PROJECT ENGINEER CIVIL GARJANBAHAL OCP BASUNDHARA
PROJECT OFFICER PO OFFICE, GARJANBAHAL OCP, BASUND
Providing 1000m barbed wire fencing along with garland drain under GOCP of Basundhara Area
2026_MCL_360270_1
MCL/BA/PO/GOCP/Civil/E-Tender/ 26-27/09 dtd 26/05/2026
Open Tender
Civil Works - Others
30 days
PROJECT OFFICER PO OFFICE, GARJANBAHAL OCP, BASUND
AS PER NIT
3 documents required · 3 mandatory
₹11,800
29 May 2026
29 May 2026
9 Jun 2026
29 May 2026
8 Jun 2026
29 May 2026
29 May 2026 - 1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 24.05 | cum | 217 | ₹5,218.85 | BI01010001010000000000000515BI0100001119 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 3.01 | cum | 910.15 | ₹2,739.55 | BI01010001010000000000000515BI0100001120 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.01 | cum | 4,826.85 | ₹14,528.82 | BI01010001010000000000000515BI0100001121 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 27.05 | cum | 7,009.05 | ₹1,89,594.8 | BI01010001010000000000000515BI0100001122 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete | 120.24 | sqm | 283.1 | ₹34,039.94 | BI01010001010000000000000515BI0100001123 |
| 6 | "G.I Barbed wire Fencing 1.8 metre high Providing and fixing 1.8 metres high GI barbed wire (weighing 9.38 kg per 100 mts.) fencing with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 808
" | 1,000 | meter | 544 | ₹5,44,000 | BI01010001010000000000000515BI0100001124 |
| 7 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | - | Nos | - | - | BI01010001010000000000000515BI0100001154 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Tendernotice_2.pdf
PDF • 2.36 MB
Tendernotice_3.pdf
PDF • 1.51 MB
BOQ_373136.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid