| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.8 L+₹20,278 (4.44%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.6 L+₹1.0 L (21.9%)Rejected-Finance 2107 SUB TREASURY KOOTTANAD THRITHALA BLOCK PANCHAYATH | L3 | Rejected-Finance L3 | |
| 4 | L4₹5.6 L+₹1.1 L (23.0%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹5.1 L
EMD Value
₹12,682
Closing Date
4 Nov 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE
LSGD OLAVANNA
224/23-G L P S OLAVANNA CLASS ROOM WORK IN OLAVANNA GP
2022_LSGD_521118_1
AE/OLV/4/23
Open Tender
Civil Works - Buildings
Item Rate
180 days
OLAVANNA
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,120
Yes
₹12,682
Yes
17 Dec 2022
27 Oct 2022
5 Nov 2022
27 Oct 2022
4 Nov 2022
27 Oct 2022
Amount
building
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete
13.4.2:12 mm cement plaster of mix:1:6 ( 1 cement : 6 coarse sand)
13.17:6 mm cement plaster 1:3 ( 1 cement : 3 fine sand) finished with a floating coat of neat cement and thick coat of Lime wash on top of walls when dry for bearing of R.C.C. slabs and beams.
ADHARSH K
MUKUNDAN
MUHAMMED AFSAL EP
Bidder Name
MUKUNDAN
MUHAMMED AFSAL EP
ADHARSH K
DEVADASAN P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .