Tender Value
₹31.5 L
EMD Value
₹62,960
Closing Date
15 Sept 2026, 4:00 pmClosed
Executive Engineer PHE Division Kargil
Executive Engineer PHE Division Kargil
Providing/ laying and fitting of distribution/ main line including construction of soakage pit at water supply scheme Lankore (under Capex Budget).
2026_PWD_19482_2
Short E-tender- 86 of PHE Division Kargil of 2026-27
Open Tender
Pipes and Pipe related activities
Percentage
45 days
Lankore Kargil
Refer to NIT
3 documents required · 3 mandatory
₹315
Payable To Executive Engineer PHE Division Kargil
₹62,960
28 Sept 2026
4 Sept 2026
16 Sept 2026
4 Sept 2026
15 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including Disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed. | |||||
| 1.01 | All kind of soil 60% | 713.01 | Cum | 647.61 | ₹4,61,752.41 |
| 1.02 | Ordanary rock 15% | 178.28 | Cum | 1,026.27 | ₹1,82,963.42 |
| 1.03 | Hard Rock (by Chesling) 25% | 297.13 | Cum | 2,424.2 | ₹7,20,302.55 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 20mm nominal size) nallah. | 19.2 | Cum | 9,250.59 | ₹1,77,611.33 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m. | 592.52 | Cum | 260.08 | ₹1,54,102.6 |
| 4Providing/ Laying and fitting of pipes (PN-16 and PE-100) complete including cost of pipes and required fittings as per the direciton of site Engineer incharge including all carriage complete. | |||||
| 4.01 | HDPE Pipe 110mm dia | 300 | RM | 678.52 | ₹2,03,556 |
| 4.02 | HDPE Pipe 90mm dia | 300 | RM | 507.5 | ₹1,52,250 |
| 4.03 | HDPE Pipe 32mm dia | 300 | RM | 96.87 | ₹29,061 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.31 MB
BOQ_46156.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .