Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC R O VILL POST OFFICE MUMTA TEHSIL NAGROTA BAGWAN | ₹10.4 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹10.7 LRejected-Finance VPO BAGLI TEHSIL DHARAMSHALA DISTT KANGRA H P | DHARAMSHALA | KANGRA | HIMACHAL PRADESH | ₹10.7 L | L2 | Rejected-Finance HIGHEST BIDDER |
| 3 | L3₹10.9 LRejected-Finance | ₹10.9 L | L3 | Rejected-Finance LOWEST BIDDER |
Updated dates
Tender Value
Refer Docs
EMD Value
₹10,539
Closing Date
20 Feb 2026, 10:00 amClosed
Sr. Xen HPSEBL ED Jawalamukhi
O/o Sr. Xen HPSEBL ED Jawalamukhi
Tender for Prov. SOP for CO 10 Nos. 7 Nos. Tubewell in Bharoli and Jawalamukhi area at Vill. Digger in E Section Adhwani under HPSEBL ESD No 2 Jawalamukhi LIS Digger 4th
2026_HPSEB_127717_1
JED-E-43/2025-26
Open Tender
Electrical Works
Adhwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹10,539
31 Mar 2026
7 Feb 2026
20 Feb 2026
7 Feb 2026
20 Feb 2026
7 Feb 2026
11/0.4 kV, 25 kVA Distribution Sub-Station- LIS Digger 4th
1. ERECTION OF Sub Station Structure: Digging of Pit for 2 Nos Poles, Drilling of Holes in X-arm, Preparation of Platform Structure Members CI, AI i.e Knee Bracing Set, Erection of Double Pole, Concreting 1:1.5:3( 1 Cement : 1.5 Coarse Sand: 3 graded Stone), Erection of Platform, Erection of X-arm, Erection of Drop out Fuse, Erection of Stay Sets , Erection of Jumper, Erection of 3 Nos Earth i.e Digging of Pit, Fixing of Earth Rod, clamp, Earth Wire and Concreting of structure, Providing Charcoal and Salt for Earthing & Filling the pit With Material , Providing Earthing Conn. To GO Switch Lightening arrestor etc & Pole, Providing Earthing to Transformer, LT Box, Meter etc, Erection of Barbed wire and painting complete job in all repect
Erection of 25 kVA Transformer , LT Box , MCCB Switch, Cable, Service Cable and Energy Meter
Transportation Charges of 11/0.4 kV 25 KVA DTR including manual Carriage of Material From Road Side to Site of Work.( average Lead 0.5km)
Pro and Fixing Chain linking fencing , angle iron, gate etc for transformer fencing.
Supply Part of 11/0.4kV, 25 kVA Distribution Sub-Station LIS Digger 4th
Prov. Distribution Transformer (Ordinary), 11/0.4KV 25 KVA
Prov. Steel Tubular Poles (9 m working load > 200 kgf/m²)
Prov. Muffs with Concerete Filling
Prov. X-Arm: Channel Iron (100×50×5 mm), Length: 2800 mm × 2 Nos.
Prov. MS Angle Iron (50×50×6 mm), Length 2800 mm × 1 Nos for LA
Prov. X-Arm: Channel Iron (75×40×6 mm), Length: 2800 mm × 4 Nos. for supporting D.O. fuse unit & G.O. Switch
Prov. Transformer Belting & Knee BracingProv. X-Arm: Channel Iron (100×50×5 mm), Length: 2800 mm × 2 Nos.
Prov. X-Arm: Channel Iron (100×50×5 mm), Length: 460 mm × 2 Nos. For Supporting Main Channel of Transformer.
Prov. MS Angle Iron (50×50×6 mm), Length 2800 mm × 2 Nos
Prov. MS Angle Iron (35×35×5 mm), Length 460 mm × 2 Nos
Prov. MS Angle Iron (50×50×6 mm), Length 950 mm × 2 Nos for Bed Knee Bracing
Transformer LT Distribution Box and GO Switch fixing assembly. Prov. MS Angle Iron (50×50×6 mm), Length 2800 mm × 2 Nos
Prov. MS Angle Iron (50×50×6 mm), Length 450 mm × 2 Nos
GO Switch Handle Supporting (Channel Iron(75x40x6 mm) length 460 mm
Prov. G.O. AB Switch Unit (11KV, 400A, 25 KA) Tripple pole O/D Type
Prov. D.O. Fuse Unit
Prov. Surge Arrester, 9 KV Station Class (Porcelain Type)
Prov. Disc Insulator Sets (comprising 1 No Disc: Porcelain, BS, 12KV, 90 KN) including Dead End Clamps etc
Prov. Stay Set Complete
Prov. Stay Wire (7/3.15 mm) (7.0 kg per stay set)
Prov. Pipe Earthing Set
6 SWG GI wire for earthing
Prov. LT Distribution Panel Box 25 kva Dtr
Prov. Half Clamp (M.S. Flat 50×6 mm)
Prov. Full Clamp (M.S. Flat 50×6 mm)
Prov. Nuts & Bolts of various sizes (Galvanised / Coated) Preferably 16 mm ø or more (with flat and spring washers)
Prov. Aluminium Thimble
Prov. Copper Thimble
Prov. Danger Plate
Prov. Barbed Wire
Prov. LT Cable (3.5 Core 35 mm²)
Prov.3 phase 4 wire ct opetated meter 50/5 AMP
Prov. Aluminium Paint
LT switched capacitor 9 KVAR for 25 Kva
Prov. Red Oxide
HP Make Desktop I-5 pocessor 12 Th Genration for the moderanisation of existing system
11 Kv HT Line to Proposed 11/0.4 kV 25 kVA Distribution Sub-Station LIS Digger 4th
Supply part of 11 kV HT line
Prov. ACSR/AAAC 7/3.81 (80mm²)
ST Pole 11 Mtr Long With BP
Prov. Muffs with concerete filling
Run through structure: Prov. Cross Arm: Channel Iron (100×50×6 mm), Length (1270 mm × 8 structure
Prov. Angle Iron (50×50×6 mm), Length (2×750) mm × 8 structures
Prov. Pole Top Bracket
Dead End Structure: Prov. Belt - MS Angle Iron: 50×50×6, Length [1800 mm × 2 No.]
Prov. X-Bracing Set - MS Angle Iron: 50×50×6, Length [2125 mm × 2 No]
Prov. X-Arm (Horizontal) - MS Channel Iron: 100×50×6, Length [2340 mm × 2
Prov. Discs Insulator sets on Dead End Stuctures comprising 1 No. Disc: ^^ (Porcelain, BS, 12kV, 90 KN) including Dead End Clamps etc
Prov. 11KV Pin Insulators (Porcelain, 12kV, 10KN) 3 No per double pole structure
HT Stay / Guy Arrangrment: Prov. Stay set complete in all respect (1 No. / Single Pole, 4 No. / Double Pole
Prov. Stay Wire (7/3.15 mm)
Earthing: Prov. HT Earthing Set Complete
Prov. Single Continous Earth Wire (G.I. 8 SWG)
Prov. Eye Hook for Earth Wire
Prov. Half Clamps
Prov. Full Clamps
Prov. Danger Plate (250×200×1.6mm)
Prov. Nuts and Bolts of various sizes (Galvanised/Coated) 16 mm
Prov. Barbed Wire
Prov Red Oxide
Prov. Aluminium Paint
Prov. 11 kV G.O Switch (11 kV , 400 A, 25 kA )
GO Switch Handle Supporting (75x40x6 mm), Length : 460 mm)
D.O fuse unit
Voltage Detactor
ERECTION OF 11KV HT LINE : Erection of Double Pole / Dead Pole Structure with Steel Tubular Pole as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.
Erection of Single Pole Run through Structure with Steel Tubular Pole Mtr Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.
Transportation Charges of HT line including manual Carriage of Material From Road Side to Site of Work.( AVG lead 0.2)
Erection of Stay Set (HT) as per latest standard practices /specification of REC / HPSEBL including Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Laying of Conductor, Stringing, Sagging of AAAC,80mm² /7/3.81mm² and binding with Insulators (3 wires) and fixing of jumper.
Laying of Earth wire with GI Wire 8 SWG , Stringing, Sagging of and binding with Insulators.
Erection of GO Switch along with connection to earth pit complete in all respect
Erection of HT Earthing set complete in all respect
3- phase LT line to proposed 11/0.4 kV 25 kVA Distribution Sub-Station LIS Digger 4th
Supply Part of LT line
Prov. AAAC 7/3.15 (50mm²) (includes 3 conductor lengths for 3Ø and additional 1% sag, jumpering & wastage)
Prov. Steel Tubular Poles (8 m working load > 200 kgf/m²)
Prov. Muffs with concerete filling
Prov. Shackle Insulator (16 KN)
Prov. D-Iron (U-Clamps)
Prov. Earth Knob
Prov. LT Stay Set
Prov. Stay Wire (7/3.15mm²) (6.0 kg per stay set)
Prov. Earth Wire (G.I. 8 SWG) {Additional 1% sag and wastage}
Prov. Nuts and Bolts of various sizes (Galvanised / Coated)
Prov. Aluminium Paint
Earthing Set complete
Red Oxide
Prov. Full Clamp
Prov. Egg Insulator
Prov. Half Clamp
Erection Part of LT line
ERECTION OF ST Pole : Erection of ST pole i.e digging of pit, drilling of hole in pole X-arm, erection of pole , Erection of x-arm Shackle insulator Filling of pit and ramming complete in all respect.
Transportation Charges of LT line including manual Carriage of Material From Road Side to Site of Work.( average Lead 0.2km)
Erection of Conductor :- Laying of Conductor, Stringing, Sagging of AAAC, 50mm² /7/3.15mm² and binding with Insulators complete in all respect
Erection of LT stay set:-Digging of pit, Fixing of stay rod Nozzelling and Tightening
Erection of GI wire:- laying of wire, stringging and sagging and binding with insulator.
Erection of Earthing set complete in all respect
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
prequalification.rar
Tender Documents • 0.67 MB
Technical.rar
Additional Documents • 6.28 MB
BOQ_188663.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid