| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance | +21.44% | ₹10.0 L | L1 | Admitted-Finance |
| 2 | L2₹10.1 LAdmitted-Finance | +23.24% | ₹10.1 L | L2 | Admitted-Finance |
| 3 | L3₹10.4 LAdmitted-Finance | +25.79% | ₹10.4 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹16,500
Closing Date
19 Feb 2026, 11:00 amClosed
Drawing and Disbursing Officer
Tripura University
Construction of an Entrance Gate for connecting old campus to new campus
2026_TU_896277_1
03/DR(Dand P)TU/CIVIL/25-26
Open Tender
Civil Works
Tripura University
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Tripura University
₹16,500
Tripura University
10 Mar 2026
30 Jan 2026
20 Feb 2026
30 Jan 2026
19 Feb 2026
30 Jan 2026
30 Jan 2026 - 5 Feb 2026
5 Feb 2026
14.7 Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50m etc. complete as per direction of the Engineer- in-charge:-14.7.3 In cement mortar.
Buy back of existing bricks and usable materials from the dismantled wall and disposal as per direction of Engineer-In-Charge.
Lumpsum deduction for available scraps and steel
2.12 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. -All kinds of soil
2.13 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil
2.16 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil
2.19 Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level:4.1.6 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 40 mm nominal size)
5.1 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level:5.1.2 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
5.3 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-5.3.2 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
5.19 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.5.19.4 Thermo-Mechanically Treated bars of grade Fe-500D or more
5.8 Centering shuttering including struttings, propping etc. and removal of form work for:5.8.1.1 Foundations, footings, bases for columns etc. for mass concrete with timber plank
5.8.4.1 Suspended floors, roofs, landings, balconies and access platform with timber planks
7.2.4 14 mm thick Granite of any colour and shade duly approved:-7.2.4.2 Area of slab over 0.50 sqm.
9.15 Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:-9.15.2 In grating, frames, guard bar, railing, brackets, gates and similar works, all complete.
6.1 First class brick work in foundation and plinth including cost of all materials as required complete:-6.1.3 In cement mortar 1:4 ( 1 cement : 4 fine sand ).
6.12 Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-6.12.3 In cement mortar 1:4 ( 1 cement : 4 fine sand ).
12.59 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade [Payment shall be made after submission of Test Certificate issued by the Manufacturer]: 12.59.1 Two or more coats on new work
12.41 Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] : 12.41.1 New work ( two or more coats applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Tendernotice_2.pdf
PDF • 2.10 MB
BOQ_942060.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid