| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.5 LAccepted-AOC ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | L1 | Accepted-AOC THE LOWEST BIDDER | |
| 2 | L6₹46.3 L+₹8.4 L (22.1%)Accepted-AOC 38 32 53 PARVATHI NAGAR ROAD NO 2 MARIPPALEM NH 16 VISAKHAPATNAM ANDHRA PRADESH 530018 | VISAKHAPATANAM | ANDHRA PRADESH | 530018 | L6 | Accepted-AOC OTHER THAN THE LOWEST BIDDER | |
| 3 | L2₹38.6 L+₹72,596.69 (1.92%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 4 | L3₹39.9 L+₹2.0 L (5.32%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 5 | L4₹41.7 L+₹3.8 L (10.1%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN THE LOWEST BIDDER |
| Sl No | Description | Qty | Unit | pavan putra enterprises L6 | VEDANT SINGH CONSTRUCTIONS L3 | shiv builder L4 | SRI SAI MANIKANTA ENTERPRISES L1 | G VENKATA RAO L2 | SRI LAKSHMI INFRA L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. | 61 | Cum | 750 ₹45,750 | 1,251 ₹76,311 | 1,103 ₹67,283 | 510 ₹31,110 | 430 ₹26,230 Lowest | 550 ₹33,550 |
| 2.00 | Excavation over areas, n exc 1.5 m deep and getting out Hard/dense soil complete all as specified and directed. | 183 | Cum | 385 ₹70,455 | 351 ₹64,233 | 419 ₹76,677 | 460 ₹84,180 | 250 ₹45,750 Lowest | 350 ₹64,050 |
| 3.00 | M&L 100 mm avg thick (spread thickness) moorum/Red bajari filling as granular sub base & light wearing surfaces, spread, rolled & consolidated to gradient & camber required. | 61 | Per 10 Sqm | 800 ₹48,800 | 751 ₹45,811 | 785 ₹47,885 | 1,990 ₹1,21,390 | 650 ₹39,650 | 600 ₹36,600 Lowest |
| 4.00 | M&L for hard core of gauge n exc 63mm deposited spread and leveled in layers n exc 15cm thick watered and rammed to a true surfaces of broken stone or boulder complete all as specified and directed. | 91.5 | Cum | 2,200 ₹2,01,300 | 2,101 ₹1,92,241.5 | 2,000 ₹1,83,000 | 2,030 ₹1,85,745 | 1,050 ₹96,075 Lowest | 2,800 ₹2,56,200 |
| 5.00 | Rolling and consolidation of formation surfaces in cutting with power roller, exc 8 tonne & not exc 12 tonne capacity complete all as specified and directed. | 6.1 | Per 10 Sqm | 35 ₹213.5 | 22 ₹134.2 Lowest | 50 ₹305 | 5,900 ₹35,990 | 1,200 ₹7,320 | 450 ₹2,745 |
| 6.00 | M&L for 100mm thickness Cement concrete type B- 2, 1:2:4 (40mm graded aggregate) as in sub base of flooring complete all as specified and directed. | 122 | Cum | 575 ₹70,150 | 21 ₹2,562 Lowest | 595 ₹72,590 | 3,950 ₹4,81,900 | 620 ₹75,640 | 4,800 ₹5,85,600 |
| 7.00 | Providing WMM 60 to 40 mm layer of stone metal, water curing, rolling compaction and cleaning (Thickness 100 m. Roller capacity is 8 to 10 tons) Spreading bitumen grade Vg 10. Total Thickness: 4 inch. BM Carpet 35 mm: Providing Stone Metal size 12 mm to 20 mm aggregate with bitumen 3.5% to 4% mixing with metal including compaction and rolling with 8-10-ton roller. Seal Coat 15 mm: Providing 6 mm stone metal & mixing it with 4.5% to 5% bitumen (grade is 60 to 70). Thickness Layer 15 mm. Layer to be leveled, Compacted, Cold Rolling to be done along with dust spreading complete all as specified and directed. | 1,220 | Sqm | 500 ₹6,10,000 Lowest | 991 ₹12,09,020 | 973 ₹11,87,060 | 685 ₹8,35,700 | 1,120 ₹13,66,400 | 850 ₹10,37,000 |
| 8.00 | M&L for top layer of a basketball court typically consists of a decoturf 8 layer acrylic cushion system, ITF class 3 (Medium fast) flooring system. This system includes several layers designed for durability and performance as per manufacturer's instruction:
Primer Coat: This base layer helps the acrylic layers adhere to the concrete or asphalt surface, ensuring stability and long-lasting performance.
Resurfacer coat: The acrylic resurfaces fills in any cracks, holes or other imperfection in the court surface, creating a smooth and uniform base for subsequent layer.
Cushion Layer (3 layers): This layer provides shock absorption and enhances player comfort, reducing fatigue and injury risk.
Texture base coat (Two layers): The final layer provides color and texture, ensuring high durability and excellent grip, making it suitable for various sports.
Non textured top coat with a thickness for ensures a consistent ball bounce, superior traction, and long-lasting playability for basketball courts. | 1,220 | Sqm | 1,835 ₹22,38,700 | 891 ₹10,87,020 Lowest | 942 ₹11,49,240 | 985 ₹12,01,700 | 1,180 ₹14,39,600 | 1,025 ₹12,50,500 |
| 9.00 | S&F and installation of basket ball court poles (02) and black board of size 182.80 cm (wide) & Each 106.60 cm (high) made out of 4.75 mm thick EM5 acrylic surface with fade resistant graphic pad fitted in mild steel powder coated angle iron frame of size 50 x 50 x 6 mm thick and 46 mm dia rim made out 1.6 mm dia solid stainless steel ring with net, including dismantling of old poles complete all as specified and directed. | 2 | Each | 2,55,000 ₹5,10,000 | 2,61,000 ₹5,22,000 | 2,65,950 ₹5,31,900 | 26,999 ₹53,998 | 19,000 ₹38,000 Lowest | 50,000 ₹1,00,000 |
| 10.00 | M&L Basketball court line marking Applying making tape and high quality, weather-resistant court making paint, applying it evenly with a roller or spray machine complete all as specified and directed. | 2 | Each | 8,999 ₹17,998 | 9,001 ₹18,002 | 11,500 ₹23,000 | 12,000 ₹24,000 | 8,500 ₹17,000 Lowest | 20,000 ₹40,000 |
Tender Value
₹43.0 L
EMD Value
₹86,000
Closing Date
17 Jun 2026, 6:00 pmClosed
GE I CG VIZAG
GE (I) (CG) Vizag Military Engineer Services CGWO Building C/o Fleet Mail Office Visakhapatnam 530 014
ADDITION AND ALTERATION OF GALLEY PANTRY AADDITION ALTERATION OF BASKET BALL COURT CGRA COMPLEX CGDHQ6 VISAKHAPATNAM UNDER GE I CG VIZAG
2026_MES_761351_2
GE(I)CG/VIZ/TOKEN/10 OF 2026-27
Open Tender
Civil Works
Works
180 days
Visakhapatnam
As per Tender Documents
8 documents required · 8 mandatory
₹500
GE (I) (CG) Vizag
₹86,000
Yes
4 Aug 2026
3 Jun 2026
19 Jun 2026
3 Jun 2026
17 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. | 61 | Cum | - | - |
| 2 | Excavation over areas, n exc 1.5 m deep and getting out Hard/dense soil complete all as specified and directed. | 183 | Cum | - | - |
| 3 | M&L 100 mm avg thick (spread thickness) moorum/Red bajari filling as granular sub base & light wearing surfaces, spread, rolled & consolidated to gradient & camber required. | 61 | Per 10 Sqm | - | - |
| 4 | M&L for hard core of gauge n exc 63mm deposited spread and leveled in layers n exc 15cm thick watered and rammed to a true surfaces of broken stone or boulder complete all as specified and directed. | 91.5 | Cum | - | - |
| 5 | Rolling and consolidation of formation surfaces in cutting with power roller, exc 8 tonne & not exc 12 tonne capacity complete all as specified and directed. | 6.1 | Per 10 Sqm | - | - |
| 6 | M&L for 100mm thickness Cement concrete type B- 2, 1:2:4 (40mm graded aggregate) as in sub base of flooring complete all as specified and directed. | 122 | Cum | - | - |
| 7 | Providing WMM 60 to 40 mm layer of stone metal, water curing, rolling compaction and cleaning (Thickness 100 m. Roller capacity is 8 to 10 tons) Spreading bitumen grade Vg 10. Total Thickness: 4 inch. BM Carpet 35 mm: Providing Stone Metal size 12 mm to 20 mm aggregate with bitumen 3.5% to 4% mixing with metal including compaction and rolling with 8-10-ton roller. Seal Coat 15 mm: Providing 6 mm stone metal & mixing it with 4.5% to 5% bitumen (grade is 60 to 70). Thickness Layer 15 mm. Layer to be leveled, Compacted, Cold Rolling to be done along with dust spreading complete all as specified and directed. | 1,220 | Sqm | - | - |
| 8 | M&L for top layer of a basketball court typically consists of a decoturf 8 layer acrylic cushion system, ITF class 3 (Medium fast) flooring system. This system includes several layers designed for durability and performance as per manufacturer's instruction:
Primer Coat: This base layer helps the acrylic layers adhere to the concrete or asphalt surface, ensuring stability and long-lasting performance.
Resurfacer coat: The acrylic resurfaces fills in any cracks, holes or other imperfection in the court surface, creating a smooth and uniform base for subsequent layer.
Cushion Layer (3 layers): This layer provides shock absorption and enhances player comfort, reducing fatigue and injury risk.
Texture base coat (Two layers): The final layer provides color and texture, ensuring high durability and excellent grip, making it suitable for various sports.
Non textured top coat with a thickness for ensures a consistent ball bounce, superior traction, and long-lasting playability for basketball courts. | 1,220 | Sqm | - | - |
| 9 | S&F and installation of basket ball court poles (02) and black board of size 182.80 cm (wide) & Each 106.60 cm (high) made out of 4.75 mm thick EM5 acrylic surface with fade resistant graphic pad fitted in mild steel powder coated angle iron frame of size 50 x 50 x 6 mm thick and 46 mm dia rim made out 1.6 mm dia solid stainless steel ring with net, including dismantling of old poles complete all as specified and directed. | 2 | Each | - | - |
| 10 | M&L Basketball court line marking Applying making tape and high quality, weather-resistant court making paint, applying it evenly with a roller or spray machine complete all as specified and directed. | 2 | Each | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_861855.xls
BOQ • 0.38 MB
8479Tender10.pdf
Tender Documents • 1.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .