| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.5 LAccepted-Finance | ₹46.5 L | L1 | Accepted-Finance Bid ok. |
| 2 | L2₹46.9 L+₹42,882 (0.92%)Accepted-Finance | ₹46.9 L+₹42,882 (0.92%) | L2 | Accepted-Finance Bid ok. |
| 3 | L3₹46.9 L+₹45,245.50 (0.97%)Accepted-Finance | ₹46.9 L+₹45,245.50 (0.97%) | L3 | Accepted-Finance Bid ok. |
| 4 | L4₹48.3 L+₹1.9 L (4.02%)Accepted-Finance 179 THE MALL AMBALA CANTT 133001 HR | AMBALA | HARYANA | 133001 | ₹48.3 L+₹1.9 L (4.02%) | L4 | Accepted-Finance Bid ok. |
| Sl No | Description | Qty | Unit | M/s B.S.Jain L4 | M/s Mangal Construction Co. L1 | Hi Tech Builder L2 | R N COMPANY L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | Dismantling Brickwork built in C. Mortar all as specified in MES SSR 2020. | 50 | Per Cum | 590 ₹29,500 Lowest | 605 ₹30,250 | 619 ₹30,950 | 640 ₹32,000 |
| 1.02 | Dismantling RCC work in roof, floors (other than ground floors), beams, Staircases, landing including reinforcement cut as required to facilitate demolition complete all as sp. in MES SSR 2020. | 25 | Per Cum | 1,750 ₹43,750 Lowest | 1,785 ₹44,625 | 1,905 ₹47,625 | 1,772 ₹44,300 |
| 2.00 | Earth work in excavation in trenches n.exc. 1.5 M wide and 1.5M deep and getting out, returning filling in, including spreading & leveling in layers all as specified in MES SSR 2020. | 150 | Per Cum | 175 ₹26,250 Lowest | 192.8 ₹28,920 | 292 ₹43,800 | 210 ₹31,500 |
| 3.01 | M/L PCC bed 1:5:10 in fillings & Mass concrete all as specified in MES SSR 2020. | 40 | Per Cum | 3,205 ₹1,28,200 | 3,390 ₹1,35,600 | 3,084 ₹1,23,360 Lowest | 3,210 ₹1,28,400 |
| 3.02 | M/L RCC work 1:1½:3 for slabs supported on walls, columns , roofs, landing, balconies, canopies deck slabs and in shelves and the like all as specified in MES SSR, 2020 | 70 | Per Cum | 7,403 ₹5,18,210 | 7,390 ₹5,17,300 Lowest | 7,490 ₹5,24,300 | 7,610 ₹5,32,700 |
| 3.03 | M/L RCC work 1:1½ :3 for foundation including raft footing foundation beams plinths beams bases for columns basement slabs under reamed piles and mass concrete and the like all as specified in MES SSR, 2020. | 45 | Per Cum | 7,205 ₹3,24,225 | 6,290 ₹2,83,050 | 6,430 ₹2,89,350 | 5,860 ₹2,63,700 Lowest |
| 4.01 | M/L brick work except brick in cement mortar 1: 4 straight or curved on plan exe. 6m mean radius with sub class ‘A’ bricks all as specified in MES SSR 2020. (including removing mortar from and cleaing bricks). | 20 | Per Cum | 3,048 ₹60,960 | 2,990 ₹59,800 | 2,713 ₹54,260 Lowest | 3,132 ₹62,640 |
| 4.02 | M/L of brickwork with fly ash bricks class designation 75 (Kgf/cm2) straight or curved on plan exc 6m mean radius built in cement mortor 1:4 all as specified in MES SSR 2020. | 50 | Per Cum | 6,100 ₹3,05,000 | 6,145 ₹3,07,250 | 5,823 ₹2,91,150 Lowest | 6,000 ₹3,00,000 |
| 5.00 | M/L sand filling under floors including watering & well ramming all as specified in MES SSR,2020 | 80 | Per Cum | 1,225 ₹98,000 | 770 ₹61,600 Lowest | 1,485 ₹1,18,800 | 1,070 ₹85,600 |
| 6.00 | Removing of Malba/dismantle material to a distance upto 05 Km. | 50 | Per Cum | 385 ₹19,250 | 410 ₹20,500 | 505 ₹25,250 | 360 ₹18,000 Lowest |
Tender Value
₹49.3 L
EMD Value
₹99,000
Closing Date
3 Jun 2026, 5:00 pmClosed
Chief Executive officer.
229, Race Course Road, Cantonment Board office, Ambala Cantt.
As per tender documents.
2026_DGDE_766729_1
ACB/AE/TDR/2026/04/02
Open Tender
Civil Works - Others
Works
270 days
Ambala Cantt
As per tender documents.
3 documents required · 3 mandatory
₹1,500
Chief Executive officer
₹99,000
18 Jun 2026
22 May 2026
4 Jun 2026
22 May 2026
3 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling Brickwork built in C. Mortar all as specified in MES SSR 2020. | - | Per Cum | 100 | - |
| 1.02 | Dismantling RCC work in roof, floors (other than ground floors), beams, Staircases, landing including reinforcement cut as required to facilitate demolition complete all as sp. in MES SSR 2020. | - | Per Cum | 100 | - |
| 2 | Earth work in excavation in trenches n.exc. 1.5 M wide and 1.5M deep and getting out, returning filling in, including spreading & leveling in layers all as specified in MES SSR 2020. | - | Per Cum | 100 | - |
| 3.01 | M/L PCC bed 1:5:10 in fillings & Mass concrete all as specified in MES SSR 2020. | - | Per Cum | 100 | - |
| 3.02 | M/L RCC work 1:1½:3 for slabs supported on walls, columns , roofs, landing, balconies, canopies deck slabs and in shelves and the like all as specified in MES SSR, 2020 | - | Per Cum | 10 | - |
| 3.03 | M/L RCC work 1:1½ :3 for foundation including raft footing foundation beams plinths beams bases for columns basement slabs under reamed piles and mass concrete and the like all as specified in MES SSR, 2020. | - | Per Cum | 10 | - |
| 4.01 | M/L brick work except brick in cement mortar 1: 4 straight or curved on plan exe. 6m mean radius with sub class ‘A’ bricks all as specified in MES SSR 2020. (including removing mortar from and cleaing bricks). | - | Per Cum | 10 | - |
| 4.02 | M/L of brickwork with fly ash bricks class designation 75 (Kgf/cm2) straight or curved on plan exc 6m mean radius built in cement mortor 1:4 all as specified in MES SSR 2020. | - | Per Cum | 10 | - |
| 5 | M/L sand filling under floors including watering & well ramming all as specified in MES SSR,2020 | - | Per Cum | 10 | - |
| 6 | Removing of Malba/dismantle material to a distance upto 05 Km. | - | Per Cum | 10 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_859058.xls
BOQ • 0.34 MB
tenderdoc49RHAparade.pdf
Tender Documents • 1.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .