Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.1 LAccepted-AOC D NO 5 13 24 1 BEHIND SAHUWALA CYLINDERS IDA AUTONAGAR VISAKHAPATNAM 530 012 | VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530012 | ₹50.1 L | L1 | Accepted-AOC Lowest Bid Accepted |
| 2 | L2₹61.6 L+₹11.6 L (23.1%)Rejected-Finance 205 2ND FLOOR VARDHMAN CHAMBER LL 0 VIKASPURI WEST DELHI DELHI 110018 | WEST DELHI | DELHI | 110018 | ₹61.6 L+₹11.6 L (23.1%) | L2 | Rejected-Finance Not Being Lowest Bidder |
| 3 | L3₹66.1 L+₹16.0 L (32.0%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | ₹66.1 L+₹16.0 L (32.0%) | L3 | Rejected-Finance Not Being Lowest Bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Being MOU from MES approved OEM not furnished |
| Sl No | Description | Qty | Unit | Escon Elevators Pvt Ltd L3 | INDUSTRIAL ENGINEERING SYSTEMS L1 | Evaan Elevators Pvt. Ltd L2 |
|---|---|---|---|---|---|---|
| .10Phase-I: Schedule "A" Part - I [Special repairs and Replacement of old unserviceable LiftS ]: | ||||||
| 1.00 | Design supplying, installing, testing & commissioning of electrically operated gearless 13 Passenger (884 Kg) capacity lifts to serve 15 floors i.e. G + 14 upper floors in the existing lift well, confirming to all relevant IS, speed 1.5 metre/sec with automatic micro stroke button control, microprocessor based controller, simplex selective/ collective control suitable for 3 phase, 415 volts, 50 Hz, AC supply, independent operation with AC Variable Voltage Variable Frequency [AC VVVF] drive control [closed loop] with power saving regenerative drive with suitable gearless motor traction type to serve G+14 floors i.e. 15 stops with and without attendant, suitable for synchronised operation, automatic power operated 900mm centre opening sliding type stainless steel (SS 304) doors 16 gauge haireline finish with vision panel of size 200x800mm covered with 8mm thick toughened plain glass, having full curtain infrared sensor safety (3D infra red sensors for car doors along the full height), UPS based Automatic Rescue Device [ARD] system with [±] 5mm and suitable batteries, Floor position digital indicators in car and all landings with call indicating lights, built in voice announcing system including necessary joists and beams for mounting the machine in machine room including addition/ alteration to existing lift well if any, all necessary civil works required in connection with erection of lift complete all as specified and as directed including dismantling of existing Lifts complete alongwith its accessories of any description and transporting and depositing in MES stores and provision of temporary wooden door shutter at landing door opening for safety of the users till installation of new lift complete all as specified and as directed. | 2 | EACH JOB | 27,00,000 ₹54,00,000 | 22,50,000 ₹45,00,000 Lowest | 27,90,000 ₹55,80,000 |
| 1.10Notes: The lift shall be provided with and including the following: [a] Fireman Switch [b] UPS based Automatic Rescue Device [ARD] during power failure including manual operation provision with suitable capacity of batteries designed for running the lift with full load. The ARD batteries shall be securely housed in a suitable battery box fabricated from 1.5mm thick MS sheet duly powder coated for corrosion resistance, with an insulating mat provided inside to ensure electrical safety and prevent direct contact between the batteries and the metal surface including provision of suitable locking arrangement [c] Battery operated emergency light [LED Ceiling Fitting] alarm [speaker for emergency alarm system to be fixed] and stop button in car with rechargeable arrangement for battery. [d] LED light fitting 5 Watts x 6 Nos. recessed mounted in false ceiling. [e] Provision of two axial flow fans suitable for recessed mounting in false ceiling. [f] Provision of premium quality Jet Black Granite stone slab of 18-20 mm thick as in flooring for lift car (not more than three parts) over 3mm thick aluminium chequered plate in flooring for lift car. [g] Nonstop button/ independent operation. [h] Over load warning indicator in COP with voice announciation and overload protection/ tripping system having relays , etc. [i] Stainless steel door frame and sliding doors with front opening for all landings made of 16 gauge 304 grade stainless steel sheet with haireline finish with vision panel of size 200x800mm covered with 8mm thick toughened plain glass. [j] Landing door frames shall be made of 1.5mm thick 304 grade stainless steel sheet. | ||||||
| 1.20[k] All the dimensions of the lift and connected items shall be designed in conformity with IS 14665 standards and the contractor shall submit the design drawing to Accepting Officer for approval before commencementof work. The body shall be SS 304 grade stainless steel of 16 gauge with hairline finish. [l] Provision of built-in voice announciating system for floor announciation, direction of lift movement i.e. moving up and moving down, doors opening and doors closing announciation with background music complete all as specified, directed and approved by Engineer-in-charge/GE. [m] Provision of voice announciating system for ARD operation during power failure complete all as specified, directed and as approved by Engineer-in-charge/GE. [n] Set of three in number limit switches at the bottom and top most position of lift hoist way as specified in IS. [o] A safety instruction plate, duly embossed or laser printed on an SS-304 grade stainless steel sheet of suitable size and thickness, shall be riveted inside the lift car at a clearly visible location, displaying the content in English, Hindi and Telugu with letters of sufficient size to be easily readable by the users as directed by the Engineer-in-Charge. [p] Provision of Car Operating Panel [COP] with a dot matrix type display to indicate various information such as floor level, directional arrow, overload, ARD functioning and other relevant signals alongwith push buttons incorporating Braille / raised letters in sharp contrast to the background, to aid persons with visual impairments in compliance with Clause B-6.4.5(c) of NBC of India 2016. [q] Provision of suitable phase reversal relays to the controller to protect lift/ equipment against phase reversal, phase failure and low voltage. [r] Provision of 3 way Intercom system with hand set at Ground floor and machine room and built in push to talk(PTT) in COP without hand set. [s] Provision of hand rail made out of 38mm dia 304 grade stainless steel pipe with closed and smooth finished complete all as specified and as directed by Engineer-in-charge. [t] -Blank- | ||||||
| 1.30[u] Steel Wire rope of adequate size as per relevant IS and as per manufacturers specification. [v] Other standard fixtures and fittings like guide rails, sheaves, counter weights with guards, buffers, gear unit brakes, control panel, car operational panel, governor, locks, power control and trailing cables complete all as per latest IS specifications. [w] Main drives and controls shall be high efficient and low power consumption. [x] Lift design, specifications, drawings, manufacturers instructions shall be got approved from Accepting Officer before placing order for procurement. [y] The contractor shall carry third party load testing for each lift installed once in every six months till defect liability period and shall submit satisfactory test results and the rate quoted shall be deemed to included for this provision. [z] Shaft lighting shall be provided in the lift shaft with provision of LED Bulk head light 10W at each floor level with FRLS copper conductor wires drawn through PVC conduit. The wiring for shaft lighting shall be connected and controlled from machine room lighting and it shall be independent from lift supply. [aa] Provision of CCTV Camera, 3MP, 2K, made in India with 256GB Micro SD memory card housed in a stainless steel safety grill with small padlock complete fixed in lift car. A separate UPS with battery, suitable to provide a minimum of 15 minutes backup for the CCTV system, shall be installed in the machine room and the power supply to the CCTV shall be connected from the UPS through an independent cable drawn along with the trailing cable. | ||||||
| 1.40[ab] Automated Breakdown Notification System: The lift shall be equipped with an intelligent controller capable of detecting and diagnosing faults or malfunctions in real time. In the event of any lift breakdown or critical fault, the controller shall automatically trigger on SMS. Upon rectification of the fault and restoration of functionality, the system shall automatically trigger a follow-up SMS indicating that the lift is operational. [ac] SMS Alert Configuration: The system shall be configured to send SMS messages to the designated personnel, including but not limited to the following:- [i] Lift Technician [ii] Engineer-in-Charge [ad] Content of SMS Alert: Each SMS alert shall clearly mention the following:- [i] Building Number / Name where the lift is installed [ii] Time and date of fault occurance [iii] Primary cause of breakdown, such as Voltage fluctuation, No power supply, Overload / Overweight, Emergency stop triggered and any other specific error detected by the system. [ae] Responsibility of Vendor / OEM: [i] The contractor/vendor shall ensure complete configuration and testing of the SMS alert system at the time of commissioning. [ii] Any necessary SIM card, GSM mobile, or associated hardware / software required for this functionolity shall be supplied and installed by the vendor. Tariff of SIM, GSM mobile, etc shall be borne by the contractor till completion of defects liability period. [iii] The vendor shall provide documentation and training for the configuration and update of alert recipient numbers. [af] Compliance & Acceptance: This feature shall form an essential part of the technical compliance. Absence or non-functionolity of the SMS based alert system shall be treated as a deviation from the technical specifications and may attract penalities or non-acceptance during commissioning. | ||||||
| 1.50[ag] Directional signs indicating the location of an accessible lift to transport persons with disabilities at all usable levels shall be provided at a location that is clearly visible from the accessible building entrance. The directional signs shall incorporate a representation of the international symbol of accessibility in compliance with Clause B-6.4.1 of NBC of India 2016. [ah] Provision of Landing Operating Panel [LOP] at floors with a dot matrix type display to indicate both the floor level and directional arrow, along with push buttons incorporating Braille/raised letters in sharp contract to the background, to aid persons with visual impairment in complaince with Clause B-6.4.5(b) of NBC of India 2016. [aj] Solid cast iron blocks only shall be used for Counterweight. No other castings shall be permitted. [ak] The mild steel machined guide rails shall only be permitted. the minimum thickness of guide rails shall be 16mm for the car and 10mm for the counterweight. [al] Providing and fixing landing toe guards from the bottom of the sill support upto the next floor door header level to cover the exposed wall surfaces with 1.2mm thick GI sheet, complete with all necessary fixing accessories, fasteners and supports to the wall surface as specified and directed by the Engineer-in-Charge. | ||||||
| 1.60Notes for Ser item Nos. 1 to 1.5: The pre-dispatch factory inspection of the complete materials shall be carried out at the manufacturer's premises by a representataive nominated by the Accepting Officer. A report shall be prepared and submitted duly signed by the representative of manufacturer, the contractor and the representative of the Accepting Officer, and shall be approved by the Accepting Officer before dispatching the material from the manufacturer's factory. The contractor in liason with the manufacturer, shall make all necessary arrangments for the inspection and intimate the department at least 15 days prior to the date of inspection. | ||||||
| 2.00 | Earthing complete with Galvanized steel earth plate electrode of size 600x600x6mm thick buried directly in ground with earth pit not less than 2.25m deep below the normal ground level with top edge of plate not less than 1.5m below normal GL connected with galvanised earth strip of size 32x6mm as earth lead by means of bolts, nuts, check nuts and washers of Galvanized iron or steel all as shown in electrical plate No. 3 of SSR Part-I connected to earthing test point all as specified or indicated including testing on completion and dismantling old earthing complete all as specified and as directed by the Engineer-in-Charge.
[Notes: The unit rate shall be deemed to include for excavation & earth work in any type of soil, PCC (1:3:6) type C1 chamber, MS angle iron frame 40x40x6mm, RCC 1:2:4 type B-1 cover 40mm thick with 8mm dia steel reinforcement bars at 150mm c/c both ways, MS handle 12mm dia, CI funnel and wire mesh, GI watering pipe 20mm dia medium grade for watering, GI protection pipe light grade 40mm dia, earthing lead upto 7.5m including providing charcoal or coke and common salt in alternate layers of 15cm compacted thickness all around the electrode complete all as specified in preambles of SSR Part-II and as shown in plate No. 3 of SSR Part-I.] | 4 | EACH JOB | 14,000 ₹56,000 | 12,000 ₹48,000 | 8,500 ₹34,000 Lowest |
| 3.00 | S & F in repairs Earth continuity conductor or main earthing lead made of GI Strip of size 32 X 6mm, fixed to wall on batten or recess or chases or burried in ground or fixed to poles or any other indicated situation including drawing through GI Pipe for earthing etc. complete all as specified and as directed. | 250 | RM | 350 ₹87,500 | 145 ₹36,250 Lowest | 220 ₹55,000 |
Tender Value
₹96 L
EMD Value
₹1.7 L
Closing Date
9 Jan 2026, 6:00 pmClosed
Col Shinde SS
Commander Works Engineers, Station Road, Visakhapatnam - 530 004
SPECIAL REPAIRS FOR REPLACEMENT OF OLD UNSERVICEABLE BER LIFTS AT GANGA P 144 AND JAMUNA P 147 BUILDINGS AT NAUSENABAUGH UNDER GE U I VISAKHAPATNAM
2025_MES_744143_1
82636/E8
Open Tender
Civil Works
Item Rate
180 days
Visakhapatnam
As per NIT
9 documents required · 9 mandatory
₹1,000
GE UTILITY I
₹1.7 L
Yes
16 Apr 2026
11 Dec 2025
12 Jan 2026
11 Dec 2025
9 Jan 2026
2 Jan 2026
11 Dec 2025 - 18 Dec 2025
[k] All the dimensions of the lift and connected items shall be designed in conformity with IS 14665 standards and the contractor shall submit the design drawing to Accepting Officer for approval before commencementof work. The body shall be SS 304 grade stainless steel of 16 gauge with hairline finish. [l] Provision of built-in voice announciating system for floor announciation, direction of lift movement i.e. moving up and moving down, doors opening and doors closing announciation with background music complete all as specified, directed and approved by Engineer-in-charge/GE. [m] Provision of voice announciating system for ARD operation during power failure complete all as specified, directed and as approved by Engineer-in-charge/GE. [n] Set of three in number limit switches at the bottom and top most position of lift hoist way as specified in IS. [o] A safety instruction plate, duly embossed or laser printed on an SS-304 grade stainless steel sheet of suitable size and thickness, shall be riveted inside the lift car at a clearly visible location, displaying the content in English, Hindi and Telugu with letters of sufficient size to be easily readable by the users as directed by the Engineer-in-Charge. [p] Provision of Car Operating Panel [COP] with a dot matrix type display to indicate various information such as floor level, directional arrow, overload, ARD functioning and other relevant signals alongwith push buttons incorporating Braille / raised letters in sharp contrast to the background, to aid persons with visual impairments in compliance with Clause B-6.4.5(c) of NBC of India 2016. [q] Provision of suitable phase reversal relays to the controller to protect lift/ equipment against phase reversal, phase failure and low voltage. [r] Provision of 3 way Intercom system with hand set at Ground floor and machine room and built in push to talk(PTT) in COP without hand set. [s] Provision of hand rail made out of 38mm dia 304 grade stainless steel pipe with closed and smooth finished complete all as specified and as directed by Engineer-in-charge. [t] Continuous earthing for machine and equipment with Aluminium strip of size 25x3mm from machine unit and controller panel up to the earth test point provided at the bottom of the bldg. New earth pits-02 Nos shall be provided with 600mmx600mmx6mm GI earth plate electrode and 32x6mm earth strip from earth electrode to test point shall be provided.
[u] Steel Wire rope of adequate size as per relevant IS and as per manufacturers specification. [v] Other standard fixtures and fittings like guide rails, sheaves, counter weights with guards, buffers, gear unit brakes, control panel, car operational panel, governor, locks, power control and trailing cables complete all as per latest IS specifications. [w] Main drives and controls shall be high efficient and low power consumption. [x] Lift design, specifications, drawings, manufacturers instructions shall be got approved from Accepting Officer before placing order for procurement. [y] The contractor shall carry third party load testing for each lift installed once in every six months till defect liability period and shall submit staisfactory test results and the rate quoted shall be deemed to included for this provision. [z] Shaft lighting shall be provided in the lift shaft with provision of LED Bulk head light 10W at each floor level with FRLS copper conductor wires drawn through PVC conduit. The wiring for shaft lighting shall be connected and controlled from machine room lighting and it shall be independent from lift supply. [aa] Provision of CCTV Camera, 3MP, 2K, made in India with 256GB Micro SD memory card housed in a stainless steel safety grill with small padlock complete fixed in lift car. A separate UPS with battery, suitable to provide a minimum of 15 minutes backup for the CCTV system, shall be installed in the machine room and the power supply to the CCTV shall be connected from the UPS through an independent cable drawn along with the trailing cable.
[ab] Automated Breakdown Notification System: The lift shall be equipped with an intelligent controller capable of detecting and diagnosing faults or malfunctions in real time. In the event of any lift breakdown or critical fault, the controller shall automatically trigger on SMS. Upon rectification of the fault and restoration of functionality, the system shall automatically trigger a follow-up SMS indicating that the lift is operational. [ac] SMS Alert Configuration: The system shall be configured to send SMS messages to the designated personnel, including but not limited to the following:- [i] Lift Technician [ii] Engineer-in-Charge [ad] Content of SMS Alert: Each SMS alert shall clearly mention the following:- [i] Building Number / Name where the lift is installed [ii] Time and date of fault occurance [iii] Primary cause of breakdown, such as Voltage fluctuation, No power supply, OPverload / Overweight, Emergency stop triggered and any other specific error detected by the system. [ae] Responsibility of Vendor / OEM: [i] The contractor/vendor shall ensure complete configuration and testing of the SMS alert system at the time of commissioning. [ii] Any necessary SIM card, GSM mobile, or associated hardware / software required for this functionolity shall be supplied and installed by the vendor. [iii] The vendor shall provide documentation and training for the configuration and update of alert recipient numbers. [af] Compliance & Acceptance: This feature shall form an essential part of the technical compliance. Absence or non-functionolity of the SMS based alert system shall be treated as a deviation from the technical specifications and may attract penalities or non-acceptance during commissioning.
[ag] Directional signs indicating the location of an accessible lift to transport persons with disabilities at all usable levels shall be provided at a location that is clearly visible from the accessible building entrance. The directional signs shall incorporate a representation of the international symbol of accessibility in compliance with Clause B-6.4.1 of NBC of India 2016. [ah] Provision of Landing Operating Panel [LOP] at floors with a dot matrix type display to indicate both the floor level and directional arrow, along with push buttons incorporating Braille/raised letters in sharp contract to the background, to aid persons with visual impairment in complaince with Clause B-6.4.5(b) of NBC of India 2016. [aj] Solid cast iron blocks only shall be used for Counterweight. No other castings shall be permitted. [ak] The mild steel machined guide rails shall only be permitted. the minimum thickness of guide rails shall be 16mm for the car and 10mm for the counterweight. [al] Providing and fixing landing toe guards from the bottom of the sill support upto the next floor door header level to cover the exposed wall surfaces with 1.2mm thick GI sheet, complete with all necessary fixing accessories, fasteners and supports to the wall surface as specified and directed by the Engineer-in-Charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
82636Tenderdoc.pdf
Tender Documents • 1.17 MB
BOQ_833260.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .