| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC KOVIL VILAKATHU VEEDU KONCHIRAVILA MANACAUD P O | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 Cr+₹2.8 L (1.81%)Rejected-AOC | ₹1.6 Cr+₹2.8 L (1.81%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.6 Cr+₹5.0 L (3.29%)Rejected-Finance | ₹1.6 Cr+₹5.0 L (3.29%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.6 Cr+₹5.9 L (3.89%)Rejected-Finance | ₹1.6 Cr+₹5.9 L (3.89%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.6 Cr+₹6.8 L (4.49%)Rejected-Finance | ₹1.6 Cr+₹6.8 L (4.49%) | L5 | Rejected-Finance L5 |
Tender Value
₹1.8 Cr
EMD Value
₹50,000
Closing Date
10 Oct 2023, 5:00 pmClosed
The Superintending Engineer
O/o Office of The Superintending Engineer Buildings South Circle Thiruvananthapuram
GENERAL-APJ Abdul Kalam Technological University - Construction of a Compound wall for the proposed site of University at Vilappilsala - Phase 1 -General Civil WorkGeneral Civil Work
2023_PWD_605515_1
PWD/BLDG/TR/7286/2022_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,508
Yes
₹50,000
Yes
12 Dec 2023
25 Sept 2023
13 Oct 2023
25 Sept 2023
10 Oct 2023
25 Sept 2023
Amount
Appendix A
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
OD93471/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payableor recoverable separately. All work upto plinth level
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
50.6.1.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
OD82567/2023-2024:Supplying and fixing Cast iron ornamental grill works above the compound wall of 45cm x25cm including all cost of materials and labour charges etc complete
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
SREEKUMAR K S
ANIL KUMAR P
ARUN V G
SAJEEV MATHAI
olga constructions
Heather Infrastructure Private Limited
Bidder Name
SREEKUMAR K S
ANIL KUMAR P
olga constructions
Heather Infrastructure Private Limited
SAJEEV MATHAI
S KRISHNA KUMAR
ARUN V G
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .