| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC JOTANKUR TEGHORIJOTEVIRAM PURBA MEDINIPUR | MEDINIPUR EAST | WEST BENGAL | 721627 | ₹4.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 Cr+₹42.5 L (9.07%)Rejected-Finance GRAIN MARKET GONIANA BATHINDA | BATHINDA | BATHINDA | PUNJAB | ₹5.1 Cr+₹42.5 L (9.07%) | L2 | Rejected-Finance second lowest |
| 3 | L3₹7.8 Cr+₹3.1 Cr (66.9%)Rejected-Finance 40 SAPTHAGIRI COLONY JAFFERKHANPET CHENNAI TAMIL NADU 600083 | CHENNAI | TAMIL NADU | 600083 | ₹7.8 Cr+₹3.1 Cr (66.9%) | L3 | Rejected-Finance Third lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
Tender Value
₹4.0 Cr
EMD Value
₹4.0 L
Closing Date
10 Feb 2021, 1:00 pmClosed
Chief Engineer, KSTPS, Kota
New Adm. Building, Kota Super Thermal Power Station, Sakatpura, Kota
Assistance in Operation of Wagon Tipplers, Stacker-cum-Reclaimer and IMWB and Unloading, Crushing Conveying, Feeding of Coal to Boiler Bunkers and Associated works in CHP area, KSTPS, Kota
2021_RRVUN_210863_1
4864
Open Tender
Repair and Maintenance Works
Percentage
365 days
Kota Super Thermal Power Station
As per QR mentioned in Tender documents
2 documents required · 2 mandatory
₹1,180
Digitally as mentioned in tender documents
₹4.0 L
Yes
12 Nov 2021
20 Jan 2021
11 Feb 2021
20 Jan 2021
10 Feb 2021
20 Jan 2021
Provide Unskilled man power as per clause No.-4.00 of section-C for the work of Unloading, Crushing conveying, Feeding of coal to boiler bunkers unit 1 to 7 and as per scope of work detailed under section-C PART-A, B & C as and when required round the clock.
Provide Semi skilled man power as per clause No.-4.00 of section-C for the work of Unloading, Crushing conveying, Feeding of coal to boiler bunkers unit 1 to 7 and as per scope of work detailed under section-C PART-A, B & C as and when required round the clock.
Provide Skilled man power as per clause No.-4.00 of section-C for the Supervisory work of Unloading, Crushing conveying, Feeding of coal to boiler bunkers unit 1 to 7 and as per scope of work detailed under section-C PART-A, B & C as and when required round the clock.
Provide Highly skilled man power as per clause No.-4.00 of section-C for assistance in operation of Wagon tipplers, Stacker-cum-Reclaimer, IMWB and as per scope of work detailed under section-C PART-A, B & C as and when required round the clock.
Extra man power to be provided during rainy season/ As and When required during other season/bunching of coal rakes, as per written consent / direction of work executing authority as per clause No.-5 under section-C as and when required round the clock.
Supervisor
Unskilled workman
Provide Unskilled man power in General duty (09:00 Hrs to 17:00 Hrs) as per clause No.-4.00 of section-C for the work of as per work scope of Section-C PART- A, B & C
Bidder Name
Amount
S.B.Construction Co(GSTN-08AAEFS2040L1Z7)
CHENNAI RADHA ENGINEERING WORKS PRIVATE LIMITED(GSTN-08AACCC6068R1ZZ)
Gobind Ram and Company(GSTN-03AACFG6780F1ZL)
Gobind Ram and Company
CHENNAI RADHA ENGINEERING WORKS PRIVATE LIMITED
Gobind Ram and Company
CHENNAI RADHA ENGINEERING WORKS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .