Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹49.6 L
EMD Value
₹50,000
Closing Date
23 Nov 2026, 6:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Salinity Control Division, Porbandar
DISMANTLING & RECONSTRUCTION OF BOX CULVERT ACROSS SARAN RIVER AT VILLAGE SINDHPUR IN KUTIYANA TALUKA & DIST PORBANADAR.
364212
13 of 2026-27
Open
Civil Works - Others
Works
Porbandar
12 documents required · 11 mandatory · 1 optional
₹1,500
Executive Engineer, Salinity Control Division, Porbandar
₹50,000
7 Nov 2026
7 Nov 2026
7 Nov 2026
23 Nov 2026
7 Nov 2026
120 days
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be
the actual quantities of work ordered and carried out, as measured by the
Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities, where applicable, and otherwise at such
rates and pricesas the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in
sofar as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates
and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for this work. For building works specifications for building are to
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by
ripping with a tractor of at least 150 kw with a single rear mounted heavy duty
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book figures
of specifications)
1 Dismantling road surface including 307.00 Cumt. 681.00
sorting & Stacking of useful and
unuseful material from the
dismantled materials as directed
under detailed specification etc
complete. (a) Cement Concrete
2 Excavation in all sort of strata and 257.00 Cumt. 176.00
formations incl.depositing the
unuseful excavated stuff as and
where directed incl sorting and
stacking useful materials as
directed upto 200 mt lead and all
lift etc. complete incl.dewatering.
(B) IN SOFT ROCK.
3 Supplying and Stacking of Machine 55.00 Cumt. 763.25
Crushed Stone Aggregates, chippings
of Hard Stone 25 to 50 mm size free
of disintegrated pieces of deleterious
and organic matter ( for W.B.M.Road )
and grading as per I.R.C. code with
10.00 K.M. lead including filling
4 Spreading the stone aggregate for 55.00 Cumt. 274.73
rolling and W.B.M. including filling
the interstices to required camber
and radient (excluding spreding of
(iii) 25mm to 50 mm size crushed
5 Prov. & Laying in position 443.00 Cumt. 3822.00
"Nominal Mix" cement concrete
using cement, sand and crushed
aggregate by machine mix
including necessary formworks,
centering, scaffolding, compaction
by mechanical vibrator, curing as
directed with all lead & lift etc. C)
Concrete grade 1:2:4 and MSA-
6 Prov. & Laying in position 290.00 Cumt. 5372.00
Controlled cement concrete using
cement, sand and crushed
aggregate by mass and machine
mixfor R.C.C./ CCwork including
necessary formworks, centering,
scaffolding, compaction by
vibrator, curing as directed with all
lead & lift etc complete Excluding
the cost of Reinforcement
FOR SOLID SLAB AND LOFTS
a. Concrete grade M-25 and MSA-
7 Providing,cutting,bending,binding 17.74 M.T. 75789.00
and fixing in position as per
drawing H.Y.S.D. BAR
reinforcement for R.C.C. works and
anchor bars incl cost of black
annealed 16 to 18 BWG M.S.. Wire
etc.complete with all lead and lift.
8 Back filling with appropriate 394.00 Cumt. 84.00
excavated material behind the
structures or refilling the trenches
with excavated useful material
including watering ramming,
consolidation etc. complete with all
9 Providing and fixing gauge post 4.00 Rmt. 821.00
with M.S.Channel of size
150x75x5mm of required length as
per design with necessary
foundation and with painted
enameled plate and fixing it on MS
channel etc complete with
necessary oil paint.
10 Providing & filling in contraction 20.00 Sqmt. 702.00
joints with 12mm thick bitumen
sheet of approved quality as
Total Amount :-
Total Amount :-
In words (RUPEES FOURTY NINE LACS FITY SEVEN THOUSAND THREE
HUNDRED THIRTY AND SEVENTY SIX PAISA ONLY.)
I/We am/are willing to carry out the work at….......................% above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book figures
of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… By
(C)Net Tendered Amount (A-B) (in figure) ……………………………… EE
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analys`is Standard Cement Consumption has been taken as
per Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference
of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Salinity Control Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice No. 13 of 2026-27 .pdf
Sindhpur Box SBD.pdf
BOQ sidhpur SBD.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .