Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAccepted-AOC CHERKALA CHENGALA KASARGOD KERALA 671541 | KASARAGOD | KERALA | 671541 | ₹20.1 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹21.0 L+₹90,018.45 (4.49%)Rejected-AOC | ₹21.0 L+₹90,018.45 (4.49%) | L2 | Rejected-AOC second lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Third lowest |
| Sl No | Description | Qty | Unit | BM ABDHULLA L1 | ASHIF T.A L3 | ABOOBACKER K L2 |
|---|---|---|---|---|---|---|
| 1.00Civil Works | ||||||
| 1.00 | 15.10.2:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar | 3.28 | cum | 2,280.83 ₹7,474.28 Lowest | 2,496.6 ₹8,181.37 | 2,392.78 ₹7,841.13 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 3 | each | 422.3 ₹1,266.9 Lowest | 462.25 ₹1,386.75 | 443.03 ₹1,329.08 |
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 11.88 | sqm | 43.33 ₹514.67 Lowest | 47.42 ₹563.3 | 45.45 ₹539.88 |
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 43.46 | cum | 503.32 ₹21,876.3 Lowest | 550.93 ₹23,945.8 | 528.02 ₹22,949.96 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.91 | cum | 6,082.17 ₹35,963.87 Lowest | 6,657.55 ₹39,366.12 | 6,380.69 ₹37,728.99 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.86 | cum | 6,569.98 ₹18,803.28 Lowest | 7,191.51 ₹20,582.11 | 6,892.44 ₹19,726.16 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 31.2 | sqm | 296.07 ₹9,237.38 Lowest | 324.07 ₹10,111.08 | 310.6 ₹9,690.59 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 107.02 | sqm | 584.91 ₹62,594.73 Lowest | 640.24 ₹68,516.17 | 613.62 ₹65,666.77 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 41.09 | sqm | 773.26 ₹31,771.71 Lowest | 846.41 ₹34,777.16 | 811.21 ₹33,330.87 |
Tender Value
₹24.0 L
EMD Value
₹50,000
Closing Date
16 Mar 2026, 5:30 pmClosed
Managing director
KHRWS, General Hospital Campus, Red cross Road, Tvpm - 695035
NAM - CONSTRUCTION OF GOVT. AYURVEDA DISPENSARY BEDADKA IN KASARGOD DISTRICT- Civil and Electrical Works
2026_KHRWS_844305_1
66/2025-26/KHRWS
Open Tender
Civil Works - Buildings
Item Rate
240 days
Bedadka
Registration certificate of KHRWS
8 documents required · 8 mandatory
₹2,500
₹50,000
25 Jul 2026
7 Mar 2026
18 Mar 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 0.999 | 15.10.2:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar | - | cum | - | - |
| 0.000 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | - | - |
| 0.999 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | sqm | - | - |
| 0.000 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 1 | cum | - | - |
| 0.999 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 0.000 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 0.999 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 0.000 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.4 | sqm | - | - |
| 0.999 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Agreementformat.pdf
Tender Documents • 0.10 MB
Tender_conditions_2019revisedlatest.pdf
Additional Documents • 0.38 MB
RevisedGeneralConditionsforeTendering.pdf
Other Document • 0.41 MB
MOUCivilElectrical.pdf
Other Document • 0.12 MB
BOQ_1427403.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .