| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹1.3 L+₹12,407.23 (10.7%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | C T KORAH L1 | SEBASTIAN AP L2 |
|---|---|---|---|---|---|
| 1.00Side Protection | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 4.56 | cum | 350 ₹1,596 Lowest | 392 ₹1,787.52 |
| 1.00 | OD249574/2025-2026:DR PACKING with Dept. stone Under foundation - Dry stone packing under foundation using departmental rubble including labour charges etc. complete as per direction of departmental officers at site. (Adopted from Spec 60.7.2) | 3.42 | cum | 760 ₹2,599.2 Lowest | 869 ₹2,971.98 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 1.14 | cum | 8,300 ₹9,462 Lowest | 9,117 ₹10,393.38 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 76 | sqm | 380 ₹28,880 Lowest | 421 ₹31,996 |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 7.6 | cum | 9,000 ₹68,400 Lowest | 9,878 ₹75,072.8 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.75 | sqm | 900 ₹675 Lowest | 1,047 ₹785.25 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 27 | kilogram | 100 ₹2,700 Lowest | 122 ₹3,294 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.23 | cum | 9,000 ₹2,025 Lowest | 10,860 ₹2,443.5 |
Tender Value
₹1.2 L
EMD Value
₹2,953
Closing Date
26 Feb 2026, 11:00 amClosed
Assistant Engineer
Assistant Engineer, LID EW section, Koovappady
Annual Plan-270/25-26 -Renovation of Ambedkar colony thodu in Ward 4,Koovappady G.P
2026_LSGD_830218_2
10/T5/AE/LIDEW/KVPDY/25-26
Open Tender
Civil Works - Water Works
Item Rate
365 days
Koovappady
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹2,953
11 Jun 2026
18 Feb 2026
2 Mar 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
Side Protection
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD249574/2025-2026:DR PACKING with Dept. stone Under foundation - Dry stone packing under foundation using departmental rubble including labour charges etc. complete as per direction of departmental officers at site. (Adopted from Spec 60.7.2)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1410099.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.88 MB
BOQ_1410099.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .