cement aggregate 50 Kgs. of
to be taken as the cement
sum of individual maximum.
volume of fine and
coarse aggregates,
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
M-150 (1:2:4) 220 ” aggregate by volume but 32 “
M-200 (1:1 1/2 :3) 160 “ subject to and upper 30 “
M-250 (1:1:2) 100 “ limit of 1:1/2 and lower 27 “
2.4 The water cement ratios shall not more than those specified in the above table. The cement content of the mix
specified in the Table shall be increased if the quantity of water in a mix has to be increased to overcome the
difficulties of placement and compaction so that the water cement ratio specified in the Table is not exceeded.
2.5 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is bound to give a concrete
mix which is just sufficiently wet to be placed and compacted without difficulty with the means available.
2.6 the maximum size of coarse aggregate shall be as large as possible within the limits specified but in no case
greater than surround all reinforcement thoroughly and to fill the corners of the form.
2.7 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are generally considered
2.8 For heavily reinforced concrete members as in the case of ribs of main beams the nominal maximum size of
coarse aggregate should usually be restricted to 5 mm less than the minimum clear distance between the main
bars, or 5 mm less than the minimum cover to the reinforcement whichever is smaller.
2.9 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may not be
important and the nominal maximum size may sometimes be as greater than the minimum cover.
2.10 Admixture may used in concrete only with approval of Engineer-in-charge based upon the evidence that with the
passage of time, neither the compressive strength of concrete is reduced nor are other requisite qualities of
concrete and steel impaired by the use of such admixtures.
3.0 Workmanship:
3.1 Proportioning: Proportioning shall be done by volume, except cement which shall be measured in terms of bags
of 50 Kg. weight. The volume of one such bag being taken as 0.0342 Cu. Meter. Boxes of suitable sizes shall be
used for measuring sand aggregate. The size of the boxes (internal) shall be 35 cms x 25 cms. and 40 cms deep.
White measuring the aggregate and sand, the box shall be filled without shaking ramming or hammering. The
proportioning of sand shall be on the basis of its dry volume and in case of damp sand, allowances for bulkage
3.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be kept in first
class working condition and so maintained throughout the construction. Measured quantity of aggregate, sand,
cement required for each batch shall be poured into the drum of the mechanical mixer while it is continuously
running. After about half a minute of dry mixing, measured quantity of water required for each batch of concrete
mix shall be added gradually and mixing continued for another one and half a minute. Mixing shall be continued till
materials are uniformly distributed and uniform color of the entire mass is obtained and each individual particle of
the coarse aggregate shows complete coating of mortar containing its proportionate amount of cement. In no case
shall the mixing be done for less than 2 minutes after all ingredients have been put into the mixer.
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons, it shall be
done on the smooth watertight platform large enough to allow efficient turning over the ingredients of concrete
before and after adding water. Mixing platform shall be so arranged that no foreign material gets mixed with
concrete nor does the mixing water flow out. Cement in required number of bags shall be placed in a uniform layer
on top of the measured quantity of fine and coarse aggregate, which shall also be spread in a layer of uniform
thickness on the mixing platform. Dry coarse and fine aggregate and cement shall then be mixed thoroughly by
turning over to get a mixture to uniform color. Specified quantity of water shall then be added gradually through a
rose-can and the mass turned over till a mix of required consistency is obtained. In hand mixing quantity of cement
shall be increased by 10 percent above that specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before putting in a new
batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of concrete from the mixture shall
contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be thoroughly cleaned before
changing from one type of cement to another.
3.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of vibration of concrete,
shall be determined by regular slump tests in accordance with I.S. 1199-1959. The slump of 10mm to 25mm. shall
be adopted when vibrators are used and 80mm when vibrators are not used.
3.4 Inspection:
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms to permit him to
inspect and accept the false work and forms as to their strength, alignment, and general fitness but such
inspection shall not relieve the contractor of his responsibility for the safety of men, machinery, materials and for
results obtained. Immediately before concreting, all forms shall be thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One carpenter with helper
shall invariably be kept present throughout the period of concreting. Movement of labour and other persons shall
be totally prohibited for reinforcement laid in position. for access to different parts, suitable mobile platforms shall
be provided so that steel reinforcement in position is not disturbed. For ensuring proper cover, mortar blocks of
suitable size shall be provided so that steel reinforcement in position is not disturbed. For ensuring proper cover,
mortar blocks of suitable size shall be cast and tied to the reinforcement. Timber kapachi or metal pieces shall not
be used for this purpose.
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so transported and
placed that no contemination, segregation or loss of its constituent material takes place.
All form wok shall be cleaned and made free from standing water, dust, show or ice immediately before placing of
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge has been
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh concrete shall not be
placed against concrete which has been in position for more than 30 minutes unless a proper construction joint is
formed. Concrete shall compacted in its final position within 30 minutes of its discharge from the mixer. Except
where otherwise agreed to by the Engineer-in-charge concrete shall be deposited n horizontal layers to a
compacted depth of not more than 0.45 meter when internal vibrators are used and not exceeding 0.30 meter in all
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from a height
exceeding 2 meters. When trunking or chutes are used they shall be kept close and used in such a way as to
avoid segregation. When concreting has to be resumed on a surface which has hardened, it shall be roughened,
swept clean, thoroughly wetted and covered with a 13 mm thick layer of mortar composed of cement and sand in
the same ratio as in the concrete mix itself. This 13 mm layer of mortar shall be freshly mixed and placed
immediately before placing of new concrete. Where concrete has not fully hardened, all laitance shall be removed
by scrubbing the wet surface with wire or bristle brushes, care being taken to avoid dislodgment of any particles of
coarse aggregate. The surface shall then be thoroughly wetted, all free water removed and then coated with neat
cement grout. The first layer of concrete to be placed on this surface shall not exceed 150 mm in thickness and
shall be well rammed against old work particular attention being given to corners and close spots.
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of vibrators, unless,
otherwise permitted by the Engineer-in-charge for exceptional cases, such as concreting under water, where
vibrators cannot be used. Sufficient vibrators in serviceable condition shall be kept at site so that spare equipment
is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse aggregate and
begins to cream up to form an even surface. Compaction shall be completed before the initial setting starts i.e.
within 30 minutes of addition of water to dry mixture. During compaction, it shall be observed that needle vibrators
are not applied on reinforcement which is likely to destroy the bond between concrete and reinforcement.
3.6 Curing: Immediately after compaction, concrete shall be protected from weather including rain, running water,
shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It shall be covered with wet
sacking, hassain or other similar absorbant material approved, soon after the initial set and shall be kept
continuously wet for a period of not less than 14 days from the date of placement. Masonary work over foundation
concrete may be started after 48 hours of its laying but curing of concrete shall be continued for a minimum period
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made, cured and tested at
days or 28 days as per requirements in accordance with I.S. 516-1959. A random sampling procedure shall be
adopted to ensure that each concrete batch shall have a reasonable chance of being tested i.e. the sampling
should be spread over the entire period of concreting and cover all mixing units. The minimum frequency of
sampling of concrete of each grade shall be in accordance with following:
Quantity of concrete No. of Quantity of concrete in No. of samples
in the work samples the works
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made from each sample, five for
testing at 7 days and the remaining five at 28 days. The samples of concrete shall be taken on each day of the
concreting as per above frequency. The number of specimens may be suitably increased as deemed necessary by
the Engineer-in-charge when procedure of tests given above reveals a poor quality of concrete and in other special
3.7.2 The average strength of the group of cubes cast for each day shall not be less than the specified cube strength of
150 Kg/Cm at 28 days. 20% of the cubes cast for each day may have value less than the specified strength
provided the lowest value is not less than 85% of the specified strength. If the concrete made in accordance with
the proportions given for a particular grade, does not yield the specified strength; such concrete shall be classified
as belonging to the appropriate lower grade. Concrete made in accordance with the proportions given for a
particular grade shall not, however, be placed in a higher grade on the ground that the test strength are higher
than the minimum specified.
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to strike the form work.
While fixing the time for removal of form work, due consideration shall be given to local conditions, character for
the structure, the weather and other condition that influence the setting of concrete and of the materials used in the
mix. In normal circumstances (generally where temperatures are above 20 C) and where ordinary concrete is
used, forms may be struck after expiry of periods specified in item No 9.1(A) for respective item of form work.
3.8.2 All form work shall be removed without causing any shock or vibration as would damage the concrete. Before the
soffit and struts are removed, the concrete surface shall be exposed, where necessary in order to ascertain that
the concrete has sufficiently hardened. Centering shall be gradually and uniformly lowered in such manner as to
permit the concrete to take stresses due to its own weight uniformly and gradually. Where internal metal ties are
permitted, the or their removable parts shall be extracted without causing any damage to the concrete and
remaining holes filled with mortar. No permanently embedded metal part shall have less than 25 mm cover to the
finished concrete surface. Where it is intended to re-use the form work, it shall be cleaned and made good to the
satisfaction of the Engineer-in-charge. After removal of form work and shuttering, the Executive Engineer shall
inspect the work and satisfy by random checks that concrete produced is of good quality.
3.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement concrete member and
used for shuttering or any other purpose shall be cut inside the cement concrete member to a depth of at least
mm below the surface of the concrete and the resulting holes be filled by cement mortar. All fine caused by form
joints, all cavities produced by the removal of form ties and all other holes and depressions honeycomb spots,
broken edges or corners and other defects shall be thoroughly cleaned, saturated with water and carefully pointed
and rendered true with mortar of cement and fine aggregate mixed in the proportions used in the grade of concrete
that is being finished and of as dry consistency as is possible to use. Considerable pressure shall be applied in
filling and pointing to ensure thorough filling in all voids. Surfaces which are pointed shall be kept most for a period
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or character as to effect
the strength of the structure materially or to endanger the life of the steel reinforcement, he may declare the
concrete defective and require the removal and replacement of the portion of the structure affected.
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be measured. The concrete laid in
excess of section shown on drawings or as directed shall not be measured. No deduction shall be made for –
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and steps etc.
up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position, vibrating and
compacting, finishing, as directed, curing and all other incidental expenses for producing concrete of specified
strength. The rate excludes the cost of form work.
4.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal
size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies, internals beams girders
and cantilever up to floor two level (C) Columns, pillars, posts and struts up to floor two level (D) Staircase up to
floor two level (E) Vertical and horizontal fins up to floor two level.
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried out for
reinforced concrete work for work as specified in item 1.2. In addition, the following stipulations shall be followed
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar 1:2 (1 cement :
2 coarse sand) about 4 cms x 4 cms section and of thickness equal to the specified cover shall be placed between
the bars and shuttering as to secure and maintain the requisite cover of concrete over the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held in position by
introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with slotes
accurately out in them. The temphtes shall be removed after concreting has been done below it. The bars may
also be suitably tied by means of annealed steel wires to the shuttering to maintain their position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to be attached or
bounced to later on, shall be protected with a coat of thin neat cement grout, if the bars are not likely to be
incorporated with succeeding mass of concrete within the following 10 days. This coat of thin neat cement shall be
removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Item No 7 : P/F good qualitity HDPE plastic cover of requried size by jointing the pices of cover by special sewing
& using chemical adhesvies to retain water in kund. Rate also incl. labour work for setting cover in
P/F good qualitity HDPE plastic cover of requried size by jointing the pices of cover by special sewing &
using chemical adhesvies to retain water in kund. Rate also incl. labour work for setting cover in situ. The
Work Should be done as per instruction of Engg.incharge
For detailed specification refer R.A.
Mode of measurement: The rate shall be for a unit of smt basis
Item No 8 Providing and fixing of 2mm Aluminium/4mm ACP sheeting fixed with Type-4 Class B High Intensity
Grade Sheeting as per IRC 67:2012 reflective sheeting of size including lettering and signs as
applicable.(Sor Year 2023-24.Item No.M1048)
Making necessary diversion board as per trafic requirment of size 0.90X0.60 with 2mm Aluminium/4mm
ACP sheeting fixed with Type-4 Class B High Intensity Grade Sheeting The Work Should be done as
per instruction of Engg.incharge.
For detailed specification refer R.A.
Mode of measurement: The rate shall be for a unit of Smt Basis.
Item No 9 Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed
etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working
condition of machinery )
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc.
comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working
condition of machinery )The Work Should be done as per instruction of Engg.incharge.
Mode of measurement: The rate shall be for a unit of Shift basis
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Conctractor's Signature Additional City Engineer
Address & Mobile no. ( West Zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl –vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj
fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb
<&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu
mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk
ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh
fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe
mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
16. mœh xuLzhbtk ” dwsht< mhfth ©e lt ©b,ftiNÕg rJftm ylu htusdth
rJCtd,mraJtjg,dtk^eldh lt XhtJ ¢btkf: LED/WRT/e-file/11/2024/0293/M2
Dt.15.02.2024” bwsc awM<vKu ybj fhJtltu hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe
fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Important Note:-
As well as Considered Item Specifications as Per Item Given, not by serial number, the specifications of items which are
not mentioned in BOQ Item, Specifications should be considered as per AMC Sor Current Approved Rates for Civil and
Electrical Works, as per Available on Site of Ahmedabadcity.gov.in All the Specifications should be Considered as per
Schedules Rates of R & B Division of both civil and Electrical Works. Hence it an ARC Tender All the Quantity Would Vary
as per Instruction of Engineer in Charge. No Rate would be given Extra for Increase or Decrease in the Quantity of The
BOQ Scheduled Items.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
(A) Guarantee issued by following bankswill be accepted as SD/EMD on permanentbasis.
(1) All Nationalized Banks including the Public Sector Bank-IDBI LYF.
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to
(1) Commercial Banks :
(1) Kotak Mahindra Bank
(2) RBL Bank (The Ratnakar Bank Ltd.)
(3) IndusInd Bank.
(4) Karur Vysya Bank.
(6) FEDERAL Bank.
(7) SOUTH INDIAN Bank.
(2) Co-Operative Banks of Gujarat
(1) The Kalupur Commercial Co-Operative Bank Ltd.
(2) Rajkot Nagarik Sahakari Bank Ltd.
(3) The Mehsana Urban Co-Operative Bank Ltd.
(4) Nutan Nagarik Sahakari Bank Ltd.
(5) Saurashtra Gramin Bank.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no
4 Permanent account no. (PAN no.)
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
SPECIAL CONDITION OF CONTRACT
1.0 The Contractor shall have to maintain all required registers for quality control, material management and
progress of the work as per the AMC's prevailing circulars and as directed by engineer- in-charge on daily basis.
1.1 Contractor has to manage proper storage of all the materials.
1.2 Contractor has to use good shuttering material for the project.
1.3 Contractor has to take all risk policy & workman compensation policies of the project & should be effective up to
handing over the possession. Incase of any Incident i.e. fatal accident that occurs at site, complete responsibility
will be of the Contractor.
1.4 Contractor is responsible for all liasioning for seeking all the permission required during the construction.
1.5 Municipal Commissioner reserves the rights to reduce / increase the scope of work up to any extent without
assigning reason thereof and the contractor has to execute the BOQ items at his tender rate
1.6 All rates quoted by the contractor to be inclusive of all applicable taxes (GST).
1.7 The Contractor shall make his own arrangements for the engagement of all staff and labour, local or other, and
for their payment, housing, feeding, transport and other facilities according to prevailing labour laws.
1.8 AMC may at its discretion no coplains/no work for a period, single or multiple works at any given time. once
the work is given by SMS, Phonecalls, Whatsapp, Letter; the contractor has to attend the work within 24 hours.
Failure of the same shall invite penalty of 10,000/- per occurance. Repeated failure of more than 3 times, the
contractor shall be blacklisted. No further claim shall be entertained and the work shall be carried out of
current market rate and supervision charges of 27% at the risk and cost of contractor after the due date of
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at different sites
simultaneously. Contractor's having labour force available during festivals shall only apply. Contractor can not
stop the work due to on availably of labour force. In case progress is delayed, contractor shall be penalized 0.1%
of Tender amount per day for work done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then contractor shall not
claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by the Engineer-
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean as a
reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific mention of a
particular point or aspect, the provisions on these particular points, or aspects in the relevant Indian Standards
shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to the following
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and not necessarily
the route actually taken. The decision of the Engineer-in-charge in this regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it, specifications shall
be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work is in the form
of a designation containing the number of the specification of the material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the contractor
from the responsibility of replacing defective material brought on site or materials used in the work found
defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials shall be stone at
site of work in a systematic manner. Materials shall be stored in such a manner as to prevent damage,
deterioration or intrusion of foreign matter and to-ensure the preservation of their quality and fitness for the
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the site of work
within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers and in good
working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for checking lines,
levels, alignment of the works during execution shall be kept in sufficient numbers and in good working condition
on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or over loading of the
various components of the structure during execution or after completion of the structure.
29. All necessary safety measures and precaution (including those laid down in the various relevant Indian Standards)
shall be taken to ensure the safety of men, materials and machinery on the works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent towards
testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days (120) from
opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to the
Corporation Security Deposit of 5% (five percent) of the contract price cheque or Bank Guarantee, pay order, or
demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE & STAMP ADDL.CITY ENGINEER
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 01 Monthafter the order to start the works. Progress of work should be in
proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall
arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for any
damage to public. If any incident happen, during the execution of work. In case of dispute for unseen or overlooked
items the decision of the Dy. City Engineer shall be final. The contractor shall have to give site clean of all rubbish
during the work and at the time of completion of work and hand over the site with final finishing of the work as
directed. All the rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall
be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available in SOR
than based on current market rates. In case of extra item decision of Add. City Engg. shall remain final regarding
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the
contractor shall carry out the same at his quoted rates without charges any extra and the contractor will have to
carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for subsequent changes in
site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for this
work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the period. If
any tenderer withdraw or makes any modifications or addition in the terms and conditions of his tender not
acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any right or remedy
be at liberty to forfeit in full the said earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty of
Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand
draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can
be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building
Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the Employer”) invites sealed Tender
document from reputed and qualified bidders for the construction of Works detailed in the Table below:-
Sr. Name of Works Approximate Earnest Completion
No. value of works (Rs.) Money Period
1 Construction of Ganesh Kund at Rs. 14,99,475.13 Rs.15,000/- 01 Months
Sahitya Parisad Near Sabarmati
river front in Navrangpura ward
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs.900.00 in the form of Demand Draft / Pay Order
from any Nationalised Bank in favour of MUNICIPAL COMMISSIONER, Ahmedabad, payable at Ahmedabad, which
shall be non refundable.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works in the above
Table payable at Ahmedabad and drawn in favour of MUNICIPAL COMMISSIONER, Ahmedabad, payable at
Ahmedabad,. Earnest Money Deposit will have to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd Floor,Dr. Ramanbhai Patel
Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad Municipal Corporation, 2nd Floor,
Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
in the presence of bidders or their representatives who choose to attend. In the event of the specified date of bid
submission/opening being declared a holiday for the Employer, the bids shall be received /opened on the next
working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender fee & EMD (Draft
/DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate envelope (marked as
“original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/ Hand Delivery in duplicate. The
Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the bidder.
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received for the package
(except those received late) containing the sealed Tender volume and other enclosures then announce the names of
bidders in the presence of bidders or their representatives who choose to attend on the date and time mentioned in
the NIT In the event of specified date of bid opening being declared as a holiday for the Employer, the Tender will be
opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at the opening will
announce bidder’s names, , the presence/or absence of EMD, the amount and validity of EMD furnished with each
bid, is valid registration and such other details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation for Bid and has
not been furnished in the form, the bid shall be rejected by the Employer as non-responsive and the Tender volume
will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid EMD will be
taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall be rejected as non-
responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed, meets the
eligibility and qualification criteria, has the required available bid capacity, is accompanied by the requisite
certificates, undertaking and other relevant information specified in the bid documents and is substantially responsive
to the requirement of the bidding documents and provides any clarification for ascertaining the correctness of the
information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not subsequently be
made responsive by correction or modification or withdrawal of the nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be substantially
responsive in accordance with Clause 2 and qualified for award of Contract in accordance with Clause 5 (General
Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and time. In the
event of specified date of bid opening being declared bidders who qualify the criteria then bidder bid will be
considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially responsive to
the bidding documents and who has offered the lowest Evaluated Bid Price, provided that such bidder has been
determined to be (i) eligible in accordance with the provisions of Clause 3(General Terms and Condition); and (ii)
qualified in accordance with the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the successful
bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This letter shall name the sum
which the Employer will pay the Contractor in consideration of the execution, completion and maintenance of the
Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving letter of Indent.
Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion, ask any
bidder for authentication the correctness of the information/details furnished by him in his bid. Such request by the
Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from the time of
bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison or contract
award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and recommendations for
the award of a contract shall not be disclosed to bidders or any other persons not officially concerned with such
process until the award to the successful bidder has been announced. Any effort by a bidder to influence the
Employer's processing of bids or award decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own
responsibility all information that may be necessary for preparing the bid and entering into a contract for
construction of the Works. The costs of visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its premises and
lands for the purpose of such inspection, but only upon the express condition that the bidder, its personnel and
agents, will release and indemnify the Employer and its personnel and agents from and against all liability in respect
thereof and will be responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the Employer will in no
case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid for 28 days
beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly as Early as
possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when the bidder has
furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful bidder shall deliver
to the Employer, a Initial Security Deposit Shall be submitted as per C.E. Circular.in the form of a Bank Guarantee/
DD/Locle MICR cheque for an amount equivalent to 5% (five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a policy is
framed by Audit department of AMC to charge 4% interest for the balance period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per format shall be
issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released along with release
of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the same.
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. & As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding GST) etc. on material
procurement or any other component for the works from any source shall be borne by the contractors.
10. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road i.e. public and
vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers, traffic signs as per design,
safety tapes etc. to be arranged at site. Necessary florescent marking on traffic signs to be provided so that it should
be visible at night. During night working hours safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary diversions for proper
working at site including traffic signages, safety cones, traffic blinkers, barricading tapes, red and green flags etc for
making easy smooth and safe conditions for the traffic. The Contractor shall and must provide above at his own
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new connection on
behalf of AMC. It includes filling the necessary application to power Supply Company, follow up and getting the
supply, filling the necessary test reports to the power supply company. All official fees including security deposits and
other expenses shall be of initially paid by the contractor.
Contractor shall not sub-let the work without permission of the authority.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall be deducted
against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration with any other state Govt.
or institutions. Copy of registration should be attached with tender document. Tenderer who was not registred in AMC
must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources Department with the correction
slips made up to 15-08-1999 may be referred. (only English version) Clause No. -2 liquidated damages for delay shall be
overrule by A.M.C.’s M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by the Engineering in
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean as reference to the
latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific mention for a
particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to the following limits
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its specifications shall be deemed
to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant shall not absolve the
contractor from the responsibility of replacing defective materials brought on site or materials used in the work found
defective at a later date. The contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/ Architect before using them in
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed from the site of work
within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking lines, levels,
alignment of the works & all precautionary measures during execution shall have to be kept in sufficient numbers and in
good working condition at the site of the work. All excavated trench shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be adopted by the
contractor shall be considered only if the contractor provided satisfactory evidence that such special mode of
construction and completion of work to the required strength and quality. Acceptance of the same by the Engineer in
charge shall not however, absolve the contractor from the responsibility of any adverse effect and concordance of
adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor Mineral Act", and
such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian Standard) shall be
taken to engrave the safety of men, materials and machinery on the work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the quantum of actual work for
which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be executed & as per the
instruction of Engineer in charge & as per the guidance of AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the contractor. The contract
agreement shall have to be executed between AMC & the agency to which work is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned tender and
resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order shall be issue to contractor and
the time limit shall be start from the date of issue of the written work order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned tender and
resolution .Within 15 days contractor has to submit SD and after reciveing SD work order shall be issue to contractor and
the time limit shall be start from the date of issue of the written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand draft / cheque or Bank
Guarntee of nationalized bank/scheduled bank only. Contractor shall have to sign contract paper with AMC. The
contractor shall be fined 4% of interest per year for delay in submission of S.D and shall be deducted from contractor’s
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by M.C. Or His Designeted
Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or specification and the Engineer -in-
charge shall make such corrections and interpretations as necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation. will be payable by the
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the rates keeping in
view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for the construction of the
works and provide a satisfactory supply of potable water for drinking, washing, sanitation and cleaning down. The
contractor will be responsible for all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate removal of any distribution
system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor must make his own
arrangements with the Corporation and Electricity Supply Authorities and with other contractors to connect and to take a
supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of the work and shall
pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the work. No
compensation shall be paid for idle labor staff, machineries and for use of diesel operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria mentioned above along
with the bid. They shall have also to submit the income tax clearance certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government approved licensed electrical
person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total amount of work
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total amount of work
increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the contractors.
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will be rejected. Municipal
Commissioner reserves the right to increase/decrease the scope of work. No any claim to that effect shall be entertained.
The Municipal Commissioner also reserves the right to reject any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special reason (like site is not
available and due to unavoidable circumstances arise), after evaluation of situation the actual date of starting of work
will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope of work.
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work done by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 01 months after the order to start the works. Progress of work should be in proportion to
time limit. The details of reinforcement of R.C.C. work shall be as per design and instructions of Add. City Engineer and
his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought by him
on site. This account shall be regularly maintained and kept open for inspection by Municipal Staff. Watering of all the
items shall be as per instructions otherwise no payment shall be made to contractors. Mixing of concrete shall be done
by concrete mixer machine. Arrangements of binding vibrator for R.C.C. works if required shall have to be made by the
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall
arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for any
damage to public. If any incident happen, during the execution of work. In case of dispute for unseen or overlooked
items the decision of the Dy. City Engineer shall be final. The contractor shall have to give site clean of all rubbish during
the work and at the time of completion of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart
daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be allowed to
mix the mortar either on floor or any finished surfaces. The contractor shall have to make his own
arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall be
paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available in SOR than based
on current market rates. In case of extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the
contractor shall carry out the same at his quoted rates without charges any extra and the contractor will have to carry
out the works and he will be paid at the rate quoted by him. No claim for extra rate for subsequent changes in site and
design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to prepare the
measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully responsible
for compliance of the various provisions under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of the tenders for this work
and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the period. If any tenderer
withdraw or makes any modifications or addition in the terms and conditions of his tender not acceptable to the
Municipal Corporation the Municipal Corporation shall without prejudice to any right or remedy be at liberty to forfeit in
full the said earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of start shall be
recovered separately from the immediate bills payable to the contractor. Contractor has to make his own arrangement
for procurement of steel and cement.
Contractors should note the following conditions carefully:-
v) Conditional tender shall not be accepted.
vi) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
vii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand draft
viii) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can be is
available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building Works &
and Road Works Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADD.CITY ENGINEER
& STAMP (West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 18.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].