| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 CrAccepted-AOC SCO 36 SECTOR 7 C MADHYA MARG CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | ₹8.2 Cr Quoted ₹8.4 Cr | L1 | Accepted-AOC Qualified |
| 2 | L2₹8.7 Cr+₹23.9 L (2.83%)Rejected-Finance | ₹8.7 Cr+₹23.9 L (2.83%) | L2 | Rejected-Finance 2 Lost |
| 3 | L3₹8.8 Cr+₹37.6 L (4.45%)Rejected-AOC | ₹8.8 Cr+₹37.6 L (4.45%) | L3 | Rejected-AOC NonQualified |
Tender Value
Refer Docs
Closing Date
15 Nov 2021, 5:00 pmClosed
Superintending Engineer
Office Of Superintending Engineer Construction Circle Uttarakhand Peyjal Nigam Pauri
Surveying, Design, Supply, Cartage laying Jointing of GI API Pipe of 15mm to 65 mm dia by Socating Electric arc welding, Const. of R.C.C Wet Intake Well of 6.00 m internal dia 15 M height, RCC Circular Sump CWR 2 KL to 70 KL Capacity, Pump House,
2021_MDPEY_37676_1
2727/NIVIDA QUOTATION/48 DATED 16.10.21
Open Tender
Civil Works - Water Works
Item Rate
365 days
Pauri Garhwal
As per Tender Document
5 documents required · 5 mandatory
₹5,900
EE C D Uttarakhand Peyjal Nigam Kotdwar
Exempted
Pauri Garhwal
4 Jul 2025
22 Oct 2021
17 Nov 2021
22 Oct 2021
15 Nov 2021
30 Oct 2021
22 Oct 2021 - 28 Oct 2021
28 Oct 2021
Amount
Supply of all materials, labour, T&P, diversion of river water making coffer dam, dewatering etc required for construction of one no circular water tight RCC wet intake well of 6.00 m internal dia & 15.00 m height with Pump house 4.00 m height designed to with stand safely the effects of seismic effect, wind effect and water current forces in THAWADA River near THAWADA Village by well sinking or open excavation as per site requirement on 8 T/m2. Details of works will be as follows----
(a) Testing of bearing capacity of soil from a recognized University in the presence of site in charge.
(b) The detailed structure design and drawing or the foresaid intake well showing all details based on BC report should be supplied by the contractor within 15 days from the date of acceptance .
(c) The floor of intake well shall be 5.00 m below the LWL .
(d) Intake well have 4 nos RCC inlet channels internal size 75cmX 75cm extending radially upto a distance of 4.00m from the outer face of intake well. These inlet channels shall be properly supported and embeded in the river bed. So as to withstand the damaging effects due to excessive water current and flowing debris during floods rainy season. The projected length of the channel out side the wall may vary as per site requirement.
(e) Three nos 150 mm dia GI (Medium) perforated pipes for inlet with proper sluice valve arrangement will be grouted in the intake well at proper place. These pipes will pass through the inlet channels and shall be covered with pebbles around it. The perforated pipes shall be arranged by the contractor.
(f) The RCC shaft of intake well will be one meter above HFL.
(g) The circular pump house above the shaft of intake well will be of 23 cm thick brick masonry in 1:6 cement and coarse sand mortar.
(h) The floor of pump house i.e. deck floor slab capable of accommodating to motors of 440 LPM discharge and pumping head 65mtrs V.T. pumps shall have 0.6m opening on either side of the centre of floor throughout the dia as shown in drawing. This opening will also provide acess for the stair case . The opening will covered by the MS Jal as per direction of Engineer –in-charge.
(i) One meter wide circular balcony shall be provided all around the outer face of intake well shaft. This balcony shall have 1.2 m high, RCC railing post at a distance of not more than 2.5m. The railing post shall support three rows of 20mm dia GI pipe of medium quality, the pipe will be supplied by the contractor.
(j) The roof of pump house will be 4.50 m above the floor level of pump house and will be projected 1.00m all around the outer face of wall of pump house will proper slope for drainage.
(k) One M.S. girder of suitable size and 6.50 m length will be fixed 30 cm below the roof level along the diameter of pump house in the centre of opening left in the floor of pump house. (item no ‘h’) as per direction of Engineer – in –charge.
(l) The Pump house will be provided with one door of 1.2m x2.1m and 3 fully glazed windows of 1.2m x 1.8m. The door and windows will be provided with 50x50x6 mm angle iron frame,1mm thick MS sheet door and glazed Z- section window of 4 mm thick glazing or as per direction op Engineer in charge as per site requirement .
(m) Suitable provision for 2.50 m wide and 15m span RCC foot bridge for making approach path to intake well shall be made with railing of 20 mm dia GI (M) pipe in 3 rows and RCC railing posts, pipes to be arranged by the contractor.
(n) All masonry works should be plastered on both face with 1:6 cement, coarse sand, mortar 20 mm thick.
(o) Three coat of approved snowcem shall be done on exposed surface of intake well and pump house. All railing and wood work or steel works shall be painted with one coat of approved primer and two coats of approved with colour paint. The ladders/ railings of intake well shall be painted with anticorrosive paint. Two coats and over two coats of enamel paint, Inside the pump house one coat whitewash and two coats of dry distemper, three coats of whitewash on ceiling shall be done as per instruction of Engineer –in- Charge.
Rates per meter variation in height / depth of intake well shaft on either side.
Per meter increase
Per meter decrease
Rates per meter variation in Length of R.C.C foot bridge on either side.
Per meter increase
Per meter decrease
Rates per 0.5 T/m2 variation in bearing capacity of soil
Per 0.5 T/m2 increases in BC
Per 0.5 T/m2 decreases in BC
Supply of all materials, labour, T&P etc Complete & Construction of Pump House as per deptt design & drawing in FPS Bricks 7.00 x 5.00 x 4.50 m in size including supply of all labour material T&P etc complete as per approved designed & drawing including all neceassary arrangements required for installation of motor & Pumps.
Supply of all materials, labour, T&P etc Complete & Construction of Staff Quarter for chukidar (Type -I) as per deptt design & drawing including electrification etc.complete.
Excavation in soil mixed with shingle boulders etc requiring the use of specials T&P etc such as pick axes etc for foundation in building works including lift up to 1.5 m, lead up to 50 m, refilling watering & ramming of excavated earth into the trenches and the side of the foundation trenches into the plinth and disposal of surplus earth up to a distance of 50 m from the foundation for protection work .
Same as item no 1 above but in medium rock for building work (for protection work).
Excavation of earth for pipeline in following strata, lift upto 1.5m and lead upto 30m including refilling, watering and ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour and T&P etc. all complete.Assuming that 90% pipeline is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shingle, bajari & boulders and rest 25% in medium rocks. API Pipe will be laid at 1.00 M depth from ground level.
Same as item no 3 above but in medium rock for pipeline work .
Supply, cartage, laying & jointing, testing & comissioning including anticorrosive paint on inner and outer surface of pipe by electric arc welding and specials lowring into trenches and laying true to alignment and gradient etc. complete length as per surveying & design done by the contractor (Including testing of pipe line and cutting of pipe for making of the length excluding the cost of exacavation in trenches.
From Intake Well-1 to MPS API Pipe, Grade-X-56, 65 mm Dia 4.0 mm Thickness
From MPS to I.P.S. API Pipe, grade-X-56, 65 mm Dia 4.0 mm Thickness
From IPS toTOP CWR AP Ipipe , grde X-56, 65 mm Dia 4.0 mm Thickness
Survey, design, supply carting, laying & jointing of G.I.(M) class pipe by socketing for Feeder Main/Distribution System of following sizes including provision of specials and other appurtenant works such as scouring arrangement at suitable locations by fixing tee etc. complete and also testing & commissioning of laid pipeline including supply of all materials, labour, T&P etc. complete. G.I. (Medium Quality) As per IS 1239 Part I : 2004
15mm dia
20mm dia
25 mm dia
32 mm dia
40 mm dia
Supply and fixing of the following fittings including cartage of materials, labour, T&P etc. complete
G.M. gate valve
25 mm dia
32 mm dia
40 mm dia
Wheel Valve (Class I) C.I.
20 mm dia
25 mm dia
32 mm dia
40 mm dia
50 mm dia
Supply & fixing of following sizes of valves including carting the same up to side of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect
65 mm dia Sluice Valve ( P.N 1.6 )
65 mm dia CI/DF Reflux Valve of 150 ASA
65 mm dia CI/DF sluice Valve of 150 ASA
C.I. Air valve (Double Acting) 80 mm
Supply of all materials, labour, T & P etc. and Construction of size Sluice Valve / Reflux Valve / Scour Valve Chamber as per type design complete(1.2x1.2x1.2)
Supply of all materials, labour and T & P etc. and construction of Metering room for Electricity (size 3.66 x 3.05 x 3.05 given by E& M kotdwar ) as per type design and drawing
Suppy of all labour,material, T&P. ect. complete for construction of following type of chambers as per departmental type design and drawing with FPS Bricks.
Gate Valve/ Wheel Valve/ Air Valve chamber .60 x .60m x .60 m in size
Const. BPT chamber 1.0 x 1.0 m x 1.0 m in size
Making 2 M wide Briddle Path for rising main including hill side cutting and coolie walling of all materials, labour, T&P etc.
Random rubble stone masonry in 1:6 cement and local sand mortar for protection work on pipe line, treatment site & where ever required as per site requirement including supply of all materials T&P etc required for proper completion of work as per direction of Engineer-In-Charge.
Random rubble stone masonry in 1:4 cement and local sand mortar for protection work on pipe line, treatment site & where ever required as per site requirement including supply of all materials T&P etc required for proper completion of work as per direction of Engineer-In-Charge.
RR stone masonary laid in dry for protection work on pipe line,where ever required including supply of all material labour T&P etc for completion of work as per direction of Engineer-In-Charge.
Stone Pitching /Collie walling including supply of all labour, material, T&P etc.complete.
Providing & laying PCC 1:2:4 in cement, coarse sand and 20 mm gauge approved stone ballast, including supply of all materials, labour , T&P etc required for construction of Thrust Blocks and other works as per site requirement and direction of Engineer-In-Charge.
PCC 1:4:8 with cement, local sand and 40mm stone ballast including supply of all labour, material,T&P etc. for proper completion of the work where ever required as per site requirement and direction of Engineer-In-Charge.
T.M.T. Bars in plain work such as RCC or RB work (when not including in overall rates) wrought to required shape as necessary including bending for Proper completion of work and including supply of steel and wastage.
RCC work with cement coarse sand and 20mm gauge approved stone ballast in proportion of 1:1.5:3 in foundation, column, slab, chajja, beam, lintal excluding supply of reinforcement and its bending but including its binding with 0.5mm thick binding wire Centring and shuttering (to be supplied by the contractor) and also including supply of all materials labour T&P etc. for proper completion of work upto plinth V level.
For Columns
For Beam
For Slab & Chajja
Raft Foundation of Breast Wall
For Breast Wall in Superstructure
Centring and shuttering for foundations, footings, bases of columns, etc. for mass concrete.,
Centring and shuttering for slab,chajja etc. for mass concrete.
Centring and Shuttering for Beam,Lintal.
12 mm thick plaster in 1:6 cement sand mortar including all martial labour T&P for proper completion of work
Same as item no 30 but in 1:4 cement sand and mortar.
Supply of all materials and construct 150 mm S.C. drain including supply of all labour T&P etc complete
Supply & laying of drainage 250 mm dia. RCC NP2 pipe
Supply & Fixing M.S. door with Size 3.60x2.10 m (Clear Size) including locking arrangement including Supply of all accessories fixing arrangement in all repect complete.
Construction of boundary wall 1.50 m height above plinth level where ever required as per departmental type design & drawing including supply of all labour material T&P etc complete.
Supply of all materials, labour and T & P etc. and construction of R.C.C. Sump / Clear Water Reservoir of following Capacity in K.L. as per design and drawing including fixing of pipes and fittings including cartage of materials etc. complete
Clear Water Sump 50 KL Capacity at MPS
Clear Water Sump 15.0 KL Capacity at IPS I
Clear Water Sump 70 KL Capacity at TOP CWR
RCC CWR 2.0 KL
RCC CWR 3.0 KL
RCC CWR 10.0 KL
RCC CWR 12.50 KL
RCC CWR 22.50 KL
RCC CWR 30.00 KL
Supply & Fixing of 25 litre capacity M.S Bucket Type Chlorinator of standard size with glass wooling including supply of all labour material T&P etc complete.
Design, Supply of all materials, labour, T&P. etc to construct a water treatment plant (WTP) to treat 0.40MLD water (Source at Thawada River Near Thawada) based on rapid gravity filtration. The design of filter plant has to be done on the based on CPHEEO manual for Water Supply and Treatment. The filter plant should consists of inlet chamber, flow measuring device, presettling tanks (2 units), mixing units, flocculation unit, secondary settling tank (2 units), rapid gravity filter (minimum 2 filter beds), clear water chamber including all piping, valves, RCC back wash tank, double storey building (minimum 30 sqm) one floor will be used for office and other floor will be used for chemical room). Each floor height should be minimum 3.30 m. The work also include 60 cm apron and 15 cm semicircular PC drain all around all units and including overall drainage of water treatment campus upto outside 5 m of campus boundary. The work should also include internal electrification of all units as well as external electrification as per requirement of site. The work also include 1 m inter connecting RCC/CC path ways to all units as per site requirement. The work also include necessary excavation as per requirement and development of water treatment plant and disposal of surplus earth from site of work to suitable available place but excluding the cost of protection works, boundary wall and gates, which will be executed separately as per approved layout and design of treatment plant. The contractor is advised to inspect the site of work. No excuse and request to change the site, rates and demand of extra rates will be entertained at later stage. he rates shall be including of running and maintenance for one year including training of Peyjal Nigam staff during running and maintenance period of treatment works including all performance test of clarifier, settler, filters and quality of filtered water as per water supply manual.
RAW WATER
Supply of vertical Turbine pump 440 lpm discharge 65 Mtr. head suitable to run in raw water, 1450 rpm with 15.00 mtr column assembly and other accessories in all respect.
Vertical hollow shaft electric motor 3 phase 415 volt, 2900 rpm, 20 HP (15 kw)
M.S Channel
Supply of MS sheet fabricated, dust & vermin proof cubical floor mounting type control panel made out from 14 SWG MS sheet, copper bus bars, having 1 no. incoming and 2 nos. outgoing comprising of following items:
Incoming:
100 Amps 3 pole MCCB - 01 No.
Fabrication charges of 01 no. incomeing Panel for MCCB 125 Amp.
Outgoings :
63 Amps 3 pole MCCB -01 No.
Fabrication charges of 02 no. Outgoing Panel for MCCB 100 Amp.
32 Amps 3 Pole MCCB for light & fan- 01 No. for both the out goings.
Cost of Miscellaneous items such as relays etc. for complete panel comprising of folloing
Incoming:
Phase indicating lamps complete with instrument fuses & toggle switch
Danger plate -
ON/OFF indicators -
Digital type energy meter
Outgoings :
LT Power capacitor of 5.0 KVAR -
Single Phase Preventer -
Digital type Hour Counter meter -
Indicating Lamps -
Complete Internal wiring of control panel by adequate size copper bus bars/copper cable, lugs etc complete.
Fully automatic ATS type starter suitable for above motors having air break contactors, electronic timer, thermal over load relay, adequate size copper bus bars, and duly wired by copper leads/ wire, lugs, ON/OFF and reset switches and indicators etc. complete in all respects.
Supply of power wiring material such as 10 sq.mm. 3½ Core armouned. Aluminium conductor XLPE insulated cable.
Supply of power wiring material such as 25 sq.mm. 3.5 Core aluminium conductor armouned XLPE insulated cable.
Jointing material for wiring connection including lugs, thimble, insulation tapes, nutt bolts etc.
Double loop earting of all electrical equipments with supply of material such as G.I. earth strip, earth plate, G.I. funnel, charcoal, Salt, watering pipe etc. including digging of pits and refilling complete. -1 Job
Supply of main piping & valves comprising of the followings :-
80 mm dia C I D/F sluice valve PN-1.6
80 mm dia CI D/F reflux valve PN-1.6
Following MS DF pipes, reducers, tapers, bends, tee and other specials required as per site conditions including necessary nos. of nuts & bolts and high pressure packing.
M.S. DF. 90º bend 80 mm dia - 2 Nos.
MS DF pipe 80 mm dia 1.00 Mtr. long - 2 Nos.
MS DF pipe 80 mm dia 1.50 Mtr. long-2 Nos.
M.S.A.F. 80x80x80 mm dia Plain Tee-1 Nos.
80 mm dia MS Flange 12mm thick-12 Nos.
80 mm dia 4.54 mm thick-MS Plain pipe 3.00 mtr
80 mm X Pump outlet Size reducer 2 Nos
MS Blind flange for 80 mm dia -1 No.
Supply of a set of pressure gauges (0-20) Kg/Cm2 complete with control cocks and nipples including all necessary fittings etc.
Spares for Pump
Spares for Motor
Spares for Starter
Supply of chain pulley block with traveller 1 Ton capacity with 5 mtr. lift chain for Intake well.
Tools -
D.E. spanner set -
Ring spanner set
Screw driver set
Tool box-
Pipe wrench 18" /14"
150mm size Column pipe clamps
Hammer with handle 2 kg.
Chain wrench sutaible for 150mm dia pipe
Bearing puller-
Crimping Tool
M.S. Clamps
Rubber Insulation sheet 2.0m x 1.0 m x 25mm thick.
Installation commissioning & testing of pumping plant and setting to work of entire equipment including pumps, motors, control panel and power wiring etc complete.
Painting
Testing
At works
At Site
MAIN PUMPING STATION
Supply of electric driven multi-stage horizontal clear water centrifugal pumps with bronze impellers, stainless steel shaft capable to deliver clear water 400 LPM discharge at 480 Mt. head, 2900 r.p.m.
Supply of M.S. fabricated base plate and coupling for above pumps & motors.
Supply of horizontal shaft TEFC electric motors suitable to run on 415 + 10% volts, 3 phase, 50 Hz. A.C. supply and of 100 H.P.(75 KW), 2900 r.p.m.
Supply of MS sheet fabricated, dust & vermin proof cubical floor mounting type control panel made out from 14 SWG MS sheet, copper bus bars, having 1 no. incoming and 2 nos. outgoing comprising of following items:
Incoming:
250 Amps 3 pole MCCB - 01 No.
Fabrication charges of 01 no. incoming Panel for MCCB 250 Amp.
Outgoings :
160 Amps 3pole MCCB
Fabrication charges of 02 no. Outgoing Panel for MCCB 160 Amp.
32 Amps 3 Pole MCCB for light & fan- for both the out goings.
Cost of Miscellaneous items such as relays etc. for complete panel comprising of following.
Incoming:
144 mm sq. dial Digital type frequency meter
Phase indicating lamps complete with instrument fuses & toggle switch
Danger plate -
ON/OFF indicators -
Digital type energy meter
Outgoings :
LT Power capacitor of 18.0 KVAR
Single Phase Preventer
Digital type Hour Counter meter
Indicating Lamps
Complete Internal wiring of control panel by adequate size copper bus bars/copper cable, lugs etc complete.
Supply of fully automatic auto transformer type starter suitable for above motors having airbreak contactors, electronic timer, thermal over load relay, adequate size Aluminum bus bars, copper wound auto transformer and duly wired by copper leads/ wire, lugs, ON/OFF and reset switches and indicators etc. complete in all respects.100 HP
Supply of power wiring material such as 120 sq.mm. 3½ Core Aluminum conductor cable XLPE insulated cable for power wiring between the control panel and starter to motor. (For Two Runs)
Supply of power wiring material such as 150 sq.mm.3½ Core aluminum conductor cable XLPE insulated, cable for power wiring between Power transformer and control panel.
Jointing material for wiring connection including lugs, thimble, insulation tapes, nutt bolts etc.
Double loop earting of all electrical equipments with supply of material such as G.I. earth strip, earth plate, G.I. funnel, charcoal, Salt, watering pipe etc. including digging of pits and refilling complete. -1 Job
Supply of main piping & valves comprising of the followings :-80 mm
80 mm dia CI D/F sluice valve PN-1.0 -
80 mm dia CS D/F sluice valve class 600 ASA.
80 mm dia CS D/f reflux valve class 600 ASA.
Following MS DF pipes, reducers, tapers, bends, tees and other specials required as per site conditions including necessary nos. of nuts & bolts and high pressure packing.
MS Plain pipe 80 mm dia 4.54 mm thick -
MS Plain pipe 80 mm dia 7.1 mm thick
MS DF reducer 80 mm xpump outlet size-
MS DF 90º bend 80 mm dia
MS AF 80x 80x80 mm dia Tee-
MS Radial Tee 80x80x80 mm dia-
MS DF reducer 80 mm x pump inlet size-
MS flange 80 mm dia 25mm thick
MS flange 80 mm dia 12mm thick
MS DF 90º bend 80mm dia
MS Blind flange for 80 mm dia for delivery line
Supply of a set of pressure gauges (0-100) Kg/Cm2complete with control cocks and nipples including all necessary fittings etc.
Spares for Centrifugal pump 400 LPM, 480 Mtr. head.
Spares for induction Motor 100 HP.
Spares for starter. (Main auxilliary contactors etc.)
Supply of lifting tackle with H.O.T gantry crane 2 Ton 8 m span capacity with 4.5 mtr. lift chain complete.
Tools -
Grease Gun-
D.E. spanner set (8 Pcs)-
Ring spanner-
Screw driver
Insulated plier
Adjustable wrench 150/200mm size-
Tool box
Bearing puller-
Suitable Crimping tool-
Pipe wrench 18"
Rubber Insulation sheet 2.01m x1.0m x 25mm thick.
Installation and setting to work of entire equipment including pumps, motors, control panel , starter and power wiring etc.
Commissioning of pumping plant at site.
Testing of pumps.
At works.
At Site.
Painting
INTERMEDIATE PUMPING STATION
Supply of electric driven multi-stage horizontal clear water centrifugal pumps with bronze impellers, stainless steel shaft capable to deliver clear water 400 LPM discharge at 450 Mt. head, 2900 r.p.m.
Supply of M.S. fabricated base plate and coupling for above pumps & motors.
Supply of horizontal shaft TEFC electric motors suitable to run on 415 + 10% volts, 3 phase, 50 Hz. A.C. supply and of 100 H.P. (75 KW), 2900 r.p.m.
Supply of MS sheet fabricated, dust & vermin proof cubical floor mounting type control panel made out from 14 SWG MS sheet, copper bus bars, having 1 no. incoming and 2 nos. outgoing comprising of following items:
Incoming:
250 Amps 3 pole MCCB - 01 No.
Fabrication charges of 01 no. incoming Panel for MCCB 250 Amp.
Outgoings :
160 Amps 3 pole MCCB -01 No.
Fabrication charges of 01 no. Outgoing Panel for MCCB 160 Amp.
32 Amps 4 Pole MCCB for light & fan- 01 No. for both the out goings.
Cost of Miscellaneous items such as relays etc. for complete panel comprising of following.
Incoming:
144 mm sq. dial Digital type frequency meter-
Phase indicating lamps complete with instrument fuses & toggle switch
Danger plate
ON/OFF indicators
Digital type energy meter
Outgoings :
LT Power capacitor of 18.0 KVAR
Single Phase Preventer
Digital type Hour Counter meter
Indicating Lamps
Complete Internal wiring of control panel by adequate size copper bus bars/copper cable, lugs etc complete.
Supply of fully automatic auto transformer type starter suitable for above motors having airbreak contactors, electronic timer, thermal over load relay, adequate size Aluminum bus bars, copper wound auto transformer and duly wired by copper leads/ wire, lugs, ON/OFF and reset switches and indicators etc. complete in all respects.100 HP
Supply of power wiring material such as 120 sq.mm. 3½ Core Aluminum conductor cable XLPE insulated cable for power wiring between the control panel and starter to motor.
Supply of power wiring material such as 150 sq.mm. 3½ Core aluminum conductor cable XLPE insulated, cable lugs, cable for power wiring in between Power transformer and control panel.
Jointing material for wiring connection including lugs, thimble, insulation tapes, nutt bolts etc.
Double loop earting of all electrical equipments with supply of material such as G.I. earth strip, earth plate, G.I. funnel, charcoal, Salt, watering pipe etc. including digging of pits and refilling complete.
Supply of main piping & valves comprising of the followings :-
80 mm dia CI D/F sluice valve PN-1.0
80 mm dia CSDF sluice valve class 600 ASA
80 mm dia CS D/F reflux valve class 600 ASA
Following MS DF pipes, reducers, tapers, bends, tees and other specials required as per site conditions including necessary nos. of nuts & bolts and high pressure packing.
MS Plain pipe 80 mm dia 4.54 mm thick
MS Plain pipe 80 mm dia 7.1 mm thick
MS DF reducer 80 mm xpump outlet size
MS DF 90º bend 80 mm dia-
MS AF 80x 80x80 mm dia Tee-
MS Radial Tee 80x80x80 mm dia-
MS DF reducer 80mm pump inlet size-
MS flange 80 mm dia 20mm thick-
MS flange 80 mm dia 12mm thick -
MS DF 90º bend 80 mm dia-
MS Blind flange for 80 mm dia for delivery line
Supply of a set of pressure gauges (0-100) Kg/Cm2 complete with control cocks and nipples including all necessary fittings etc.
Spares for Centrifugal pump 400 LPM, 450 Mtr. head.
Spares for induction Motor 100 HP.
Spares for starter. (Main auxilliary contactors etc.)
Supply of lifting tackle with H.O.T gantry crane 2 Ton 8 m span capacity with 4.5 mtr. lift chain complete.
Tools -
Grease Gun
D.E. spanner set (8 Pcs)
Ring spanner-
Screw driver
Insulated plier
Adjustable wrench 150/200mm size
Tool box-
Bearing puller
Suitable Crimping tool
Pipe wrench 18"
Rubber Insulation sheet 2.01m x1.0m x 25mm thick.
Installation and setting to work of entire equipment including pumps, motors, control panel , starter and power wiring etc.
Commissioning of pumping plant at site.
Testing of pumps.
At works.
At Site.
Painting
DISTRIBUTION TRANSFORMER AND HT PANEL.
Distribution transformer copper wound, 11 KV/ 0.433 KV with first filling of transformer oil, and complete accessories Outdoor type.
M.P.S 160 KVA
I.P.S - Ist 160 KVA
Internal electrification of pump houses and campus at different pumping stations including campus street light.
Intake well
M.P.S, IPS
Cost of S.I.TC of H.T Panel with VCB 01 No & 2 nos Load break switches.
Cost of earthing of H.T Panel
Cost of earthing for transformers with G.I earth plate 600mm x 600 mm x 6 mm including accessores and providing masonary enclosures with providing and fixing 25 mm x 5 mm G.I stri on surface for connection with charcoal, salt as required. ( 01 no. earthing)
Supply, fixing and testing of HT cable Jointing kit outdoor type
Cost of installation and testing of transformers.
Cost of fenching of transformer
AUTOMATION WORKS
INTAKE WELL
GSM based remote terminal units with Analog and Digital Parameter and features as specified to store and transmit data on GSM backbone to LMS (RTU’s shall be integrated with the starter panel).
GSM based wireless communication hardware for RTU’s.
Intelligent Energy meters suitable for automation.
Valve Actuator for 80 mm dia valve.
Actuator Panel
Hard wired timer circuit for actuator
Auto phase reversal unit for Raw water, Intake well. 0-40 H.P.
Pressure Transmitter
Isolation Transformer (440 V step down 220 V for protection of site automation)
Electromagnetic Flow meter for line sizes of Automata/E&H/NIVO/eq. Make of 80 mm NB size with local electronics (display and set point facility) and 4-20 m A) retransmission output to SCADA. (for Intake well)
Single cabling between RTU and field instruments, 2 Core x 1.5 sqmm PVC coated flexible screened cable.
4 C x 1.5 sq mm PVC coated flexible unscreened Cu cable.
10C x 1.5 sq mm PVC coated flexible unsreened Cu cable.
Conduit pipe 1” PVC
Conduit pipe 1.5” PVC
Accessories like conduit pipe flexible pipes, PVC bend, AC & DC relays with base, lugs etc.
Erection commissioning of all instruments and customization of software.
FOR MPS, IPS
GSM based remote terminal units with Analog and Digital Parameter and features as specified to store and transmit data on GSM backbone to LMS (RTU’s shall be integrated with the starter panel).
GSM based wireless communication hardware for RTU’s.
Intelligent Energy meters suitable for automation.
Valve Actuator for 80 mm dia valve.
Actuator Panel
Hard wired timer circuit for actuator
Auto phase reversal unit for MPS & IPS 40-100 H.P.
Pressure Transmitter
Isolation Transformer (440 V step down 220 V for protection of site automation)
Electromagnetic Flow meter for line sizes of Automata/E&H/NIVO/eq. Make of 80 mm NB size with local electronics (display and set point facility) and 4-20 m A) retransmission output to SCADA. (for I.P.S)
Single cabling between RTU and field instruments, 2 Core x 1.5 sqmm PVC coated flexible screened cable.
4 C x 1.5 sq mm PVC coated flexible unscreened Cu cable.
10C x 1.5 sq mm PVC coated flexible unsreened Cu cable.
Conduit pipe 1” PVC
Conduit pipe 1.5” PVC
Accessories like conduit pipe flexible pipes, PVC bend, AC & DC relays with base, lugs etc.
Erection commissioning of all instruments and customization of software.
OPERATION & MAINTENANCE
OPERATION & MAINTENANCE - (For Intake well, MPS, IPS.) - One Job For Each stage
After testing & commissioning of scheme running & maintenance of scheme by running pumping plant for 16 hrs per day (for a period of 6 months or complete Distribution line testing of civil works which over later ) including supply of skilled O&M staff, account maintenance including supply of all materials, labour, T&P etc. complete but excluding electricity charges for pumping of water.
Intake well MPS,IPS
unipro techno infrastructure pvt ltd
M/s Govind Singh Bisht
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .